Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberESC16-00948
StatusFinaled
Name CHRIS HAWKINS
Site Address 3018 N 28TH ST
Project NameChesler Park Subdivision
Customer Number 
ePlanReviewNo
Description
Re-subdivision of Lot 3 of FB Senior Estate Sub. Will include 4 buidable lots on .91 acres.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/4/20186/4/20186/4/2018 PASS
DetailsAndy J. Long
All lots in Cheslet Park sub are occupied except for on SFH in framing phase and one open lot. DI bags to stay installed. No further ESC inspections on this permit. Individual homes are permitted seperately.
DOC - Permit Finaled6/4/20186/4/20186/4/2018PPASS
DetailsAndy J. Long
General Inspection5/16/20185/18/20185/21/2018APASS
DetailsAndy J. Long
General Inspection5/15/20185/15/20185/16/2018 CANC
DetailsAndy J. Long
General Inspection4/30/20184/30/20184/30/2018 PASS
DetailsAndy J. Long
No discharges or trackout from site. One open lot left. One active site. DI bags still installed.
General Inspection4/13/20184/13/20184/13/2018 FAIL
DetailsMichael Zawacki
REmaining empty lot has no controls. Dirt is running off and into road. Area needs perimeter controls or to be stabalized if not being built.
General Inspection3/29/20183/29/20183/29/2018 FAIL
DetailsMichael Zawacki
No protection on bare lot. Dirt has ran down, caused rilling, and ended up on drive.
General Inspection3/14/20183/14/20183/14/2018 PASS
DetailsMichael Zawacki
Still one vacant lot.
General Inspection2/27/20182/27/20182/27/2018 PASS
DetailsMichael Zawacki
One vacant lot with a coming soon sign on it. Site is currently clean. No BMPs installed since all homes currently done. Next lot will need to install everything new.
General Inspection2/12/20182/12/20182/15/2018 PASS
DetailsMichael Zawacki
One vacant lot remaining.
General Inspection1/26/20181/26/20181/26/2018 PASS
DetailsMichael Zawacki
Some dirtwork has started on final lot. No permit sign posted. No trackout leaving site.
General Inspection1/11/20181/11/20181/11/2018 PASS
DetailsMichael Zawacki
One vacant lot remaining. Some dirt on road, must of been tracked in since it is in area without disturbance.
General Inspection12/27/201712/27/201712/27/2017 PASS
DetailsMichael Zawacki
One vacant lot remaining. No new work.
General Inspection12/12/201712/12/201712/12/2017 FAIL
DetailsMichael Zawacki
Trackout all over road from landscapers and vacant lot on north. Drain inlet is unprotected.
General Inspection11/27/201711/27/201711/27/2017 PASS
DetailsMichael Zawacki
3 of 4 homes complete. No violations observed.
General Inspection11/10/201711/10/201711/13/2017 CANC
DetailsAndy J. Long
General Inspection10/24/201710/26/201710/27/2017APEND
DetailsAndy J. Long
follow up inspection; restrict site access. Check BMPs and permits for each home.

clean up needed:
- excess backfill, loose dirt on sidewalk gutter, illicit concrete washout and dumping.

Corrections issued to homes
Complaint Inspection10/19/201710/20/201710/24/2017APEND
DetailsAndy J. Long
please call Terrel Munden ###-#### for description of complaint (sediment pushed outside of property lines and ran over PI lines in Odum Estates, adjacent subdivision)

Spoke with Terrel. He will work with contractors building homes next to his damaged property.
General Inspection10/18/201710/18/201710/18/2017PPASS
DetailsMichael Zawacki
Most ground disturbance done. Some landscaping work in progress. Everything contained to site.
General Inspection10/5/201710/5/201710/5/2017 CANC
DetailsAndy J. Long
General Inspection9/20/20179/20/20179/22/2017 PASS
DetailsAndy J. Long
BMPs (inlet protection installed). No trackout or discharges from subdivision. Multiple SFHs now in progress.
General Inspection9/5/20179/5/20179/8/2017 CANC
DetailsAndy J. Long
General Inspection8/21/20178/21/20178/23/2017 CANC
DetailsAndy J. Long
General Inspection8/4/20178/4/20178/4/2017 PASS
DetailsAndy J. Long
Overfull concrete washout was cleaned up. No new washout provided, but no new foundation excavation occuring currently. Will request new SFHs to provide individual washout facilities.

