General Inspection | 7/5/2018 | 7/5/2018 | 7/6/2018 | | PASS |
Andy J. Long
|
|
|
Subdivsion work complete. No ESC correctiions. WIP on finishing Idaho Street Townhomes 1603- 1627 W. Idaho Street.
See ESC17-01457 to -01464 for ESC coverage on individual units.
|
DOC - Permit Finaled | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2018 | 6/20/2018 | 6/20/2018 | | PASS |
Michael Zawacki
|
|
|
Everything contained in fenced off area. No dirt or garbage leaving site.
|
General Inspection | 6/5/2018 | 6/5/2018 | 6/5/2018 | | PASS |
Michael Zawacki
|
|
|
Site contained. All prep and storage is on units driveway area.
|
General Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 | | PASS |
Michael Zawacki
|
|
|
All work contained. Working on prep to fram garages.
|
General Inspection | 5/4/2018 | 5/4/2018 | 5/4/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Cinder block wall now seperates site from 17th. All material stored on back of lot with acces from alley. No ESC issues.
|
General Inspection | 4/19/2018 | 4/19/2018 | 4/20/2018 | | PASS |
Michael Zawacki
|
|
|
WIP, no ESC issues.
|
General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 | | PASS |
Michael Zawacki
|
|
|
Site perimeter has expanded and sidewalk on 16th is now blocked. No esc issues, site is contained and maintained.
|
General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 | | PASS |
Andy J. Long
|
|
|
WIP on east townhomes. No trackout, no discharges. Trash contained, clean site.
|
General Inspection | 3/5/2018 | 3/5/2018 | 3/5/2018 | | PASS |
Michael Zawacki
|
|
|
Framing on phase 2, interior work also in progress. Site is clean, no issues.
|
General Inspection | 2/16/2018 | 2/16/2018 | 2/20/2018 | | PASS |
Michael Zawacki
|
|
|
Phase 2 under construction. Washout on site, trash box provided. Site is clean and maintained. No dirt leaving site.
|
General Inspection | 2/1/2018 | 2/1/2018 | 2/1/2018 | | PASS |
Andy J. Long
|
|
|
WIP on east units of the Idaho Street townhomes. Permit signs posted, foundations poured used concrete washout pit, no trackout, spills or discharges. Trash container on site, no litter around site. Approved.
|
General Inspection | 1/17/2018 | 1/17/2018 | 1/17/2018 | | PASS |
Michael Zawacki
|
|
|
WEIP on second phase. Wattle is starting to degrade. No runoff from site.
|
General Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | | PASS |
Andy J. Long
|
|
|
Foundations for new Idaho St. townhomes have been poured on east end of block. No activity currently. No ESC or housekeeping issues observed.
|
General Inspection | 12/18/2017 | 12/18/2017 | 12/18/2017 | | PASS |
Andy J. Long
|
|
|
WIP on east sction of Idaho Street townhomes. No trackout or discharges. Trash contained, concrete washout pit on site. Approved.
|
General Inspection | 12/1/2017 | 12/1/2017 | 12/1/2017 | | PASS |
Michael Zawacki
|
|
|
New foundations poured. Some material stored on site. No loose trah or dirt. No runoff leaving site.
|
General Inspection | 11/16/2017 | 11/16/2017 | 11/16/2017 | | PASS |
Andy J. Long
|
|
|
Idaho Street townhome project is back in progress. 6 townhomes on east side of block now have active permits. Foundations have been poured, concrete wahout pit has been utilized. Permit signs posted around perimeter. No trackout or discharges.
|
General Inspection | 11/1/2017 | 11/1/2017 | 11/1/2017 | | PASS |
Michael Zawacki
|
|
|
Phase 1 complete. No new activity.
|
General Inspection | 10/17/2017 | 10/17/2017 | 10/18/2017 | | CANC |
Andy J. Long
|
|
|
no activity
|
General Inspection | 10/2/2017 | 10/2/2017 | 10/2/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/15/2017 | 9/15/2017 | 9/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/31/2017 | 8/31/2017 | 8/31/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/16/2017 | 8/16/2017 | 8/16/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/1/2017 | 8/1/2017 | 8/1/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/17/2017 | 7/17/2017 | 7/17/2017 | | PASS |
Andy J. Long
|
|
|
No activity. Completed units for sale and are landscaped.
|
General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 | | PASS |
Melissa Jannusch
|
|
|
First section of townhomes is complete. The rest of the parcel is still vacant and not stabilized.
|
General Inspection | 6/15/2017 | 6/15/2017 | 6/16/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/31/2017 | 5/31/2017 | 5/31/2017 | | PASS |
Melissa Jannusch
|
|
|
Almost complete. Trash and outhouse need to be removed before ESC site final.
|
General Inspection | 5/16/2017 | 5/16/2017 | 5/17/2017 | | PASS |
Andy J. Long
|
|
|
No new activity. East parcel of the townhome block are prepared for construction. No discharges, trackout, or other issues.
|
General Inspection | 5/1/2017 | 5/1/2017 | 5/1/2017 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. No discharges, uncontained trash or other issues. Site is clean and new townhomes have been landscaped.
