General Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Andy J. Long
|
|
|
Complete and landscaped. Temp BmPs to remain installed for two other Roth homes still in progress on skylark
|
General Inspection | 7/10/2019 | 7/10/2019 | 7/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/25/2019 | 6/25/2019 | 6/26/2019 | | PASS |
Michael Zawacki
|
|
|
All work and landscaping completed. Permit opened to continue monitoring site.
|
General Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed and grasses on hill have come in good. No ESC issues.
|
General Inspection | 5/24/2019 | 5/24/2019 | 5/24/2019 | | PASS |
Michael Zawacki
|
|
|
Inspected 5-22. Correction on site were made.
|
General Inspection | 5/9/2019 | 5/9/2019 | 5/9/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 | | PASS |
Michael Zawacki
|
|
|
Gave ok to start removing remaining wattle from hillside. Growth is good and wattle no longer needed. Home is complete, section of concrete porch has been replaced.
|
General Inspection | 4/9/2019 | 4/9/2019 | 4/9/2019 | | PASS |
Michael Zawacki
|
|
|
Hillside has good growth. SOme wattles were removed that no longer where needed. No new activity on lot above.
|
General Inspection | 3/25/2019 | 3/25/2019 | 3/25/2019 | | PASS |
Michael Zawacki
|
|
|
No ESC issues. Slopes are stable and road is clean. No trash. Will start working on new home soon as it is dry enough to excavate.
|
General Inspection | 3/8/2019 | 3/8/2019 | 3/11/2019 | | PASS |
Michael Zawacki
|
|
|
All 3 lots inspected. No runoff, trash, or trackout. No activity at any site.
|
General Inspection | 2/21/2019 | 2/21/2019 | 2/27/2019 | | PASS |
Michael Zawacki
|
|
|
No workers on site, no materials on road. Did not walk hillside due to rain and mud.
|
General Inspection | 2/6/2019 | 2/6/2019 | 2/6/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 1/18/2019 | 1/22/2019 | 1/24/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/17/2019 | 1/17/2019 | 1/18/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 1/1/2019 | 1/1/2019 | 1/2/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | | PEND |
Andy J. Long
|
|
|
revegetation. Home complete and for sale.
|
General Inspection | 11/15/2018 | 11/15/2018 | 11/15/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/31/2018 | 10/31/2018 | 11/8/2018 | | PASS |
Andy J. Long
|
|
|
Home complete and listed for sale. Landscaping installed. Will monitor for revegetation.
|
General Inspection | 10/16/2018 | 10/16/2018 | 10/16/2018 | | PASS |
Michael Zawacki
|
|
|
Lot landscaped and front drive and pathway nearly finished. All work is interior.
|
General Inspection | 10/1/2018 | 10/1/2018 | 10/2/2018 | | PASS |
Michael Zawacki
|
|
|
Most of lot stabalized and landscaped. Only bare spot is along driveway to front door.
|
General Inspection | 9/14/2018 | 9/14/2018 | 9/19/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/30/2018 | 8/30/2018 | 8/30/2018 | | PASS |
Michael Zawacki
|
|
|
Inlets at end of road are all protected. Pile of gravel off of road. Demo work has started on old remaining home.
|
General Inspection | 8/15/2018 | 8/15/2018 | 8/15/2018 | A | FAIL |
Andy J. Long
|
|
|
Trash over full. Debris in gutter, including cementitious materials.. Landscaping crew rinsing stuff down the gutter.
Roth Homes owned house above site needs perimter sediment control and staging area that is on the flatter portion of lot or driveway.