DIs have sediment filter bags installed. No trackout to 28th, no discharges/spills. Approved.
General Inspection7/20/20177/20/20177/20/2017 CANC
DetailsMelissa Jannusch
General Inspection7/3/20177/5/20177/5/2017PPEND
DetailsAndy J. Long
Need new concrete washout for Chesler Park...working on contact with developer.
General Inspection7/3/20177/3/20177/3/2017 CANC
DetailsAndy J. Long
rescheduled 7/5
General Inspection6/14/20176/16/20176/16/2017APART
DetailsMelissa Jannusch
Some trackout on interior roads. DI bags okay. No concrete slurry visable on the ground or areas that can runoff the site.
General Inspection5/31/20175/31/20175/31/2017 PASS
DetailsMelissa Jannusch
WIP on SFHs. Road is complete. Trackout is controlled. No other ESC violations.
General Inspection5/16/20175/16/20175/16/2017 PASS
DetailsMelissa Jannusch
WIP on SFH. DIs are protected. Trackout contained.
Random Inspection4/28/20174/28/20174/28/2017PCANC
DetailsAndy J. Long
Complaint Inspection4/18/20174/18/20174/18/2017PPART
DetailsAndy J. Long
Sweep up trackout from demolition activity that was left on Neff Street sidewalks.

Post Chesler Park SWPPP /City of Boise ESC sign.

General Inspection4/4/20174/4/20174/7/2017PPART
DetailsAndy J. Long
No trackout. Neff Street will need sweeping next week. Currently demolishing small house under seperate permit. East end of Neff is soon to be paid. Will check in next week.
General Inspection3/15/20173/28/20173/28/2017PPASS
DetailsMelissa Jannusch
WIP on foundations. Some trackout on interior roads. DI protection ok. No correction requested.
General Inspection3/15/20173/15/20173/15/2017APASS
DetailsAndy J. Long
Subdivision development complete, parcels ready for SFH construction. Site preparations conducted for Edgemoor Lane for Legacy Development. Neff Street homes to be later this year. WIP on Odom Estates to east of development. Newly installed storm drains and MS4 on 28th have sediment protection. No corrections requested.
General Inspection3/7/20173/7/20173/7/2017 PASS
DetailsMelissa Jannusch
No ESC violations observed. DIs okay.
General Inspection11/16/201611/21/201611/25/2016PPASS
DetailsBen Livingston
no trackout
General Inspection11/15/201611/15/201611/16/2016PCANC
DetailsAndy J. Long
rescheduled
General Inspection10/11/201610/11/201610/11/2016PPASS
DetailsAndy J. Long
WIP preparing subgrade for road installation. No trackout, fugitive dust or discharges observed. Permit sign is posted.
General Inspection9/20/20169/21/20169/21/2016APART
DetailsAndy J. Long
Permit sign is posted. No significant trackout, dust, or discharges. Sediment filter bag installed on storm drain on 28th

Corrections needed:

- sweep up gutter at both entrances
- sweep sidewalks
- designated a construction entrance
Site Preparation9/19/20169/20/20169/20/2016PPART
DetailsAndy J. Long
Site started without picking up GRD or ESC permit. Requested they pick up and pay for permit yesterday 9/19, which was completed.

No trackout, discharges or dust violations. RP unable to be reached for site walk through and review of ESC plan. Inspection re-scheduled for tomorrow.
General Inspection9/19/20169/20/20169/19/2016PCANC
DetailsAndy J. Long
data entry error
General Inspection4/18/20174/21/2017 P 
DetailsAndy J. Long
Chesler Park follow up