Site Final | 4/23/2020 | 4/23/2020 | 4/29/2020 | P | PASS |
Andy J. Long
|
|
|
Site is landscaped. No ESC requests. ESC permit finaled.
|
General Inspection | 4/13/2020 | 4/13/2020 | 4/13/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 | | PASS |
Michael Zawacki
|
|
|
Area has been cleaned.Lot below getting landscaped, will be obvious if there is new runoff.
|
General Inspection | 3/12/2020 | 3/12/2020 | 3/16/2020 | | FAIL |
Michael Zawacki
|
|
|
On site rilling being caught by gator guard and running and blowing out at bottom.
|
General Inspection | 2/26/2020 | 2/26/2020 | 2/28/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/11/2020 | 2/11/2020 | 2/11/2020 | | PASS |
Michael Zawacki
|
|
|
Gatorguard correctly installed. Sidewalk clean.
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | | PASS |
Michael Zawacki
|
|
|
Gator guard reinstalled correctly. Still has rilling in yard, dirt is now contained.
|
Conference | 1/9/2020 | 1/10/2020 | 1/9/2020 | P | DONE |
Andy J. Long
|
|
|
Meeting with homeowner to discuss erosion occuring in front yard.
Requests: - clean up mud and dirt on sidewalk - repair gap in the perimeter gator guards where water and sediment flowed out. - rake out rill/channel that has formed - cover bare soil in front with straw and or compost to prevent raindrop erosion.
|
General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 | | FAIL |
Michael Zawacki
|
|
|
Sidewalk not clean, gator guard not repaired.
|
BMP Violation | 12/17/2019 | 12/19/2019 | 12/23/2019 | P | FAIL |
Michael Zawacki
|
|
|
Still dirt going under gator guards. Rills coming from lot.
|
General Inspection | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | FAIL |
Andy J. Long
|
|
|
Erosion occuring on unfinished yard noted on 12/6 has not been cleaned or any attempts at control or additional BMPs.
Notified RP homeowner that fines will be applied to the permit until he can get it cleaned up and controlled.
Foillow up scheduled for Thursday PM
|
General Inspection | 12/6/2019 | 12/6/2019 | 12/9/2019 | | FAIL |
Michael Zawacki
|
|
|
Some rilling went between the gator guard and left dirt on sidewalk.
|
General Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | | PASS |
Michael Zawacki
|
|
|
Perimeter is protected with gatorguard, no grass or ground cover. Trash has been cleaned up. Pipe still coming out of retaining wall.
|
General Inspection | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | FAIL |
Andy J. Long
|
|
|
Dirty sidewalk and gutter, loose dirt from unfinished landscaping.
Trash around the perimeter. Storm drain and/or foundation drains outlet to loose dirt areas. No grass or vegeation implemented.
Notifed RP to clean up and schedule a conference to discuss winterization.
|
General Inspection | 10/23/2019 | 10/23/2019 | 10/23/2019 | | PASS |
Michael Zawacki
|
|
|
Still needs landscaping. No mess or trash.
|
General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 | | PASS |
Michael Zawacki
|
|
|
Still not landscaped.
|
General Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 | | PASS |
Michael Zawacki
|
|
|
No trash or runoff. Still needs to be landscaped.
|
General Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | | PASS |
Michael Zawacki
|
|
|
Met with builder at site. Has inspection for drainage scheduled. Landscaping water is not hooked up yet, probably not to mid october. Lots of trash in driveway, will need to be hauled away soon.
|
General Inspection | 8/13/2019 | 8/14/2019 | 8/19/2019 | A | PASS |
Andy J. Long
|
|
|
Site is not yet landscaped. Will need to closely monitor and request temporary or permanent stabilization in September.
|
General Inspection | 8/2/2019 | 8/5/2019 | 8/13/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/31/2019 | 7/31/2019 | 8/2/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | | PART |
Michael Zawacki
|
|
|
All work in interior. Trash box is next to garage and full. Some plastic has blown out, some trash in lot below.
