Permit Information
Permit NumberELE19-01406
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 139 E WARM SPRINGS AVE
Project NameRonald McDonald House
Customer Number3904
ePlanReviewNo
Description
New: Full ground up construction of new building including conduit, wiring, gear, panels, lights, lighting control, receptacles, fire alarm, telecomm, and security.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/14/20201/15/20201/15/2020PPASS
DetailsRock A. Hudson
All site work now complete, all lighting controls tested through third party. Phone #: ###-#### Inspection requested via web by John Mittleider Final ok
Conference1/2/20201/2/20201/2/2020PDONE
DetailsRock A. Hudson
Contact John about a work around for getting a final without site bench lighting and USB nightstand receptacles installed. Separate permitting possibly? The General Contractor wants in on the conversation. Available after 1:00 p.m. today. Phone #: ###-#### Inspection requested via web by Tom Betty
Discussed with Heather, (project manager with ESI) that all electrical items listed on building permit shall be completed, (site work), prior to issuing a final. All wiring shall be safe for areas that public will have access, (site work). Each room has a piece of furniture with a USB and 120 volt boxless receptacles that according to cut sheet is assembled and installed in furniture at factory and plugs into a wall receptacle. Hoping to verify listing by 1-20-20.
IECC 2015 C408.3.1- Lighting system functional testing. Prior to passing final inspection, the registered design professional shall provide evidence that the lighting control systems have been tested to ensure that the control hardware and software are calibrated, adjusted, programmed, and in proper working condition with construction documents and manufacturers instructions.
Final12/19/201912/19/201912/19/2019PPART
DetailsRock A. Hudson
Reinspection of level 1 area A GFCI protection and exterior mechanical pads. Phone #: ###-#### Inspection requested via web by John Mittleider
Items left to check- all of court yard, site lighting, fixed furniture in units.
All units, offices, kitchens, and misc rooms ok. Checked all of 1A, HVAC on exterior, christmas and rest attached to building except court yard. TCO ok
Final12/18/201912/18/201912/18/2019PPART
DetailsRock A. Hudson
Reinspect 30 guest unit arc fault devices. Phone #: ###-#### Inspection requested via web by John Mittleider
All areas in 1B, 2A, 2B AFCI checked ok. Fire penatrations caulked, TCO for areas noted ok
Final12/12/201912/12/201912/12/2019PPART
DetailsRock A. Hudson
Final walk 25 more rooms. 5 kitchenettes . 4 electrical rooms Phone #: ###-#### Inspection requested via web by John Mittleider
210.8(B)(2)- All 120 volt to ground single phase receptacles 50 amp or less shall have GFCI protection. Disposals, counter receptacles, ansil receptacles, refrigerators, and ranges.
314.20- Boxes mounted in a combustible wall cover shall be flush or have extension rings installed. A114 Security and data rm.
314.25- All boxes shall have covers. Play rm above grid, cooler bell box.
404.9- House keeping 2 gang switch cover missing.
422.5(A)(2)- Drinking water coolers shall have GFCI protection. 2 needed.
No training shall take place in areas with violations. Approved for storage only.
As per Daryl Degrange ok to move in furniture.
Electrical Rough-In12/10/201912/10/201912/10/2019PPART
DetailsRock A. Hudson
Pre final walk 22 rooms. Level 2 area B Phone #: ###-#### Inspection requested via web by John Mittleider
210.8- Christmas receptacle GFCI devices shall be located in a readily accessible location. 209 not ready, level 2 TDR rm HVAC not done. Units and corridors B 201 thru 208 and 210 thru 221 and east stair TCO ok
Electrical Rough-In12/10/201912/10/201912/10/2019PPART
DetailsRock A. Hudson
Pre final walk 22 rooms. Level 2 area B Phone #: ###-#### Inspection requested via web by John Mittleider
Area 1B units 101 thru 108, 110 thru 124 units and corridors TCO ok
Conference12/7/201912/9/201912/9/2019APASS
DetailsRock A. Hudson
Conference to discuss if 210.12 A5 will fit our installation. Prefinal walk/test 20 rooms area 1B. Phone #: ###-#### Inspection requested via web by John Mittleider
Discussed code reference noted. As long as wiring method is compliant with 250.118, metal raceways and cables from suppy to destination a AFCI device is acceptable.
