Permit Information
Permit NumberESC11-00879
StatusFinaled
Name CAMERON JAYO
Site Address 401 W BOISE HILLS DR
Project NameSOMERSET VILLAGE SUB
Customer Number 
ePlanReviewNo
Description
Site development only. **NO VERTICAL CONSTRUCTION**. ACTUAL AREA OF DISTURBANCE EQUALS 5.02 ACRES. ADDITIONAL FEES DUE FOR INCREASE IN PERMITTED SCOPE - KMJ 1/18/13
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/16/20178/16/20178/18/2017PPASS
DetailsAndy J. Long
Greater than 70% stabilization. One parcel left that is soon to start SFH construction a and with seperate ESC permit.

Jayo home builders will remove any DI protection left in subdivision. No other temp BMPs on site. ESC permit conditions satisfied.
General Inspection8/9/20178/9/20178/11/2017 CANC
DetailsAndy J. Long
General Inspection7/25/20177/25/20177/25/2017 CANC
DetailsAndy J. Long
General Inspection7/10/20177/10/20177/10/2017 PASS
DetailsMelissa Jannusch
No trackout trash contained. No ESC corrections issued.
General Inspection6/23/20176/23/20176/23/2017 CANC
DetailsAndy J. Long
General Inspection6/8/20176/8/20176/8/2017 CANC
DetailsAndy J. Long
General Inspection5/24/20175/24/20175/24/2017 PASS
DetailsMelissa Jannusch
WIP on SFH and clubhouse. No ESC issues
General Inspection5/9/20175/9/20175/9/2017 PASS
DetailsMelissa Jannusch
WIP. Trash contained no trackout.
General Inspection4/24/20174/24/20174/24/2017 PASS
DetailsMelissa Jannusch
WIP on SFHs. subdivision controls are ok.
General Inspection4/7/20174/7/20174/7/2017 PASS
DetailsMelissa Jannusch
WIP on SFH and clubhouse. BMPS okay. Trash contained
Random Inspection3/23/20173/23/20173/23/2017PPASS
DetailsMelissa Jannusch
Excavation for foundations underway. Concrete washout okay. No ESC issues observed.
BMP Violation3/8/20173/15/20173/15/2017APASS
DetailsMelissa Jannusch
Concrete slurry cleaned up. Excavation started on two remaining lots. Ensure use of washout for further concrete work. No corrections requested.
BMP Violation3/1/20173/8/20173/8/2017AFAIL
DetailsMelissa Jannusch
Concrete slurry on undeveloped lot. Correction request: clean up slurry. Use concrete washout in future.
General Inspection3/1/20173/1/20173/1/2017PPASS
DetailsMelissa Jannusch
General Inspection2/20/20172/20/20172/21/2017 CANC
DetailsMelissa Jannusch
Holiday
General Inspection2/3/20172/3/20172/3/2017 CANC
DetailsAndy J. Long
General Inspection1/19/20171/19/20171/19/2017PPEND
DetailsMelissa Jannusch
Damaged perimneter control wattles. Make sure these are replaced before construction begins. DI bag removed for mesa grande to allow for snow melt to drain. No muddy discharges occuring.
General Inspection1/11/20171/11/20171/19/2017 CANC
DetailsAndy J. Long
General Inspection12/27/201612/27/201612/28/2016 PASS
DetailsAndy J. Long
frozen conditions. no construction; no snow melt runoff issues observed 12/27
General Inspection12/12/201612/12/201612/14/2016 CANC
DetailsAndy J. Long
General Inspection11/25/201611/25/201611/25/2016 CANC
DetailsAndy J. Long
General Inspection11/10/201611/10/201611/10/2016 CANC
DetailsAndy J. Long
General Inspection10/26/201610/26/201610/27/2016 CANC
DetailsAndy J. Long
General Inspection10/11/201610/11/201610/12/2016 PASS
DetailsAndy J. Long
Subdivision BMPS installed and still inspected & maintained by Jayo ESC crew. No issues or violations observed. 3 active projects occuring, permitted seperately. Only 2 lots remaining open and have perimeter sediment control wattles installed.
General Inspection9/26/20169/26/20169/26/2016 PASS
DetailsAndy J. Long
3 open lots remaining and clubhouse in progress. Once SFH starts this fall on open lots, will close this permit and temp BMP removal will be completed under those permits by Shane Jayo (Jayo Construction). No uncontained trash, discharges, or BMP failures observed.
General Inspection9/9/20169/9/20169/9/2016 CANC
DetailsAndy J. Long
General Inspection8/25/20168/25/20168/25/2016 PASS
DetailsAndy J. Long
WIP on SFHs. DI bags on Mesa Verde are in good condition and maintained. This permit can be closed once wattles below pump house and all other temporary BMPs are removed.
General Inspection8/10/20168/10/20168/10/2016 PASS
DetailsEvan Jenkins
BMP's still installed. no ESC issues observed
General Inspection7/26/20167/26/20167/26/2016 PASS
DetailsEvan Jenkins
No issues observed at this time
General Inspection7/11/20167/11/20167/11/2016 PASS
DetailsEvan Jenkins
General Inspection6/24/20166/24/20166/24/2016 PART
DetailsAndy J. Long
Request to Jayo Homes to sweep gutter on Painted Rock.

