Permit Information
Permit NumberESC15-00976
StatusFinaled
Name STEVE SUTHERLAND
Site Address 112 N 17TH ST
Project NameIDAHO STREET TOWNHOMES
Customer Number 
ePlanReviewNo
Description
IDAHO STREET TOWNHOMES: (IDAHO STREET TOWNHOMES) - Grading permit to excavate, grade and compact site earth materials in preparation for a new shell building to be constructed under BLD .
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/5/20187/5/20187/6/2018 PASS
DetailsAndy J. Long
Subdivsion work complete. No ESC correctiions.
WIP on finishing Idaho Street Townhomes 1603- 1627 W. Idaho Street.

See ESC17-01457 to -01464 for ESC coverage on individual units.
DOC - Permit Finaled7/6/20187/6/20187/6/2018PPASS
DetailsAndy J. Long
General Inspection6/20/20186/20/20186/20/2018 PASS
DetailsMichael Zawacki
Everything contained in fenced off area. No dirt or garbage leaving site.
General Inspection6/5/20186/5/20186/5/2018 PASS
DetailsMichael Zawacki
Site contained. All prep and storage is on units driveway area.
General Inspection5/21/20185/21/20185/21/2018 PASS
DetailsMichael Zawacki
All work contained. Working on prep to fram garages.
General Inspection5/4/20185/4/20185/4/2018 PASS
DetailsMichael Zawacki
WIP. Cinder block wall now seperates site from 17th. All material stored on back of lot with acces from alley. No ESC issues.
General Inspection4/19/20184/19/20184/20/2018 PASS
DetailsMichael Zawacki
WIP, no ESC issues.
General Inspection4/4/20184/4/20184/4/2018 PASS
DetailsMichael Zawacki
Site perimeter has expanded and sidewalk on 16th is now blocked. No esc issues, site is contained and maintained.
General Inspection3/20/20183/20/20183/20/2018 PASS
DetailsAndy J. Long
WIP on east townhomes. No trackout, no discharges. Trash contained, clean site.
General Inspection3/5/20183/5/20183/5/2018 PASS
DetailsMichael Zawacki
Framing on phase 2, interior work also in progress. Site is clean, no issues.
General Inspection2/16/20182/16/20182/20/2018 PASS
DetailsMichael Zawacki
Phase 2 under construction. Washout on site, trash box provided. Site is clean and maintained. No dirt leaving site.
General Inspection2/1/20182/1/20182/1/2018 PASS
DetailsAndy J. Long
WIP on east units of the Idaho Street townhomes. Permit signs posted, foundations poured used concrete washout pit, no trackout, spills or discharges. Trash container on site, no litter around site. Approved.
General Inspection1/17/20181/17/20181/17/2018 PASS
DetailsMichael Zawacki
WEIP on second phase. Wattle is starting to degrade. No runoff from site.
General Inspection1/2/20181/2/20181/2/2018 PASS
DetailsAndy J. Long
Foundations for new Idaho St. townhomes have been poured on east end of block. No activity currently. No ESC or housekeeping issues observed.
General Inspection12/18/201712/18/201712/18/2017 PASS
DetailsAndy J. Long
WIP on east sction of Idaho Street townhomes. No trackout or discharges. Trash contained, concrete washout pit on site. Approved.
General Inspection12/1/201712/1/201712/1/2017 PASS
DetailsMichael Zawacki
New foundations poured. Some material stored on site. No loose trah or dirt. No runoff leaving site.
General Inspection11/16/201711/16/201711/16/2017 PASS
DetailsAndy J. Long
Idaho Street townhome project is back in progress. 6 townhomes on east side of block now have active permits. Foundations have been poured, concrete wahout pit has been utilized. Permit signs posted around perimeter. No trackout or discharges.
General Inspection11/1/201711/1/201711/1/2017 PASS
DetailsMichael Zawacki
Phase 1 complete. No new activity.
General Inspection10/17/201710/17/201710/18/2017 CANC
DetailsAndy J. Long
no activity
General Inspection10/2/201710/2/201710/2/2017 CANC
DetailsAndy J. Long
General Inspection9/15/20179/15/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection8/31/20178/31/20178/31/2017 PASS
DetailsAndy J. Long
General Inspection8/16/20178/16/20178/16/2017 CANC
DetailsAndy J. Long
General Inspection8/1/20178/1/20178/1/2017 PASS
DetailsAndy J. Long
General Inspection7/17/20177/17/20177/17/2017 PASS
DetailsAndy J. Long
No activity. Completed units for sale and are landscaped.
General Inspection6/30/20176/30/20176/30/2017 PASS
DetailsMelissa Jannusch
First section of townhomes is complete. The rest of the parcel is still vacant and not stabilized.
General Inspection6/15/20176/15/20176/16/2017 PASS
DetailsAndy J. Long
General Inspection5/31/20175/31/20175/31/2017 PASS
DetailsMelissa Jannusch
Almost complete. Trash and outhouse need to be removed before ESC site final.
General Inspection5/16/20175/16/20175/17/2017 PASS
DetailsAndy J. Long
No new activity. East parcel of the townhome block are prepared for construction. No discharges, trackout, or other issues.
General Inspection5/1/20175/1/20175/1/2017 PASS
DetailsAndy J. Long
No activity at time of inspection. No discharges, uncontained trash or other issues. Site is clean and new townhomes have been landscaped.
General Inspection4/14/20174/14/20174/17/2017 PASS
DetailsAndy J. Long
General Inspection3/30/20173/30/20173/30/2017 CANC
DetailsMelissa Jannusch
General Inspection3/15/20173/15/20173/15/2017 PASS
DetailsAndy J. Long
WIP on Idaho Street townhomes. Construction access through paved alley. Idaho Street sidewalk and landscaping installed. No trackout or discharges. Site perimeter is clean.
General Inspection2/28/20172/28/20172/28/2017 PASS
DetailsAndy J. Long
WIP on town homes and garage units by alley behind the Cabana. No muddy trackout, uncontained trash or discharges observed. No corrections requested.
General Inspection2/13/20172/13/20172/13/2017 PASS
DetailsMelissa Jannusch
General Inspection1/27/20171/27/20171/30/2017 PASS
DetailsMelissa Jannusch
Vertical WIP. Sign posted. No track out. Waste containment beginning to overflow. Check that the container has been emptied during the next inspection. Some scattered building materials, but all contained onsite. Some areas still snow covered.
General Inspection12/28/201612/28/201612/29/2016 PASS
DetailsAndy J. Long
No trackout, discharges or muddy access areas. BMPs installed, permits posted in alley
General Inspection12/13/201612/13/201612/15/2016 PASS
DetailsAndy J. Long
General Inspection11/28/201611/28/201611/28/2016 PASS
DetailsAndy J. Long
WIP on phase 1 of Idaho Street townhomes. Surrounding DIs have inlet protection. Perimeter wattles and lined concrete washout onsite. No trackout or discharges. Site is in compliance. Permits posted.
General Inspection11/11/201611/11/201611/14/2016 PASS
DetailsAndy J. Long
Conference10/27/201610/27/201610/27/2016PPASS
DetailsAndy J. Long
4 of 9 new Idaho Street Townhomes are to start. Onsite meeting for 9 new ESC permits for each parcel.