|
BMP Violation | 6/26/2019 | 6/27/2019 | 6/28/2019 | A | PASS |
Andy J. Long
|
|
|
Material stored in gutter has been removed. Sidewak and driveway somewhat swept. Approved.
|
BMP Violation | 6/25/2019 | 6/26/2019 | 6/26/2019 | P | FAIL |
Andy J. Long
|
|
|
Site not cleaned as requested. Extension granted because onsite crew member said they intend to clean it all up today and are behind schedule. Follow up scheduled, no further extensions on this request..
|
BMP Violation | 6/7/2019 | 6/10/2019 | 6/14/2019 | P | PASS |
Andy J. Long
|
|
|
Trash picked up. No new violations.
|
Random Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | FAIL |
Andy J. Long
|
|
|
Overflowing trash and loose debris next to driveeway.
Request to RP to clean up. Texted picture of violation.
|
General Inspection | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PART |
Andy J. Long
|
|
|
No new erosion or sediment runoff observed.
Correction request to pick up all loose trash around home and have dumpster emptied.
|
General Inspection | 5/10/2019 | 5/10/2019 | 5/16/2019 | P | PART |
Andy J. Long
|
|
|
Need trash pick up around bin and extend lining to gutter for roof top runoff.
No trackout or discharges.
|
Stop Work Order | 4/17/2019 | 4/19/2019 | 4/17/2019 | A | PASS |
Andy J. Long
|
|
|
per Andy- stop work, please contact Andy
SWO corrections complete. Parcel hold removed.
|
Conference | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | DONE |
Andy J. Long
|
|
|
Site walk through with RP to discuss corrections made and make additional corrections.
J- hook front gator guard wattles Extend lining between wattles to convey water to sidewalk.
SWO corrections have been completed and fees/fines paid. SWO removed. All parcel holds removed.
|
Stop Work Order | 4/10/2019 | 4/10/2019 | 4/15/2019 | A | FAIL |
Andy J. Long
|
|
|
SWO posted due uncompleted corrections. RP notified.
|
BMP Violation | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | FAIL |
Andy J. Long
|
|
|
Corrections completed: -sidwalk was swept, perimeter wattles re-installed along front - gravel check bag dams were cleaned. Still some mud behind them.
Corrections not complete: - Trash not emptied or picked up - washout from stucco and other materials dumped around trash pile, front yard, next to driveway - fees/fines assessed not paid before compliance date, no request for extension from RP-GC.
Stop Work Order posted. RP notified by phone. SWO due to uncompleted corrections as listed in the NOV and previous inspection report.
|
BMP Violation | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | FAIL |
Andy J. Long
|
|
|
Multiple violations: - overflowing trash - uncontained/cleaned up stucco washout causing runoff to have high pH - dirt on sidewalk and gutter. - gatorguards at bottom corner of lot need to be scooped out. - finish securing/improving and extending the roof top water conveyance to the street. Erosion occuring in between tarp lining and gatorguard.
Multiple requests have been issued. This site has not passed an ESC inspection since February.
NOV and fines issued.
|
General Inspection | 4/9/2019 | 4/9/2019 | 4/9/2019 | A | FAIL |
Michael Zawacki
|
|
|
post rainfall inspection Lioner from gutter has not been extended. Water is accumulating behind gator guards, also received water from uncontained stucco, ph is 11.4. Some sediment has made it past gatorguard. Drywall has been removed, trash bin is full again.
|
General Inspection | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | FAIL |
Andy J. Long
|
|
|
Homeowner RP installed lined channel to direct roof top water off lot without eroded the dirt in front yard.
Arrived on site to see crew rinsing mud and stucco debris off sidewalk and street to gutter. Requested they immediately stop and sweep the material and no rinsing.
correction requests: - secure lining for rooftop drainage with landscaped pins or more plastic sheeting - clean up sediment trapped behind gravel check bags below project - pick up loose trash, empty full trash bin and remove pile of wallboard - sweep sidewalk
|
Site Preparation | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | CANC |
Andy J. Long
|
|
|
|
Complaint Inspection | 3/26/2019 | 3/26/2019 | 3/28/2019 | P | FAIL |
Andy J. Long
|
|
|
Roof top runoff causing onsite erosion and offsite sediment runoff to street and gutter.