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/15/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 | | PASS |
Michael Zawacki
|
|
|
Hillsides are stable, some rock work below house. Little bit of trackout from workers in driveway
|
General Inspection | 7/13/2018 | 7/13/2018 | 7/13/2018 | | PASS |
Michael Zawacki
|
|
|
Nothing leaving sites, no dust. Trash boxes eed to be emptied.
|
General Inspection | 6/28/2018 | 6/28/2018 | 6/28/2018 | | PASS |
Michael Zawacki
|
|
|
Hillsides are stable. New trenches for power, stockpile on site, very close to being in road. Unable to check drainage below home, trench blocked access on one side, scaffolding on other. Trash is contained at both sites, right of way not being used for storage. No ESC issues at either site.
|
General Inspection | 6/13/2018 | 6/13/2018 | 6/13/2018 | | PASS |
Michael Zawacki
|
|
|
Hillsides are covered with growth , no loose dirt or fugitive dust. Trash is contained. ACHD has paved the road and installed/repaired curb gutters. Inlet protection now in all lower DIs.
|
General Inspection | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on interior. Trash contained, no trackout from site. Slopes have vegetated through the erosion controls blankets. No corrections requested.
|
General Inspection | 5/24/2018 | 5/24/2018 | 5/29/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 | | PASS |
Andy J. Long
|
|
|
Interior work in progress. Skylark street and sewer are currently under construction. Slopes are vegetated. No new landscaping observed. No corrections requested.
|
General Inspection | 4/24/2018 | 4/24/2018 | 4/27/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/9/2018 | 4/9/2018 | 4/9/2018 | | PASS |
Michael Zawacki
|
|
|
No issues after rain event. BMPs held up, drain worked under home.
|
General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 | | PASS |
Michael Zawacki
|
|
|
Hillside BMPs intact after rain event. Drain on hill worked, no sign of overflowing. Outlet still isn't lowest point.
|
General Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 | | PART |
Andy J. Long
|
|
|
Trash contained, no trackout, no new hillside or slope erosion observed.
Correction request to install perimeter wattle on the disturbed yard above to prevent muddy runoff down driveway to Skylark
|
General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 | | PASS |
Michael Zawacki
|
|
|
Hillside BMPs still in place. No runoff onto road. Trash and lumber is being put into trash box. Some lumber is being stored on road in cul-de-sac.
|
General Inspection | 2/6/2018 | 2/6/2018 | 2/6/2018 | | PASS |
Michael Zawacki
|
|
|
No trackout or materials stored in road. Hillside BMPs still in place and hill is stable.
|
General Inspection | 1/19/2018 | 1/19/2018 | 1/19/2018 | | PART |
Michael Zawacki
|
|
|
Hillside BMPs are holding up, no issues with hills. Sonme dirt on road and in gutters. Is coming from home above new properties.
|
General Inspection | 1/4/2018 | 1/4/2018 | 1/4/2018 | | PART |
Michael Zawacki
|
|
|
Hillside has been protected with wattle, jute, and tackifier. Has hel up fine to snow melt. Outpak washout is full, there has been washout onto the ground. Trench exposed for water, some dirt is on road.
|
BMP Violation | 12/20/2017 | 12/20/2017 | 12/21/2017 | P | PART |
Andy J. Long
|
|
|
report of uncontained washout
No washout onsite. Uncontained washout pile has remained on lot and did not go to gutter. Contractor will clean up.
No trackout, slope stabilization and sediment controls at bottom of site are installed properly and in working condition.
|
General Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 | | PEND |
Michael Zawacki
|
|
|
Area has been stabalized. Pile of gravel in road, will need to monitor to see if it is soon removed.
|
Site Preparation | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PASS |
Michael Zawacki
|
|
|
Trackout cleaned. Hillside now has jute, wattle, and has been hydro seeded.
|
General Inspection | 11/15/2017 | 11/15/2017 | 11/15/2017 | A | PEND |
Andy J. Long
|
|
|
Trash contained, street has been recently swept. Some inlets have sediement filter bags, others do not in order to prevent and overflow and water running down slope instead of in pipe.
Still no erosion controls (hydromulch with tacifier, slope interupting wattles) on the slopes. Slopes have raked flat and are ready for installation.
RP Cleve says he is expecting the work to be done this week or next.
