Site Final | 3/28/2017 | 3/28/2017 | 3/28/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 3/28/2017 | 3/28/2017 | 3/28/2017 | | PASS |
Melissa Jannusch
|
|
|
Work complete. Soil stable. Okay to final.
|
General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 | | PASS |
Melissa Jannusch
|
|
|
Soil is stabilized around building. Okay to final once BLD has final.
|
General Inspection | 2/24/2017 | 2/24/2017 | 2/24/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 2/9/2017 | 2/9/2017 | 2/9/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/25/2017 | 1/25/2017 | 1/25/2017 | | PASS |
Melissa Jannusch
|
|
|
Vegetaion mature landscping is finished. No lose trash at site. No trackout. WIP on roof and interior.
|
General Inspection | 1/10/2017 | 1/10/2017 | 1/11/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/26/2016 | 12/26/2016 | 12/29/2016 | | PASS |
Andy J. Long
|
|
|
No trackout, discharges or muddy areas/snowmelt issues. WIP on interior
|
General Inspection | 12/9/2016 | 12/9/2016 | 12/9/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/24/2016 | 11/24/2016 | 11/25/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/9/2016 | 11/9/2016 | 11/9/2016 | | PASS |
Phil Shearer
|
|
|
Trash and materials contained on site. Approved.
|
General Inspection | 10/25/2016 | 10/25/2016 | 10/27/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Parking lot now paved and staging area cleaned. No loose dirt, discharges, uncontained trash. Approved.
|
General Inspection | 10/10/2016 | 10/10/2016 | 10/10/2016 | | PASS |
Andy J. Long
|
|
|
WIP. No discharges or trackout from work area. Trash and materials contained on site. Approved.
|
General Inspection | 9/21/2016 | 9/23/2016 | 9/23/2016 | A | PART |
Andy J. Long
|
|
|
correction request follow up
The gutter between site entrance and Eckert was swept as requested and the DI bag in alley cleaned out.
The east side of site and entrance to Sawmill was not swept. Called RP Kevin. He said he will make sure it is cleaned and stated that maintenance man didnt do it due to vehicle parking in the way...
Will follow up next week
|
General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 | | PART |
Andy J. Long
|
|
|
No trackout or discharges, materials on site are mostly contained.
Corrections needed before end of day Friday. - sweep up all perimeter gutters and alley way - change out /conduct maintenance on sediment filter bags that were installed. - clean up concrete dust near garage unit structures
|
General Inspection | 9/6/2016 | 9/6/2016 | 9/6/2016 | | PART |
Andy J. Long
|
|
|
WIP on exterior finishes. Stone work occuring. No trackout or discharges observed.
Correction request: clean up the uncontained wash-out material on the northeast corner of the site. Provide designated washout container or lined pit for further use.
|
General Inspection | 8/22/2016 | 8/22/2016 | 8/22/2016 | | PASS |
Andy J. Long
|
|
|
WIP on exterior building finishes. Site surrounded by curbing and pavement that is above grade. DIs in alley south of project have sediment filters installed. No trackout, dust, or uncontained trash issues observed.
Approved.
|
General Inspection | 8/5/2016 | 8/5/2016 | 8/5/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/21/2016 | 7/21/2016 | 7/22/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction ongoing. Site surrounded by chain link fencing and no trackout or sediment running off site. No corrections issued.
|
General Inspection | 7/6/2016 | 7/6/2016 | 7/6/2016 | | PASS |
Andy J. Long
|
|
|
Vertical consruction in progress. Seperate garage structures have been built. No trackout, dust, or non-stormwater discharges observed. No corrections requested.
|
General Inspection | 6/21/2016 | 6/21/2016 | 6/21/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. Minimal trackout and sediment around site perimeter. Site is fenced in. No discharges or fugitive dust. No corrections at that this time.
|
Random Inspection | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Andy J. Long
|
|
|
Vertical construciton in progress. No trackout or disharges from site. Perimeter free of loose dirt from site.
|
General Inspection | 5/23/2016 | 5/23/2016 | 5/23/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | | PASS |
Andy J. Long
|
|
|
Construction has resumed at the site over the last few weeks after being inactive for many months. Site is very clean, no uncontained trash or materials. No trackout, no loose sediment or disturbed area at the perimeter.
