Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberESC15-01420
StatusFinaled
Name JIM CONGER
Site Address 7651 W HILL RD
Project NameNORTHWEST HILL SUBDIVISION
Customer Number 
ePlanReviewNo
Description
(NORTHWEST HILL SUBDIVISION)To conduct excavation of approximately 2,460 cubic yards of earth to prepare for a new residential subdivision (future single family dwellings). Plans approved by Jason Taylor, Public Works Department on with required conditions attached to plans and this case. No structure or building construction allowed under this permit. ESC15-01420 is to be issued with this permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/23/20187/23/20187/23/2018 PASS
DetailsAndy J. Long
All lots except one are occupied/stabilized with completed SFHs. No temporary BMPs remaining, all disturbed areas stabilized. Common areas vegetated. ESC permit conditions for subdivision construction are satisfied, ESC permit finaled.
DOC - Permit Finaled7/23/20187/23/20187/23/2018PPASS
DetailsAndy J. Long
General Inspection7/6/20187/6/20187/6/2018 CANC
DetailsAndy J. Long
General Inspection6/21/20186/21/20186/21/2018 CANC
DetailsAndy J. Long
General Inspection6/6/20186/6/20186/6/2018 CANC
DetailsAndy J. Long
General Inspection5/18/20185/22/20185/22/2018PPASS
DetailsMichael Zawacki
WIP on one home. No ground disturbances at site.
General Inspection5/18/20185/18/20185/18/2018 CANC
DetailsAndy J. Long
Site Final5/3/20185/3/20185/3/2018PNR
DetailsMichael Zawacki
One home still under construction and one lot still vacant and not stabalized.
General Inspection4/23/20184/23/20184/23/2018 PASS
DetailsMichael Zawacki
One home under construction, nearly complete, one vacant lot remaining. Site is clean and free of ESC issues.
General Inspection4/6/20184/6/20184/6/2018 PASS
DetailsMichael Zawacki
WIP on last few homes. Neighborhood and homesites are clean.
General Inspection3/22/20183/22/20183/22/2018 PASS
DetailsMichael Zawacki
1 home under construction, 1 lot still vacant. No ESC issues.
General Inspection3/7/20183/7/20183/7/2018 CANC
DetailsAndy J. Long
General Inspection2/20/20182/20/20182/20/2018 CANC
DetailsAndy J. Long
General Inspection2/5/20182/5/20182/5/2018 PASS
DetailsMichael Zawacki
3 lots still under construction. All areas contained, no trash or trackout.
General Inspection1/19/20181/19/20181/19/2018 PASS
DetailsMichael Zawacki
WIP on 2 homes one vacant lot. No runoff or trackout during rain event. Site is clean, most homes are lived in.
General Inspection1/4/20181/4/20181/4/2018 PASS
DetailsMichael Zawacki
Construction on a few SFH remains. Washout has been dumped on lots. Some dirt on sidewalk and road in front of current builds.
General Inspection12/20/201712/20/201712/20/2017 PASS
DetailsMichael Zawacki
Most homes complete. No trackout or run off issues.
General Inspection12/5/201712/5/201712/5/2017 PASS
DetailsMichael Zawacki
Few lots vacant, 2 homes under construction. All dirt contained.
General Inspection11/20/201711/20/201711/21/2017 PASS
DetailsMichael Zawacki
Some homes complete and have residents, others still being worked on. Foundation is being poured, concrete contractor says they hall away washout since no washout area on site. Neighborhood free from loose dirt and trackout.
General Inspection11/3/201711/3/201711/3/2017 CANC
DetailsAndy J. Long
General Inspection10/19/201710/19/201710/19/2017 PASS
DetailsMichael Zawacki
WIP on single family homes. Lots not being used are stabalized and self contained. Currently doing foundation on one lot. Some loose dirt but they are currently running excavator.
General Inspection10/4/201710/4/201710/4/2017 CANC
DetailsAndy J. Long
General Inspection9/19/20179/19/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection9/4/20179/4/20179/5/2017 CANC
DetailsAndy J. Long
General Inspection8/18/20178/18/20178/18/2017 CANC
DetailsAndy J. Long
General Inspection8/3/20178/3/20178/3/2017 CANC
DetailsAndy J. Long
General Inspection7/19/20177/19/20177/19/2017 PASS
DetailsAndy J. Long
WIP on SFHs. Most lots now occupied.

No sediment runoff, but still need to stabilize the common area at west end of sub above the undergound stormwater pipe. Currently be used for dumping and stockpiling. Will continue to monitor and ESC permit shall remain open until addressed.
General Inspection7/4/20177/4/20177/5/2017 CANC
DetailsAndy J. Long
General Inspection6/19/20176/19/20176/19/2017 CANC
DetailsMelissa Jannusch
General Inspection6/2/20176/2/20176/2/2017 PASS
DetailsMelissa Jannusch
WIP on SFHs. Some stucco slurry on the ground. Trash is contained. No trackout. Some runoff from the natural area to the North but not due to the construction activities.
General Inspection5/18/20175/18/20175/18/2017APASS
DetailsAndy J. Long
WIP on SFHs. Storm drain on HIll has sediment protection installed. No trackout or discharges.