|
General Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 3/15/2017 | 3/15/2017 | 3/15/2017 | | PASS |
Andy J. Long
|
|
|
WIP on Idaho Street townhomes. Construction access through paved alley. Idaho Street sidewalk and landscaping installed. No trackout or discharges. Site perimeter is clean.
|
General Inspection | 2/28/2017 | 2/28/2017 | 2/28/2017 | | PASS |
Andy J. Long
|
|
|
WIP on town homes and garage units by alley behind the Cabana. No muddy trackout, uncontained trash or discharges observed. No corrections requested.
|
General Inspection | 2/13/2017 | 2/13/2017 | 2/13/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 1/27/2017 | 1/27/2017 | 1/30/2017 | | PASS |
Melissa Jannusch
|
|
|
Vertical WIP. Sign posted. No track out. Waste containment beginning to overflow. Check that the container has been emptied during the next inspection. Some scattered building materials, but all contained onsite. Some areas still snow covered.
|
General Inspection | 12/28/2016 | 12/28/2016 | 12/29/2016 | | PASS |
Andy J. Long
|
|
|
No trackout, discharges or muddy access areas. BMPs installed, permits posted in alley
|
General Inspection | 12/13/2016 | 12/13/2016 | 12/15/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/28/2016 | 11/28/2016 | 11/28/2016 | | PASS |
Andy J. Long
|
|
|
WIP on phase 1 of Idaho Street townhomes. Surrounding DIs have inlet protection. Perimeter wattles and lined concrete washout onsite. No trackout or discharges. Site is in compliance. Permits posted.
|
General Inspection | 11/11/2016 | 11/11/2016 | 11/14/2016 | | PASS |
Andy J. Long
|
|
|
|
Conference | 10/27/2016 | 10/27/2016 | 10/27/2016 | P | PASS |
Andy J. Long
|
|
|
4 of 9 new Idaho Street Townhomes are to start. Onsite meeting for 9 new ESC permits for each parcel.
Wattles installed at east end of project. DI bag to be reinstall on Main Street at 17th. Concrete washout containment provided. See also site preps for ESC16-01317 to ESC16-01325
|
General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 | | PASS |
Andy J. Long
|
|
|
No activity at Idaho Street townhomes. Permits for SFHs/townhomes have been submitted to City for review. No corrections requested at this time.
|
General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/29/2016 | 8/29/2016 | 8/29/2016 | | PASS |
Evan Jenkins
|
|
|
Backhoe onsite not. It appears grading will occur soon. At time of inspection, no work has occured yet
|
General Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 | | PASS |
Andy J. Long
|
|
|
No activity at site for several months. Project sign is still posted, BMPs installed and the underground utililities for the townhomes are complete.
|
General Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 | | PEND |
Evan Jenkins
|
|
|
No Activity has occured since site prep inspection. BMP's still installed. No ESC issues at this time.
|
General Inspection | 7/13/2016 | 7/13/2016 | 7/13/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/28/2016 | 6/28/2016 | 6/28/2016 | | CANC |
Evan Jenkins
|
|
|
No Activity at Site
|
General Inspection | 6/13/2016 | 6/13/2016 | 6/13/2016 | | PEND |
Evan Jenkins
|
|
|
no activity
|
General Inspection | 5/26/2016 | 5/26/2016 | 5/26/2016 | | CANC |
Andy J. Long
|
|
|
no activity at site
|
General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 | | PASS |
Andy J. Long
|
|
|
No activity. No issues at site. Perimeter wattles and DI bags installed around site for townhome construction yet to be started.
|
General Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/5/2016 | 4/5/2016 | 4/5/2016 | | PASS |
Evan Jenkins
|
|
|
No activity, BMP's installed
|
Aging Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/21/2015 | 12/21/2015 | 12/21/2015 | P | PASS |
Andy J. Long
|
|
|
No activity at site. Perimeter wattles and DI bags installed in receiving storm drains. No trackout or sediment runoff observed. Approved.
|
General Inspection | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. BMPs installed including inlet protect, permit signage, and perimeter wattles. No trackout, sediment runoff, or discharges from site observed.
|
General Inspection | 11/3/2015 | 11/4/2015 | 11/3/2015 | A | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on Idaho Street Townhomes. Perimeter wattles reinstalled after water line installations and Idaho Street was swept. Concrete washout is being contained. No trackout or discharges/spills observed. Approved.
|
Site Preparation | 9/3/2015 | 9/8/2015 | 9/8/2015 | A | PASS |
Andy J. Long
|
|
|
Idaho Street Townhomes @ 8:30 AM
Steve: ###-####
ESC permit sign posted with site details, BMPs installed including drop inlet bags on all potential receiving stormdrains. No infill or offhauling, allowed to install construction entrance after site grubbing and sewer taps installation on alley to the south. Perimter straw wattles properly staked and below grade of sidewalk pavement.
Approved for excavation. RP Steve on-site, will post EPA eNOI tracking number on ESC sign.
|
General Inspection | 1/12/2017 | 1/12/2017 | | | |
Melissa Jannusch
|
|
|
|