Cleve installed a sheeting underneath fence to prevent water flowing underneath. Silt fence on other side of fence is in good condtion.
|
General Inspection | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | FAIL |
Michael Zawacki
|
|
|
Excessive trackout on road. No protection on steep slopes.
|
Random Inspection | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | PASS |
Michael Zawacki
|
|
|
Retaining wall built greatly reducing the length of slope. Stii no protection on bare hillsides.
|
BMP Violation | 10/16/2017 | 10/16/2017 | 10/19/2017 | P | PEND |
Andy J. Long
|
|
|
crew has cleaned up uncontained washout per RP Cleve. Road also being swept on 10/18. Will follow up at site and post new ESC permits.
Earthwork to occur this week and next and schedule is set to have erosion control blankets installed within 2-3 weeks.
|
General Inspection | 10/9/2017 | 10/9/2017 | 10/11/2017 | | FAIL |
Michael Zawacki
|
|
|
No permit or SWPPP book displayed. Site is in decent shape, perimeter is protected, dirt is staying on site. Trackout is on street. Shared with 124 Skylark is unprotected. One of four DIs is unprotected. 3 workers on site, no one knew anything about an RP or site manager.
|
General Inspection | 9/22/2017 | 9/22/2017 | 9/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/7/2017 | 9/7/2017 | 9/8/2017 | | CANC |
Andy J. Long
|
|
|
|
Conference | 8/18/2017 | 8/23/2017 | 8/25/2017 | P | PEND |
Andy J. Long
|
|
|
Trash pile has been cleaned up.
Corrections:
- provide dumpster - provide concrete washout
No issues with sediment control down slope. Issued warning/notice that slopes will need to be vegetated or covered with ECBs before end of October.
|
General Inspection | 8/17/2017 | 8/17/2017 | 8/18/2017 | | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 8/18/2017 | 8/18/2017 | 8/18/2017 | P | FAIL |
Andy J. Long
|
|
|
Multiple violations at site despite many site visits and requests.
Corrections: - clean up trash pile - provide trash container large enough to contain trash - forbid spraying concrete washout down hill. - Provide concrete washout pit. - install sediment control at bottom graded hill and plan for temporary stabilization to prepare for winter.
|
General Inspection | 8/2/2017 | 8/2/2017 | 8/7/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/17/2017 | 7/17/2017 | 7/17/2017 | P | CANC |
Melissa Jannusch
|
|
|
|
Site Preparation | 7/10/2017 | 7/17/2017 | 7/17/2017 | A | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 7/7/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Melissa Jannusch
|
|
|
Trash, trackout, and concrete washout have been cleaned up. Project back in compliance status.
|
General Inspection | 7/10/2017 | 7/10/2017 | 7/10/2017 | P | PART |
Melissa Jannusch
|
|
|
Concrete slurry has been cleaned up and trackout swept. Trash is still full.
|
General Inspection | 7/6/2017 | 7/6/2017 | 7/7/2017 | | FAIL |
Melissa Jannusch
|
|
|
WIP on road, curb, and gutters. Staging lane is clean, trash is contained. No ESC corrections observed. Concrete slurry flowing down side of hill to vegetation. Silt fence ok. No curb installed under fence. Trackout. Wattles not staked. Overflowing trash. No dust problems at time of inspection. Corrections requested: Clean up concrete washout that has spilled downhill. Install concrete washout to properly contain concrete. Communicate use to subcontractors Clean up overflowing trash Sweep up trackout Restake wattles Left voice message and text message with GC Cleve requesting corrections Follow up next week
|
General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 | | PASS |
Andy J. Long
|
|
|
WIP on retaining walls and foundation. No trackout or discharges to Skylark, trash is contained.
Silt fence at bottom of hill will be restored once walls are complete and the slope is regraded.
No corrections issued, site currently in compliance. Inspection 6/20. See also ESC16-00935 for adjacent project.
|
General Inspection | 6/5/2017 | 6/5/2017 | 6/6/2017 | P | FAIL |
Andy J. Long
|
|
|
Correction requests from previous inspection have not been completed. The corrections below are specific to the Skylark upper lot.
Corrections remaining:
1. Properly install wattle (staked and trenched) that has been placed between stockpile and road. 2. Provide a clearly marked designated concrete washout pit. 3. Need to empty full trash container. 4. Sweep uphill neighbors driveway and install wattle to prevent dirt from getting on driveway and running off to street. 5. Need to discuss the silt fence that has been overtopped with loose dirt. In the central section, evidence of sediment runoff beyond property line is an area that needs silt or other perimeter control.