RP-GC needs to correct and schedule conference.
|
General Inspection | 3/14/2019 | 3/15/2019 | 3/19/2019 | P | PEND |
Andy J. Long
|
|
|
Conference to review correction requests from 3/12.
- perimeter sediment controls have been re-installed. Several sections need more backfill and must be staked with pins provided with gatorguard. Reviewed installation with RP.
- trash has been picked up and bin emptied
- request to install energy dissipation where roof runoff is hitting ground. Need to install check dams in channel next driveway that directs roof water to the sidewalk and gutter. Will recommend trying compost or sod.
- reviewed requirement to file eNOI for CGP 2017 coverage
Follow up 3/22
|
General Inspection | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | FAIL |
Andy J. Long
|
|
|
-Remove accumulated mud and dirt from behind perimeter sediment controls.
- inspect and re-install all gator guard wattles as needed.
- rake out rills and channels around the front banks. Track slopes and plan to implement temporary stabilization or ground cover.
- Homeowner needs to file their own NOI for CGP 2017 and follow subdivsion SWPPP.
Corrections are due Friday 3/22. Inspection report emailed to homeowner RP.
|
General Inspection | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PART |
Michael Zawacki
|
|
|
Gator guard worked during rain event. Sediment needs to be removed from behind. Access to lower lot has been blocked, needs garbage pickup.
|
Conference | 2/14/2019 | 2/14/2019 | 2/15/2019 | P | FAIL |
Andy J. Long
|
|
|
Muddy runoff, runoff from uncontained concrete washout dump, and other issues at site.
Need to clean up, schedule removal of the concrete washout ASAP. Install fence on adjacent lot to prevent unauthorized access.
If not completed by end of Month, the site will be issued a SWO.
Verbal correction request to RP-homeowner Brad.
|
General Inspection | 2/11/2019 | 2/13/2019 | 2/13/2019 | P | PEND |
Andy J. Long
|
|
|
No signficant runoff from site, perimeter sediment controls seem to be work and driveway is poured.
Still need to clean up concrete dumped on adjacent site.
|
Conference | 2/5/2019 | 2/5/2019 | 2/11/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/24/2019 | 1/30/2019 | 1/31/2019 | P | FAIL |
Michael Zawacki
|
|
|
New washout was constructed and overfilled. Washout dumped on lower lot not cleaned. Gravel bags not fixed or removed. Lots of trackout. Requested repairs from conference not done.
|
Conference | 1/22/2019 | 1/23/2019 | 1/24/2019 | P | DONE |
Andy J. Long
|
|
|
Street and sidewalk have been swept. Gatorguard perimeter sediment control is trenched in and not broken.
Correction requests: - remove dirt and sand captured behind gravel bag check dams in gutter on south side of street (same side as house) - replace broken gravel check bags - install new lined washout pit for driveway work - clean up washout dumped on lower lot, prevent access by workers or vehicles onto this lot
|
BMP Violation | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | PEND |
Andy J. Long
|
|
|
Trackout cleaned up. Additional BMP maintenance required.
|
Complaint Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | FAIL |
Andy J. Long
|
|
|
Mud and dirt tracked out from accessing lot below home and driving around. RP out of town,
Subdivision RP John to order street sweeper for tonight to try to beat the rain storm that has been predicted.
Final trackout warning to RP. Will need to do through sweep, clean up, and maintenance on all BMPs.
|
General Inspection | 1/17/2019 | 1/17/2019 | 1/18/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 | P | PART |
Michael Zawacki
|
|
|
WIP on home. Lots of mud coming off lot.
|
General Inspection | 12/11/2018 | 12/11/2018 | 12/13/2018 | P | PART |
Michael Zawacki
|
|
|
Site is muddy but contained. Road is dirty. Talked to builder on site, sweeper is coming and street being scraped, stained from dirt.
|
General Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PEND |
Andy J. Long
|
|
|
WIP pouring foundation. Small washout for chutes, no washout pit for pump truck. Requested RP to check on conditions and do any clean up if pump truck dumped.
|