Permit Information
Permit NumberESC16-00329
StatusFinaled
Name TOWNER DAVID K
Site Address 3299 E RED STONE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/16/20188/17/20188/17/2018APASS
DetailsAndy J. Long
Addition complete. No sediment leaving site. Homeowner finishing landscaping. ESC permit finaled.
General Inspection8/16/20188/16/20188/16/2018 CANC
DetailsAndy J. Long
General Inspection8/1/20188/1/20188/1/2018 CANC
DetailsAndy J. Long
General Inspection7/17/20187/17/20187/17/2018 CANC
DetailsAndy J. Long
General Inspection7/2/20187/2/20187/2/2018 CANC
DetailsAndy J. Long
General Inspection6/15/20186/15/20186/15/2018 CANC
DetailsAndy J. Long
General Inspection5/31/20185/31/20185/31/2018 CANC
DetailsAndy J. Long
General Inspection5/16/20185/16/20185/16/2018 CANC
DetailsAndy J. Long
General Inspection5/1/20185/1/20185/1/2018 CANC
DetailsAndy J. Long
General Inspection4/16/20184/16/20184/16/2018 PASS
DetailsMichael Zawacki
WIP on side of home.
General Inspection3/30/20183/30/20183/30/2018 CANC
DetailsAndy J. Long
General Inspection3/15/20183/15/20183/15/2018 PASS
DetailsMichael Zawacki
Area surrounding addition is gravel, no issues.
General Inspection2/28/20182/28/20182/28/2018 CANC
DetailsAndy J. Long
General Inspection2/13/20182/13/20182/15/2018 PASS
DetailsMichael Zawacki
WIP No issues
General Inspection1/29/20181/29/20181/29/2018 CANC
DetailsAndy J. Long
General Inspection1/12/20181/12/20181/12/2018 PASS
DetailsAndy J. Long
WIP on addition. No ESC violations. Runoff from disturbed flows to back yard.
General Inspection12/28/201712/28/201712/28/2017 CANC
DetailsAndy J. Long
General Inspection12/13/201712/13/201712/13/2017 CANC
DetailsAndy J. Long
General Inspection11/28/201711/28/201711/28/2017 CANC
DetailsAndy J. Long
General Inspection11/13/201711/13/201711/13/2017 PASS
DetailsMichael Zawacki
WIP. Permit displayed on side of shed. Some bare area but no runoff.
General Inspection10/27/201710/27/201710/27/2017 CANC
DetailsAndy J. Long
General Inspection10/12/201710/12/201710/12/2017 CANC
DetailsAndy J. Long
General Inspection9/27/20179/27/20179/28/2017 PASS
DetailsAndy J. Long
Project still in progress. No violations observed.
General Inspection9/12/20179/12/20179/18/2017 CANC
DetailsAndy J. Long
General Inspection8/28/20178/28/20178/28/2017 CANC
DetailsAndy J. Long
General Inspection8/11/20178/11/20178/14/2017 CANC
DetailsAndy J. Long
General Inspection7/27/20177/27/20177/27/2017 CANC
DetailsAndy J. Long
General Inspection7/12/20177/12/20177/13/2017 PASS
DetailsAndy J. Long
Project still in progress. No violations. Homeowner doing the work.
General Inspection6/27/20176/27/20176/27/2017 CANC
DetailsAndy J. Long
General Inspection6/12/20176/12/20176/12/2017 PASS
DetailsMelissa Jannusch
WIP no ESC issue observed.
General Inspection5/26/20175/26/20175/26/2017 CANC
DetailsAndy J. Long
General Inspection5/11/20175/11/20175/11/2017 CANC
DetailsAndy J. Long
General Inspection4/26/20174/26/20174/26/2017 CANC
DetailsAndy J. Long
General Inspection4/11/20174/11/20174/11/2017 CANC
DetailsAndy J. Long
General Inspection3/27/20173/27/20173/27/2017 PASS
DetailsMelissa Jannusch
No WIP. No ESC issues observed.
General Inspection3/10/20173/10/20173/10/2017 CANC
DetailsAndy J. Long
General Inspection2/23/20172/23/20172/24/2017 PASS
DetailsMelissa Jannusch
General Inspection2/8/20172/8/20172/8/2017 PASS
DetailsMelissa Jannusch
WIP. No trackout. No corrections requested.
General Inspection1/24/20171/24/20171/27/2017 CANC
DetailsAndy J. Long
General Inspection1/9/20171/9/20171/9/2017 PASS
DetailsAndy J. Long
General Inspection12/23/201612/23/201612/28/2016 CANC
DetailsAndy J. Long
General Inspection12/8/201612/8/201612/8/2016 CANC
DetailsAndy J. Long
General Inspection11/23/201611/23/201611/23/2016 CANC
DetailsAndy J. Long
General Inspection11/8/201611/8/201611/8/2016 PASS
DetailsAndy J. Long
homeowner lansdcaping project and site improvements in progress. Permit sign posted, no trackout or other issues. No corrections needed
General Inspection10/21/201610/21/201610/21/2016 CANC
DetailsAndy J. Long
General Inspection10/6/201610/6/201610/6/2016 PASS
DetailsAndy J. Long
General Inspection9/21/20169/21/20169/21/2016 PASS
DetailsAndy J. Long
Aging Inspection9/2/20169/2/20169/2/2016 PASS
DetailsAndy J. Long
Retaining wall project is still active. Work occuring in vegetated backyard. No trackout, permit posted on the right side of house where construction access is. Approved.
General Inspection3/14/20163/29/20163/29/2016PPASS
DetailsAndy J. Long
WIP on addition. No trackout or loose sediment leaving site. Disturbed area drains to vegetated back yard. Clean site. No corrections needed.
Conference3/14/20163/14/20163/14/2016PPASS
DetailsAndy J. Long
Discussion with homeowner RP regarding project and ESC permit conditions. Project to occur within confines of vegetated backyard that receives and treats potential stormwater runoff from area of disturbance. RP familiar with and aware of clean up requirements of any inidental trackout.

Significant excavation to begin the following weeks, project approved to proceed as planned, no site prep BMP inspection required.

General inspection of site conditions shall occer within 2-3 week.