422.31(B) or 422.34- Either unit switch with an off position or lockout at branch circuit source or disconnecting means at location.
Final12/9/201912/9/201912/9/2019PPART
DetailsRock A. Hudson
Conference to discuss if 210.12 A5 will fit our installation. Prefinal walk/test 20 rooms area 1B. Phone #: ###-#### Inspection requested via web by John Mittleider
109 not ready, 101 thru 124 units and corridors TCO ok
Electrical Rough-In12/6/201912/6/201912/6/2019PPART
DetailsRock A. Hudson
Ceiling inspection game room and play room. Prefinal inspection for level 2A and level 1B Phone #: ###-#### Inspection requested via web by John Mittleider
Game room and play room grid rough in ok cover.
Checked guest rooms 211 thru 215, and 217, 218, 252 thru 262. All checked ok except...
210.12(C)- AFCI protection shall be provided for all 15 and 20 amp 120 volt receptacle outlets located in guest rooms of hotel and motels. None protected at time of inspection.
Electrical Rough-In11/20/201911/20/201911/20/2019PPASS
DetailsRock A. Hudson
Site underground and pole base Phone #: ###-#### Inspection requested via web by John Mittleider
HVAC underground up tight to building and 2 south pole bases rough in ok cover
Electrical Rough-In10/30/201910/31/201910/31/2019APASS
DetailsRock A. Hudson
Contact John for westside site pole bases. Phone #: ###-#### Inspection requested via web by Tom Betty
2 S W pole bases rough in ok cover
Electrical Rough-In10/18/201910/18/201910/18/2019PPASS
DetailsRock A. Hudson
Contact John M. for rough in above ceiling work. Phone #: ###-#### Inspection requested via web by Tom Betty
As per BCC 4-05-23- It shall be unlawful to cover any wiring or equipment in anyway until the same has first been inspected by an electrical inspector. Boarders were done in area A. Future cover prior to inspection will be required to be removed completely.
Area A grid rough in ok cover
Rough-In Permanent Service8/14/20198/14/20198/14/2019PPASS
DetailsRock A. Hudson
Permanent Service Inspection and Cover inspection for exterior soffits, SE stairwell, and 2nd floor fur outs.
Contact John Mittleider.
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Areas noted with fur outs in B204, B206, B215, B218 rough in ok cover 55k available fault current
p/s u/g n ok
Electrical Rough-In8/5/20198/5/20198/5/2019PPASS
DetailsRock A. Hudson
Level 2 area B unit ceilings and walls. Phone #: ###-#### Inspection requested via web by Tom Betty
Area noted and level 1 alcove ceiling rough in ok cover
Electrical Rough-In7/30/20197/30/20197/30/2019PPASS
DetailsRock A. Hudson
Level 2 area A corridor and entry drops. Phone #: ###-#### Inspection requested via web by Tom Betty
Area noted adding N.W. exterior columns rough in ok cover
Conference7/30/20197/30/20197/30/2019PCANC
DetailsRock A. Hudson
Electrical and Mechanical.
Newer AC unit installed on north west corner of building, no permit found for ELE or MEC.
Misc electrical issues after previous tenant vacated.
Wrong permit scheduled
Electrical Rough-In7/24/20197/24/20197/24/2019PPASS
DetailsRock A. Hudson
Cover inspection SW stairwell. Phone #: ###-#### Inspection requested via web by Tom Betty Level 2 publec bathroom ceilings, S.E. stairway soffit ok to build, and S.W. as noted rough in ok cover.