The small culvert under the fence has been cleaned out at the southwest corner of sub. Open area still not vegetated. Some straw and seed has been mulched on the slope. Will continue to monitor - call Kent with Riverside for corrections.
General Inspection5/8/20175/8/20175/9/2017 CANC
DetailsAndy J. Long
General Inspection4/21/20174/21/20174/21/2017PPASS
DetailsMelissa Jannusch
WIP no landscaping minimal trackout and trash
General Inspection4/17/20174/17/20174/17/2017 CANC
DetailsAndy J. Long
General Inspection3/31/20173/31/20173/31/2017PPASS
DetailsAndy J. Long
New filter mat has been installed at MS4 on west end of North Hill sub. Trash and materials are contained around sites. No trackout or discharges. Approved.

Note:
- area on west side drainage to be landscaped for upcoming Parade of Homes.
General Inspection3/24/20173/24/20173/24/2017 PEND
DetailsAndy J. Long
correction issued for street sweeping and to replace sediment protection on storm drain at west end of the new houses
General Inspection2/14/20172/28/20172/28/2017ACANC
DetailsAndy J. Long
rescheduled.
General Inspection2/14/20172/14/20172/14/2017 CANC
DetailsMelissa Jannusch
Rescheduled for 2/28
General Inspection1/30/20171/30/20172/3/2017 CANC
DetailsAndy J. Long
General Inspection1/13/20171/13/20171/17/2017 CANC
DetailsAndy J. Long
General Inspection12/29/201612/29/201612/29/2016 CANC
DetailsAndy J. Long
General Inspection12/14/201612/14/201612/15/2016 PEND
DetailsAndy J. Long
Still waiting for weather window to install ESC BMPs on the west side surface swale and clean mud out of pipe.

Developers have scheduled Syman to do assessment and work but ground is snow covered and too muddy for work to occur
General Inspection11/29/201611/29/201611/30/2016PPEND
DetailsAndy J. Long
Subdivision work complete. Investigation of drainage issue on west end of project in progress. ACHD has storm drain ROW there.

Correction to development. Install sediment protection in front of inlet to surface drainage pipe. Install wattles at toe of slope on property line.
Conference11/15/201611/15/201611/16/2016PPEND
DetailsAndy J. Long
follow up

Notified RP of issue with drainage pipe and erosion fill pipe with mud....awaiting schedule. Notified concerned party that the issue is in process of being resolved.
Complaint Inspection11/10/201611/14/201611/14/2016AFAIL
DetailsAndy J. Long
Bruce - ###-####; ###-####

drainage question to the west pf site

Drainage Pipe connecting west side of development drainage area to the grassy swale along Hill Road Parkway is half full of mud.

Request issued to clean out culvert and take corrective actions to stabilize the area that lost sediment into the pipe.

Notified developer of issue. Awaiting corrective action plan.
General Inspection11/2/201611/2/201611/2/2016 CANC
DetailsAndy J. Long
General Inspection10/18/201610/18/201610/18/2016 CANC
DetailsAndy J. Long
General Inspection10/3/201610/3/201610/3/2016 PASS
DetailsAndy J. Long
General Inspection9/16/20169/16/20169/16/2016 PASS
DetailsAndy J. Long
Subdivison work complete and first SFH is in progress. NOI and ESC permit sign posted. Site is clean, vegetated buffer between lots Hill Road. Active site has trash container. Temporary water system installed to we stockpile berm on site. No corrections requested at this time.
General Inspection9/1/20169/1/20169/1/2016 PASS
DetailsEvan Jenkins
work is in progress. BMP's in place as well as permit posted. No ESC issues observed at this time
General Inspection8/17/20168/17/20168/17/2016 PASS
DetailsEvan Jenkins
no issues observed
General Inspection7/28/20167/28/20167/28/2016 PASS
DetailsEvan Jenkins
work in progress. no dust issues or any other discharges leaving the site
General Inspection7/13/20167/13/20167/13/2016 PASS
DetailsEvan Jenkins
Fence has been installed: no construction occuring at this time. site has been graded.
General Inspection6/24/20166/24/20166/24/2016PPASS
DetailsEvan Jenkins
General Inspection5/17/20165/17/20165/17/2016PPASS
DetailsAndy J. Long
Utilities and roadork in new subdivison development is complete. No SFH activity occuring yet. Vegetated swale installed south of sub has been hydroseeded and is being irrigated. No ESC violations at site.
General Inspection4/14/20164/14/20164/14/2016APASS
DetailsEvan Jenkins
General Inspection2/28/20173/9/2017 P 
DetailsAndy J. Long