Permit Information
Permit NumberESC16-01253
StatusFinaled
Name JAMES MAIR
Site Address 5796 E MILLET DR
Project NameMair Residence
Customer Number 
ePlanReviewNo
Description
Entrance to site on site plan is from the Triplett townhomes access road, stabilized construction entrance required. Perimeter sediment controls to be installed per ESC plan to protect existing retention swales. Permit sign, concrete washout, and trash containment shall be provided. Site preparation inspection is required, to schedule call 384-3802
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/7/20191/7/20191/7/2019PPASS
DetailsAndy J. Long
Yard is no landscaped, home is occupied.. Storm water retention basin is fully vegetated. No sediment bags left in storm drains on Millet. Adjacent lot used by both new homes still has some bare spots but the lower end has a vegetative buffer. Should re-seed itself during the Spring.
General Inspection1/7/20191/7/20191/7/2019 CANC
DetailsAndy J. Long
General Inspection12/21/201812/21/201812/21/2018 CANC
DetailsAndy J. Long
General Inspection12/6/201812/6/201812/6/2018 CANC
DetailsAndy J. Long
General Inspection11/21/201811/21/201811/21/2018 CANC
DetailsAndy J. Long
General Inspection11/6/201811/6/201811/6/2018 CANC
DetailsMichael Zawacki
General Inspection10/22/201810/22/201810/22/2018 PASS
DetailsMichael Zawacki
Landscaping has begun, no ESC issues.
General Inspection10/5/201810/5/201810/5/2018 CANC
DetailsAndy J. Long
General Inspection9/20/20189/20/20189/20/2018 PASS
DetailsMichael Zawacki
Landscaping has begun.
General Inspection9/5/20189/5/20189/5/2018 CANC
DetailsAndy J. Long
General Inspection8/21/20188/21/20188/21/2018 PASS
DetailsMichael Zawacki
Still needs landscaping.
General Inspection8/6/20188/6/20188/7/2018 CANC
DetailsAndy J. Long
General Inspection7/20/20187/20/20187/20/2018 CANC
DetailsAndy J. Long
General Inspection7/5/20187/5/20187/6/2018 CANC
DetailsAndy J. Long
General Inspection6/20/20186/20/20186/20/2018 CANC
DetailsAndy J. Long
revegetation phase. no inpsection
Site Final6/4/20186/5/20186/8/2018PNR
DetailsAndy J. Long
Homeowner in process of landscaping. No sediment runoff observed. All other permits finaled. Not ready for ESC final.
General Inspection6/4/20186/4/20186/4/2018 CANC
DetailsAndy J. Long
reschudled for site final
General Inspection5/18/20185/18/20185/18/2018 PASS
DetailsMichael Zawacki
Home complete, no runoff, weeds starting to cover property.
General Inspection5/3/20185/3/20185/3/2018 CANC
DetailsAndy J. Long
General Inspection4/18/20184/18/20184/18/2018 PASS
DetailsMichael Zawacki
Home complete. Yard still exposed.
General Inspection4/3/20184/3/20184/3/2018 CANC
DetailsAndy J. Long
General Inspection3/19/20183/19/20183/20/2018 PASS
DetailsAndy J. Long
No landscaping in backyard yet. No sediment runoff to street. No corrections, will continue to monitor.
General Inspection3/2/20183/2/20183/2/2018 CANC
DetailsAndy J. Long
General Inspection2/15/20182/15/20182/15/2018 PASS
DetailsMichael Zawacki
Home complete, waiting for landscaping for final stabalization.
General Inspection1/31/20181/31/20181/31/2018 PASS
DetailsMichael Zawacki
Home complete. Lot is seeded but not yet stabalized.
General Inspection1/12/20181/16/20181/16/2018PPASS
DetailsAndy J. Long
Home complete, BLD finaled. Driveway has been installed. Will keep open for revegetation and stabilization of adjacent lot used as staging area.
General Inspection1/11/20181/11/20181/12/2018 CANC
DetailsAndy J. Long
rescheduled
General Inspection12/27/201712/27/201712/28/2017 PASS
DetailsMichael Zawacki
Snow covered. No new disturbances since last inspection.
General Inspection12/12/201712/12/201712/12/2017 PASS
DetailsMichael Zawacki
Driveway completed. Lot has been hydroseeded.
General Inspection11/27/201711/27/201711/27/2017 PASS
DetailsAndy J. Long
No trackout or sediment runoff to MIllet. No corrections requested. Site not yet landscaped.
General Inspection11/10/201711/10/201711/13/2017 PASS
DetailsMichael Zawacki
No new activity since last inspection. Some dirt on road heading out, no other significant runoff.
General Inspection10/26/201710/26/201710/31/2017 PASS
DetailsMichael Zawacki
Currently working on driveway.
General Inspection10/10/201710/11/201710/12/2017APART
DetailsAndy J. Long
No stabilized entrance or perimeter sediment controls. Some minor trackout. Project appears to be preparing for driveway.