Wattles installed at east end of project. DI bag to be reinstall on Main Street at 17th. Concrete washout containment provided. See also site preps for ESC16-01317 to ESC16-01325
General Inspection10/13/201610/13/201610/13/2016 PASS
DetailsAndy J. Long
No activity at Idaho Street townhomes. Permits for SFHs/townhomes have been submitted to City for review. No corrections requested at this time.
General Inspection9/28/20169/28/20169/28/2016 CANC
DetailsAndy J. Long
General Inspection9/13/20169/13/20169/13/2016 PASS
DetailsAndy J. Long
General Inspection8/29/20168/29/20168/29/2016 PASS
DetailsEvan Jenkins
Backhoe onsite not. It appears grading will occur soon. At time of inspection, no work has occured yet
General Inspection8/12/20168/12/20168/12/2016 PASS
DetailsAndy J. Long
No activity at site for several months. Project sign is still posted, BMPs installed and the underground utililities for the townhomes are complete.
General Inspection7/28/20167/28/20167/28/2016 PEND
DetailsEvan Jenkins
No Activity has occured since site prep inspection. BMP's still installed. No ESC issues at this time.
General Inspection7/13/20167/13/20167/13/2016 PASS
DetailsEvan Jenkins
General Inspection6/28/20166/28/20166/28/2016 CANC
DetailsEvan Jenkins
No Activity at Site
General Inspection6/13/20166/13/20166/13/2016 PEND
DetailsEvan Jenkins
no activity
General Inspection5/26/20165/26/20165/26/2016 CANC
DetailsAndy J. Long
no activity at site
General Inspection5/11/20165/11/20165/11/2016 PASS
DetailsAndy J. Long
No activity. No issues at site. Perimeter wattles and DI bags installed around site for townhome construction yet to be started.
General Inspection4/21/20164/21/20164/21/2016 PASS
DetailsAndy J. Long
General Inspection4/5/20164/5/20164/5/2016 PASS
DetailsEvan Jenkins
No activity, BMP's installed
Aging Inspection2/23/20162/23/20162/23/2016 PASS
DetailsEvan Jenkins
General Inspection12/21/201512/21/201512/21/2015PPASS
DetailsAndy J. Long
No activity at site. Perimeter wattles and DI bags installed in receiving storm drains. No trackout or sediment runoff observed. Approved.
General Inspection11/3/201511/3/201511/3/2015PPASS
DetailsAndy J. Long
No activity at time of inspection. BMPs installed including inlet protect, permit signage, and perimeter wattles. No trackout, sediment runoff, or discharges from site observed.
General Inspection11/3/201511/4/201511/3/2015ACANC
DetailsAndy J. Long
data entry error
General Inspection9/29/20159/29/20159/29/2015PPASS
DetailsAndy J. Long
WIP on Idaho Street Townhomes. Perimeter wattles reinstalled after water line installations and Idaho Street was swept. Concrete washout is being contained. No trackout or discharges/spills observed. Approved.
Site Preparation9/3/20159/8/20159/8/2015APASS
DetailsAndy J. Long
Idaho Street Townhomes @ 8:30 AM

Steve: ###-####

ESC permit sign posted with site details, BMPs installed including drop inlet bags on all potential receiving stormdrains. No infill or offhauling, allowed to install construction entrance after site grubbing and sewer taps installation on alley to the south. Perimter straw wattles properly staked and below grade of sidewalk pavement.

Approved for excavation. RP Steve on-site, will post EPA eNOI tracking number on ESC sign.
General Inspection1/12/20171/12/2017   
DetailsMelissa Jannusch