Permit Information
Permit NumberESC16-00938
StatusFinaled
Name AVERY A EISENMAN
Site Address 2725 E TABLE ROCK RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Residential tennant improvement within foothills zone. Project includes terraced retaining walls. ESC BMPs include leaving equipment within site area during project to limit tracking, preservation of exisiting hillside vegetation below work area, sediment control wattles installed along botton road cut from Strata Via, and storm drain inlet filter. ESC plan calls for restoration of disturbed areas with approved native seed mix. (Note: work started prior to permit review and issuance; no work to occur until after permits approved and site preparation inspection is completed - call 384-3802)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/10/20195/14/20195/16/2019PPASS
DetailsMichael Zawacki
No more rill from lot, good growth.
General Inspection5/10/20195/10/20195/10/2019 CANC
DetailsAndy J. Long
General Inspection4/25/20194/25/20194/25/2019 CANC
DetailsAndy J. Long
General Inspection4/10/20194/10/20194/11/2019 CANC
DetailsMichael Zawacki
General Inspection3/26/20193/26/20193/26/2019 PASS
DetailsMichael Zawacki
No runoff from hillside.
General Inspection3/11/20193/11/20193/12/2019 PASS
DetailsMichael Zawacki
BMPs in place, no runoff or rilling on hill.
General Inspection2/22/20192/22/20192/26/2019 PASS
DetailsMichael Zawacki
General Inspection2/7/20192/7/20192/8/2019 PASS
DetailsMichael Zawacki
No new rills or runoff coming down hill. Gator guard still installed at base of hill.
General Inspection1/23/20191/23/20191/23/2019 CANC
DetailsAndy J. Long
General Inspection1/8/20191/8/20191/8/2019 CANC
DetailsAndy J. Long
General Inspection12/24/201812/24/201812/24/2018 PEND
DetailsAndy J. Long
No activity. revegetation/stabilization of access to backyard from strata via
General Inspection12/7/201812/7/201812/7/2018 CANC
DetailsAndy J. Long
General Inspection11/22/201811/22/201811/23/2018 CANC
DetailsAndy J. Long
General Inspection11/7/201811/7/201811/7/2018 CANC
DetailsAndy J. Long
General Inspection10/23/201810/23/201810/23/2018 PASS
DetailsMichael Zawacki
Wattle still in place, hillside has been hydroseeded/tackified.
Random Inspection10/8/201810/8/201810/8/2018PPASS
DetailsAndy J. Long
No sediment runoff on sidewalk. Wattles installed at bottom of slope that was disturbed. No corrections.
General Inspection9/25/20189/25/20189/25/2018 PASS
DetailsMichael Zawacki
No runoff from hillside. Gator guards are still at bottom of hill above sidewalk.
General Inspection9/10/20189/10/20189/10/2018 PASS
DetailsMichael Zawacki
Wattle at bottom of hill. Rills have been repaired, no current issues.
General Inspection8/24/20188/24/20188/24/2018 CANC
DetailsAndy J. Long
General Inspection8/9/20188/9/20188/9/2018 PASS
DetailsMichael Zawacki
Gator guard along bottom of hill. No new runoff or erosion.
General Inspection7/25/20187/25/20187/25/2018 CANC
DetailsAndy J. Long
General Inspection7/10/20187/10/20187/10/2018 PASS
DetailsMichael Zawacki
Sidewalk has been cleaned and rill filled in.
General Inspection6/22/20186/25/20186/27/2018PCANC
DetailsAndy J. Long
General Inspection6/22/20186/22/20186/22/2018 CANC
DetailsAndy J. Long
rescheduled. ACHD inspector contacted homeowner about the erosion occuring.
Aging Inspection6/7/20186/7/20186/7/2018 FAIL
DetailsMichael Zawacki
Runoff onto sidewalk.
General Inspection10/26/201710/26/201710/26/2017 CANC
DetailsMichael Zawacki
DOC - Permit Finaled10/26/201710/26/201710/26/2017PPASS
DetailsMichael Zawacki
General Inspection10/11/201710/11/201710/12/2017APASS
DetailsMichael Zawacki
Revegetation ongoing. Wattle still installed at entrance. Work complete.
General Inspection9/28/20179/28/201710/2/2017 CANC
DetailsAndy J. Long
General Inspection9/13/20179/13/20179/19/2017 PEND
DetailsAndy J. Long
still revegetating and temporary sediment control wattle installed at bottom of disturbed slope. Construction is complete.
General Inspection8/29/20178/29/20178/30/2017 CANC
DetailsAndy J. Long
General Inspection8/14/20178/14/20178/14/2017 CANC
DetailsAndy J. Long
General Inspection7/28/20177/28/20177/28/2017 CANC
DetailsAndy J. Long
General Inspection7/13/20177/13/20177/13/2017PPASS
DetailsAndy J. Long
revegetation and stabilization near complete. Temporary wattle still installed.
General Inspection7/11/20177/11/20177/11/2017 CANC
DetailsAndy J. Long
General Inspection6/26/20176/26/20176/27/2017 CANC
DetailsMelissa Jannusch
General Inspection6/9/20176/9/20176/9/2017 CANC
DetailsMelissa Jannusch
General Inspection5/25/20175/25/20175/26/2017 PEND
DetailsAndy J. Long
WIP installing fence. Access is from front of yard, not using the temporary road from Strata Via. This road is revegetating, will need a further application of seeds, native plants to get 80% vegetative cover. Perimter wattle installed. No corrections at this time.
General Inspection5/10/20175/10/20175/10/2017 PEND
DetailsAndy J. Long
revegetation phase; construction complete
General Inspection4/21/20174/21/20174/21/2017 PASS
DetailsMelissa Jannusch
WIP. wattles on backside of lot. No trackout or runoff revegetation has not fully stabilized slope yet.
General Inspection4/6/20174/6/20174/6/2017 PASS
DetailsMelissa Jannusch
Perimeter controls ok. No trackout or runoff. Revegetation phase.
General Inspection3/17/20173/17/20173/17/2017 PEND
DetailsAndy J. Long
revegetation in progress
General Inspection3/2/20173/2/20173/2/2017 PEND
DetailsAndy J. Long
revegetation of access road to backyard not yet complete...
General Inspection2/15/20172/15/20172/15/2017 PASS
DetailsMelissa Jannusch
Stabilization has not been reached. No corrections.
General Inspection11/25/201611/30/201612/2/2016PPASS
DetailsAndy J. Long
Project in final stages. Rock retaining walls and terraces installed. Access road from Strata Via and disturbed hillside areas have now been hydroseeded. No corrections, permit open to observe revegetation progress.
General Inspection11/25/201611/25/201611/25/2016PPEND
DetailsAndy J. Long
Landscaping and retaining wall project near completion. No sediment runoff or erosion issues observed. Need to address stabilization and erosion prevention on the access road to backyard from Strata Via. No actiivity or personnel on site, will follow up next week.
General Inspection10/27/201610/27/201610/27/2016PPASS
DetailsAndy J. Long
WIP on large landscaping project at hillside home. No trackout from access road to Strata Via. No materials or staging on Table Rock. Sediment controls wattles installed at bottom of slope to prevent runoff to Strata Via, MS4 has inlet protection. No corrections requested.
Site Preparation8/24/20168/25/20168/25/2016APASS
DetailsAndy J. Long
Craig Phone #: ###-####

Project approved to re-commence. Access road below site has sediment control wattles installed. Staging area on Strata Via is very clean. Yellow ESC permit sign with contact info posted on Tablerock.