No trackout or discharges leaving subdivsion. DI bags and perimeter wattles installed.
General Inspection6/9/20166/9/20166/9/2016 PART
DetailsAndy J. Long
Need to sweep curb and gutter due to trackout and loose dirt from SFH construciton. No dirt coming outside of subdivision to Boise Hills Dr and onsite inlets have sediment protection. Just needs house cleaning.
General Inspection5/25/20165/25/20165/25/2016 PASS
DetailsEvan Jenkins
Work occuring on 1 single family home. No issues observed at this time
General Inspection5/10/20165/10/20165/10/2016 PASS
DetailsEvan Jenkins
1 SFH in progress. no discharges leaving construction site at this time.
General Inspection4/25/20164/25/20164/25/2016 PASS
DetailsEvan Jenkins
1 SFH in progress. BMP's installed. No ESC issues observed
General Inspection4/8/20164/8/20164/8/2016 PASS
DetailsAndy J. Long
WIP on SFH on Painted Feather. Trash contained, DIs have sediment filter bags installed, and open parcel have a perimter sediment controls. Subdivision near completion, 3-4 lots remaining.
General Inspection3/24/20163/24/20163/24/2016 PASS
DetailsEvan Jenkins
No issues observed at this time.
General Inspection3/9/20163/9/20163/9/2016 PASS
DetailsAndy J. Long
WIP on SFHs by Jayo Construction. Subdvision inlets and perimeter sediment controls are installed. No trackout from sites, trash contained, and no discharges/spills observed. No corrections.
General Inspection2/23/20162/23/20162/23/2016 PASS
DetailsEvan Jenkins
No activitity
General Inspection2/8/20162/8/20162/8/2016 PASS
DetailsAndy J. Long
General Inspection1/22/20161/22/20161/22/2016 DONE
DetailsEvan Jenkins
General Inspection1/7/20161/7/20161/7/2016 PASS
DetailsEvan Jenkins
General Inspection12/23/201512/23/201512/23/2015 PASS
DetailsAndy J. Long
General Inspection12/8/201512/8/201512/9/2015 PART
DetailsAndy J. Long
WIP on SFHs. RP logging ESC/SWPPP inspections. Perimeter controls are in good condition, no trackout or loose sediment on roads/gutters.

Site in good condition post rain event 0.42".

Verbal correction to Jayo to conduct maintenance on inlet filter bags. Many are over 50% capacity and could break.
General Inspection11/23/201511/23/201511/24/2015 CANC
DetailsAndy J. Long
General Inspection11/6/201511/6/201511/6/2015 PASS
DetailsEvan Jenkins
General Inspection10/22/201510/22/201510/22/2015 PASS
DetailsEvan Jenkins
No activity
No ESC issues observed
General Inspection10/7/201510/7/201510/7/2015 PASS
DetailsEvan Jenkins
General Inspection9/22/20159/22/20159/22/2015 PART
DetailsAndy J. Long
Need to reinstall DI bag on curve at Mesa Verde St.

Sediment runoff from last storm has been swept up. No trackout or discharges offsite. No new rill or gully erosion observed. Perimeter wattles are installed.
General Inspection9/7/20159/7/20159/8/2015 CANC
DetailsAndy J. Long
holiday
General Inspection8/21/20158/21/20158/21/2015 PASS
DetailsAndy J. Long
Streets and gutters around Somerset Village are free of trackout. Perimeter controls are properly installed. No corrections at this time.
General Inspection8/6/20158/6/20158/6/2015 PASS
DetailsAndy J. Long
WIP on SFHs in Somerset Village. Streets and gutters are clean, perimeter BMPs on vacant lots installed and at bottom of site along Boise Hills.
General Inspection7/22/20157/22/20157/22/2015 PART
DetailsAndy J. Long
Streets, gutters and inlets are free of significant amounts of sediment. Trash at SFHs is contained and workers parking on the street to avoid tractkout. DI bags are installed.