Working on frame. No corrections needed.
|
General Inspection | 4/6/2016 | 4/6/2016 | 4/6/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/22/2016 | 3/22/2016 | 3/22/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 | | PASS |
Andy J. Long
|
|
|
No activity at site. No violations, clean site with fenced perimeter and sediment controls.
|
General Inspection | 2/19/2016 | 2/19/2016 | 2/19/2016 | | PART |
Bill VanDegrift
|
|
|
still no activity
|
General Inspection | 2/4/2016 | 2/4/2016 | 2/4/2016 | | PASS |
Andy J. Long
|
|
|
No activity. Site is fenced in and clean. No sediment, discharges, or other materials leaving site.
|
General Inspection | 1/20/2016 | 1/20/2016 | 1/20/2016 | | PASS |
Andy J. Long
|
|
|
No activity. No violations. Access is controlled by chainlink fencing and stormwater contained on site.
|
General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 | | PASS |
Andy J. Long
|
|
|
No activity at site. No runoff issues or trackout. Clean site with BMPs implemented.
|
General Inspection | 12/21/2015 | 12/21/2015 | 12/21/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/4/2015 | 12/4/2015 | 12/4/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues observed at this time
|
General Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 | | PASS |
Andy J. Long
|
|
|
WIP on Harris Ranch commercial multi-use building. Limited activity, site is very well kept and surrounded by curbing and security fence. No trackout, road mix base has been laid down so no muddy areas or trackout.
No corrections.
|
General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Structural perimeter and curbing containing sediment on site. No trackout or other issues. Approved.
|
General Inspection | 10/20/2015 | 10/20/2015 | 10/20/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/5/2015 | 10/5/2015 | 10/5/2015 | | PASS |
Andy J. Long
|
|
|
WIP on foundation and site work. Excavation complete and distrubed area contained by existing curbing & paving, as well as perimeter wattles. No trackout, no discharges, and trash & materials contained. No corrections issued.
|
General Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 | | PASS |
Andy J. Long
|
|
|
WIP on foundation. Site utilities and grading complete. Perimeter wattles and structural foundations make sediment barrier. No activity this week.
|
General Inspection | 9/3/2015 | 9/3/2015 | 9/3/2015 | | PART |
Andy J. Long
|
|
|
WIP on foundation. No trackout or discharges. Lined concrete washout box was used for recent concrete work. Trash is contained and seperated.
1 correction: Install sedimet control BMP/inlet protection on the circular storm drain on the southeast corner of parcel.
- verbal correction issued to RP
|
General Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 | | PASS |
Andy J. Long
|
|
|
No changes since previous inspection. No violations.
|
General Inspection | 8/4/2015 | 8/4/2015 | 8/4/2015 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. No trackout, dust, or discharges originating from site. Work for some retaining walls and preliminary foundation work has already started. No corrections issued.
|
General Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues observed at time of inspection
|
General Inspection | 7/3/2015 | 7/3/2015 | 7/6/2015 | | PASS |
Andy J. Long
|
|
|
No activity, no violations. Building pad is ready for vertical construction. No corrections issued.
|
General Inspection | 6/18/2015 | 6/18/2015 | 6/18/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/3/2015 | 6/3/2015 | 6/3/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/19/2015 | 5/19/2015 | 5/19/2015 | | PASS |
Andy J. Long
|
|
|
No activity or changes at site since prior inspection. No corrections needed, site is ready for vertical construction.
|
General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 | | PASS |
Andy J. Long
|
|
|
No activity or changes at site since last inspection. Site BMPs keeping sediment on site. No trackout or issues. Minor site work indicates construction will begin soon.
|
General Inspection | 4/16/2015 | 4/16/2015 | 4/16/2015 | | PASS |
Andy J. Long
|
|
|
No activity at site for new 3 story mixed use building. Permit recently issued 4/7 so work should begin soon. Site is ready for construction with perimeter BMPs and inlet protection installed. Will need to provide lined concrete washout pit or above ground container for cement & foundation work.
Permit grading & utilities was finaled (see ESC14-00818). BMPs shall remain on site for the vertical phase.
|