Clean up entrance, provide perimeter sediment control
Tracking Control10/2/201710/3/201710/10/2017ACANC
DetailsAndy J. Long
Tracking Control9/25/20179/25/201710/2/2017PPEND
DetailsAndy J. Long
General Inspection9/22/20179/22/20179/22/2017 CANC
DetailsAndy J. Long
General Inspection9/7/20179/7/20179/8/2017 CANC
DetailsAndy J. Long
General Inspection8/23/20178/23/20178/25/2017 CANC
DetailsAndy J. Long
General Inspection8/8/20178/8/20178/14/2017 CANC
DetailsAndy J. Long
General Inspection7/21/20177/21/20177/21/2017 PASS
DetailsAndy J. Long
General Inspection7/6/20177/6/20177/6/2017 PASS
DetailsMelissa Jannusch
No ESC issues observed.
General Inspection6/21/20176/21/20176/21/2017PPASS
DetailsMelissa Jannusch
Road is clean. no trackout or runoff. Trash container on stie. No corrections.
General Inspection6/9/20176/9/20176/9/2017 CANC
DetailsMelissa Jannusch
General Inspection5/22/20175/22/20175/22/2017PPASS
DetailsMelissa Jannusch
Verticle WIP. No other ESC issues.
Aging Inspection4/18/20174/18/20174/18/2017PCANC
DetailsEric Strole
Tracking Control2/6/20172/13/20172/14/2017APASS
DetailsMelissa Jannusch
Trakout has been addressed.
General Inspection1/31/20172/1/20172/6/2017PFAIL
DetailsMelissa Jannusch
DI bags are clogged, BMPs need to be installed around stockpiles, construction entrance has muddy trackout needs more gravel. Sign is posted.
Correction Request: Left messages with James Mair (RP) 2nd verbal warning. Request to: empty DI bags, place BMPs around stockpiles, clean construction entrance.
General Inspection1/11/20171/11/20171/11/2017PFAIL
DetailsAndy J. Long
No stockpile perimeter sediment controls installed on bottom end of foundation backfill stockpile placed on adajecent lot.

Construction entrance area beyond asphalt is muddy and needs more construction rock.

BMP follow up inspection scheduled for 1/12
General Inspection11/29/201612/13/201612/20/2016ACANC
DetailsAndy J. Long
Site Preparation11/28/201611/29/201611/29/2016APASS
DetailsAndy J. Long
James Phone #: ###-####

Onsite inspection conducted. BMPs installed include permit sign, ESC plan box, sediment control wattles staked and trenched at bottom of slope above existing vegetative swales. Will install construction entrance and/or use existing paved access to the east (per permission of lot owner). Preservation of existing vegetation at bottom of slope to act as buffer for swales.

Approved for construction.
BMP Violation1/11/20171/12/2017 A 
DetailsAndy J. Long