Correction:
1. Sweep upper side of Painted Rock and install new wattle over the old, now degraded straw wattle.
General Inspection7/7/20157/7/20157/7/2015 PASS
DetailsEvan Jenkins
General Inspection6/22/20156/22/20156/22/2015 PASS
DetailsEvan Jenkins
General Inspection6/5/20156/5/20156/5/2015 PASS
DetailsEvan Jenkins
General Inspection5/21/20155/21/20155/21/2015 PART
DetailsEvan Jenkins
The drop inlet near instersection of W. Sand Dune Ln and Crestline needs to be cleaned out due to discharge leaving the site, entering this particular drop inlet. Also, area below the site on Crestline, sediment needs to be shoveled/swept up and perform maintenance on that drop inlet as well. This has ccured due to recent heavy rains
General Inspection5/6/20155/6/20155/6/2015 PASS
DetailsEvan Jenkins
Illegal concrete washout has been recently removed. No other esc issues at this time
General Inspection4/21/20154/21/20154/21/2015 PASS
DetailsAndy J. Long
Drop inlets have sediment bag protection with adequate capacity. Perimeter wattles are installed on undeveloped lots. No rill or gully erosion on the slopes between parcels. Trash containers provided for active projects. No corrections at this time.
General Inspection4/6/20154/6/20154/6/2015 PASS
DetailsEvan Jenkins
no issues at this time
General Inspection3/20/20153/20/20153/20/2015 FAIL
DetailsEvan Jenkins
Concrete rubble/washout that illegally dumped by culdesac needs to be removed ASAP
General Inspection3/5/20153/5/20153/5/2015 PART
DetailsEvan Jenkins
Some perimeter BMP's (wattles) need to be replaced due to contractors running them over, causing significant damage.
General Inspection2/18/20152/18/20152/23/2015 PASS
DetailsAndy J. Long
Somerset Village subdivision BMPs in place. Perimeter wattles and silt fence are in good condition. Contractors are now using washout pit, though no new foundations have been poured recently. No trackout and remainig capacity in DI bags. No corrections at this time.
General Inspection2/3/20152/3/20152/3/2015 PART
DetailsAndy J. Long
Perimeter sediment controls and inlet protection are installed and working effectively.

1 corrections for Jayo Construction:
Provide lined concrete washout for the Somerset Village SFHs.
General Inspection1/19/20151/19/20151/20/2015 PASS
DetailsEvan Jenkins
No Issues at this time
WIP
General Inspection1/2/20151/2/20151/2/2015 CANC
DetailsAndy J. Long
General Inspection12/18/201412/18/201412/18/2014 PASS
DetailsAndy J. Long
Perimeter BMPs and drop inlet protection are properly installed and effective. No trackout from open lots, no offsite discharges, and no hillside erosion observed. Approved. Open lots are not stabilized and are to be developed. Permit will remain open.
Random Inspection12/3/201412/3/201412/3/2014PPASS
DetailsAndy J. Long
Site perimeter BMPs, stabilization efforts, drainage diversion channels, and downslope sediment containment fence have kept Somerset Village in compliance during the recent precipitation.

Contractors parking on street and keeping it clean. Site is in compliance. Approved.
General Inspection11/28/201411/28/201411/28/2014 PASS
DetailsEvan Jenkins
no activity at time of inspection. no esc issues
General Inspection11/13/201411/13/201411/13/2014 PASS
DetailsEvan Jenkins
General Inspection10/29/201410/29/201410/29/2014 PASS
DetailsEvan Jenkins
site is in good shape. no violations at this time
General Inspection10/14/201410/14/201410/14/2014 PASS
DetailsEvan Jenkins
Only vertical construction taking place at this time. no erosion issues at this time
General Inspection9/29/20149/29/20149/29/2014 PART
DetailsAndy J. Long
ESC BMPs contained sediment from open areas in Somerset Village. Workers are parking on street so no trackout issues observed.