See also ESC16-00935 for inspection requests.
This is the 2nd correction request. If corrections are not complete will need to escalate with fines and/or SWO until all corrections can be made.
|
Conference | 5/30/2017 | 5/31/2017 | 6/1/2017 | P | PEND |
Andy J. Long
|
|
|
4:30 PM
Reviewed damage and uncleaned areas around downhill neighbor's detached garage. There is evidence of damage to the slope area direcctly behind garage.
Section of silt fence is below the wooden fence needs re-installation. Low point of perimeter wattle along fence needs to be corrected to not channel water to this area.
Corrections needed: - sweep gutter in front of projects - empty over full trash containment - provide concrete washout pit - currently just spraying down the slope - set schedule for disturbed slope stabilization - install wattle along stockpile in front of upper project as previously requested and agreed to.
|
General Inspection | 5/18/2017 | 5/22/2017 | 5/22/2017 | A | PART |
Andy J. Long
|
|
|
follow up
Initial clean up of mud trapped behind wattles and silt fence has been completed as well material removed from behind the neighbors garage exterior. Water at bottoom of hill should now flow off the lot at corner to a vegetated area. New rock has been placed along Skylark to be a staging area, but it is very small gravel.
DI bags have been re-installed on Skylark.
Corrections remaining: - sweep gutter and street on Skylark - protect stockpile along Skylark
|
General Inspection | 5/17/2017 | 5/19/2017 | 5/18/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/17/2017 | 5/17/2017 | 5/17/2017 | | PEND |
Andy J. Long
|
|
|
Storm drain blockage on Skylark culdesac diverted street runoff through unstabilized site. Slopes on the site have eroded with material sliding behind downhill neighbor's garage.
Crew is currently cleaning up mud behind the garage and builder and homeowner are resolving the issue. Mud behind silt fence and wattles to be removed and put back on site. The storm drains shall remain without sediment bags installed to prevent happening again, alternative control will be improved perimeter control and construction staging area on Skylark
Wattle at low point of lot to be relocated/re-positioned to divert runoff to the grassy area away from the neighbors garage & driveway.
Clean up efforts should continue and notified RP Cleve that if a retaining wall is installed to protect the garage, PW Hillside shall be notified w/ proper review & permits.
|
General Inspection | 5/2/2017 | 5/2/2017 | 5/3/2017 | | PASS |
Melissa Jannusch
|
|
|
Fence is in. Silt fence needs to be repaired. Potentially install a wattle at the bottom of the fence to prevent sediment from going underneath.
|
General Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on retaining wall/foundation. Silt fence needs minor maintenance. No sediment running of site into the vegetated area.
|
Complaint Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Melissa Jannusch
|
|
|
See ESC 16-00935 for complaint inspection. This is the site above where the drainage issues occurred.
|
General Inspection | 3/29/2017 | 3/29/2017 | 3/29/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP construction entrance okay. Silt fence ok. No corrections.
|
General Inspection | 3/2/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled; inspection conducted at adjacent site 3/1 with no violations observed
|
General Inspection | 2/14/2017 | 2/14/2017 | 2/14/2017 | | PASS |
Melissa Jannusch
|
|
|
Okay. Corrections have been made for adjacent site 123 skylark dr.
|
General Inspection | 11/15/2016 | 11/30/2016 | 12/1/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation excavation for adjacent hillside lots. Silt fence and security/ debris catchment fence installed below work area.
|
Site Preparation | 11/14/2016 | 11/15/2016 | 11/15/2016 | P | PASS |
Andy J. Long
|
|
|
2:00 PM Cleve Cushing ###-####
Approved for construction. Perimeter silt fence installed properly at bottom of lot. Permit sign and ESC plan on site. First phase will be to demolish/remove old concrete slab tennis court, then provide stabilized entrance.
Note: no DI protection to be installed to prevent clogs or unintentional re-routing of stormwater.
|