Electrical Rough-In7/17/20197/19/20197/19/2019APASS
DetailsRock A. Hudson
A155, B104, 105,106,118,122,123,162 Phone #: ###-#### Inspection requested via web by Tom Betty
Areas noted with addition of area B corridor walls and lids rough in ok cover
Electrical Rough-In7/17/20197/18/20197/17/2019ACANC
DetailsRock A. Hudson
Units A155, B104,105,106,118,122,123 and 162. Contact James Johnson. Phone #: ###-#### >> Inspection requested via web by Tom Betty Inspection cancelled from web by: Tom Betty
Electrical Rough-In7/15/20197/16/20197/16/2019APASS
DetailsRock A. Hudson
Level 1 area B ceilings and walls. Phone #: ###-#### Inspection requested via web by Tom Betty Area B except 104, 105, 106, 118, 119, 122, 124, 162. Rest of walls and hardlids rough in ok cover
Electrical Rough-In7/11/20197/12/20197/12/2019APASS
DetailsRock A. Hudson
4 level 1 kitchen pony walls and level 1 area B lids. Phone #: ###-#### Inspection requested via web by Tom Betty
Level 1 area B not ready. Kitchen and breakroom changes in walls rough in ok cover
Electrical Rough-In7/10/20197/11/20197/11/2019APASS
DetailsRock A. Hudson
Level 2 area A and Southwest soffit can lights rough in. Contact James Johnson. Phone #: ###-#### Inspection requested via web by Tom Betty

Southwest flat soffits and level 2 area A corridor soffits rough in ok cover
Electrical Rough-In7/9/20197/9/20197/9/2019PPASS
DetailsRock A. Hudson
Level 2 area A wall rough in Phone #: ###-#### Inspection requested via web by Tom Betty
Drywall installers have been damaging wiring and have removed drywall for repair, informed future damage may take information for submission to state juristiction for penalty.
Area noted walls only rough in ok cover
Electrical Rough-In7/2/20197/3/20197/3/2019APASS
DetailsJames Ady
Level 1 kitchen walls. Level 2 area B hallway ceilings and top out. Phone #: ###-#### Inspection requested via web by Tom Betty 2nd floor Area B ceiling minus East vestibule Level 1 kitchen walls and area B ceiling
Electrical Rough-In6/26/20196/26/20196/26/2019PPASS
DetailsEric Story
Level 1 area 2 ceiling, level 2 area A unit ceilings and top out, level 2 B bathrooms and top out. Phone #: ###-#### Inspection requested via web by Tom Betty
Areas as noted for area1@2 with top out baths ok to cover ceilings
Electrical Rough-In6/21/20196/21/20196/21/2019PPASS
DetailsRock A. Hudson
Level 2 area A2 corridor ceilings and top out. Phone #: ###-#### Inspection requested via web by Tom Betty
Area noted rough in ok cover
Electrical Rough-In6/19/20196/19/20196/19/2019PPASS
DetailsRock A. Hudson
Level 1 A1 hard lid ceilings and level 1 area B laundry and shipping fire lids and top out. Phone #: ###-#### Inspection requested via web by Tom Betty
Added toy room top out added and other areas noted rough in ok cover.
Electrical Rough-In6/11/20196/12/20196/12/2019PPASS
DetailsRock A. Hudson
Fire lid/top out level 1 area B units rough in. Phone #: ###-#### Inspection requested via web by Tom Betty
No longer marking contractor print.
Area noted except laundry and shipping fire lids and top out walls rough in ok cover.
Electrical Rough-In6/7/20196/7/20196/7/2019PPASS
DetailsRock A. Hudson
Contact John Mittlieder for Level 1 A1 walls. Level 2 bathroom ceilings and top out rough in. Phone #: ###-#### Inspection requested via web by Tom Betty
Level 1 A1 walls and level 2 A1 bathrooms and corridor fire lids and top out rough in ok cover
Electrical Rough-In5/17/20195/20/20195/20/2019PPASS
DetailsRock A. Hudson
Fire lid and wall top out for area A. Phone #: ###-#### Inspection requested via web by Tom Betty
Rest of area (A)` fire lids and top out walls rough in ok cover
Electrical Rough-In5/14/20195/15/20195/15/2019APASS
DetailsRock A. Hudson
Contact John for area A level 1 walls. Phone #: ###-#### Inspection requested via web by Tom Betty
A1 sec. 1 top out 3 1/2' walls only rough in ok cover
Electrical Rough-In5/10/20195/13/20195/13/2019APASS
DetailsRock A. Hudson
Rough in inspection of area A above the fire lid. Phone #: ###-#### Inspection requested via web by Tom Betty
A1 section 1 fire lids as noted on contractor print rough in ok cover