1 correction: Repair the section of damaged gatorgaurd wattle perimeter control towards bottom of site.
General Inspection9/12/20149/12/20149/12/2014 PASS
DetailsAndy J. Long
General Inspection8/28/20148/28/20148/28/2014 PASS
DetailsEvan Jenkins
no runnoff occuring
silt fence still in good shape
no esc issues at time of inspection
General Inspection8/13/20148/13/20148/13/2014 PASS
DetailsEvan Jenkins
site and bmp's are in good shape
no issues at this time
General Inspection7/29/20147/29/20147/29/2014 PASS
DetailsAndy J. Long
BMPs installed and in good condition. No further subdivision development construction occuring but need to monitor the open lots for issues until covered by individual SFH permits. No corrections at this time.
General Inspection7/14/20147/14/20147/14/2014 PASS
DetailsAndy J. Long
BMPs installed. Streets and gutters are free of sediment. Minimal acitivity at the time being.
General Inspection6/27/20146/27/20146/27/2014 PASS
DetailsAndy J. Long
BMPs in good condtion. Permit posted and SWPPP on site. No corrections required.
General Inspection6/12/20146/12/20146/12/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
General Inspection5/28/20145/28/20145/28/2014 PASS
DetailsEvan Jenkins
General Inspection5/13/20145/13/20145/13/2014 PASS
DetailsEvan Jenkins
General Inspection4/28/20144/28/20144/28/2014 PASS
DetailsEvan Jenkins
no issues at time of inspection
General Inspection4/11/20144/11/20144/11/2014 PASS
DetailsEvan Jenkins
Random Inspection3/27/20143/27/20143/27/2014PPASS
DetailsAndy J. Long
Somerset Village BMPs retaining sediment./filtering runoff. Ground allow most of water to infiltrate it appears. No trackout or other issues observed.
General Inspection3/17/20143/17/20143/17/2014 PASS
DetailsAndy J. Long
Silt fences and wattles at bottom of development are in good condition. New drainage channel with rock chips behind houses should divert some runoff around lots. No trackout. No activity at time of inspection.
General Inspection2/28/20142/28/20143/4/2014 PASS
DetailsEvan Jenkins
Site looks pretty good/clean. Some perimeter BMP maintenance needs to occur due to the large amount of precip the area has recieved the past week and yesterday
BMP Violation2/13/20142/13/20142/13/2014PPASS
DetailsAndy J. Long
follow up/hillside inspection.



Corrections made:

1. DI bags installed on MS4 on Boise Hills
2. Silt fences retrenched at base of hill
3. Additional wattles installed along Boise Hills.
4. Rills will be repaired as conditions allow, still very muddy/loose.

BMP installed Ken was onsite. No new violations or trackout issues at this time.
Random Inspection2/6/20142/6/20142/6/2014APART
DetailsAndy J. Long
Silt fences at bottom of development have been trenched in as requested in previous C/N. SWPPP inspection was conducted 1/30. The recent snow has not yet melted yet so no issues at time of inspection.

Corrections:
1. Install filter bags on two DIs in sequence at Boise Hills and Mesa Grande. Currenty no protection.
2. Repair rills on banks of empty lots and install BMPs to prevent further erosion.

Emailed Cameron Jayo the corrections.
Random Inspection1/29/20141/29/20141/29/2014PPART
DetailsAndy J. Long
Permiter and downslope BMPs are filtering runoff and containing sediment.

Some rill erosion is occuring in between graded lots and destroying the banks seperating lots. Will need to be fixed or it will continue to get worse.

Jayo has been informed of the issues. Will continue to monitor.
Random Inspection1/15/20141/15/20141/15/2014PPART
DetailsAndy J. Long
Some wattles have been restored but contractors still accessing bare lots and driving over wattles. Need to conduct maintenance on downslope BMPs and post signage to stop contractors from causing trackout.

Cement washout for new sites has been moved up above next Somerset Village #3. A construction entrance will need to be provided once the washout is in use.
General Inspection1/6/20141/6/20141/6/2014 PEND
DetailsEvan Jenkins
Same Comments as Andy:
Also: Shall Address Trackout issues that are occuring on various lots asap
General Inspection12/20/201312/20/201312/20/2013 PEND
DetailsAndy J. Long
No new violations. Silt fence and wattles to be repaired when unfrozen. Jayo # ###-####
BMP Violation12/4/201312/5/201312/5/2013AFAIL
DetailsAndy J. Long
Corrections:

1. Repair silt fences at bottom of site - re-attached to posts and check that they are trenched in.

2. Install wattle behind the last downhill silt fence where it has blown out.

3. Drop inlet protection is needed on the MS4 structures on Boise Hills, just west of Mesa Grande.

Spoke with Ken, Jayo employee making corrections at other Somerset site and provided instructions to make corrections.

General Inspection11/28/201311/28/201311/29/2013 CANC
DetailsEvan Jenkins
Holiday
BMP Violation11/13/201311/13/201311/13/2013PPASS
DetailsAndy J. Long
Follow up inspection/drive by. Noncompliant concrete washout at corner of Mesa Grande and Boise Hills has been removed. New washout pit not yet provided, will be placed next to road to prevent track out problems.
General Inspection11/6/201311/7/201311/7/2013PPART
DetailsEvan Jenkins
Remove Concrete washout, dig new pit for washout
General Inspection11/6/201311/6/201311/6/2013 PART
DetailsEvan Jenkins
Called Cameron via cell and left voicemail. entire site needs the streets swept, trackout occuring throughout site. Also, designated concrete washout needs to be a dug pit. Currently washing out ontop of ground, in which the wash water is migrating all over the surface ground. Will reinspect tomorrow afternoon 11-7-13
General Inspection10/22/201310/22/201310/22/2013 PART
DetailsAndy J. Long
Subdivision development BMPs in place, no trackout or other corrections. Individual homesite with ESC13-00824 had cement dust from dry cutting cement. No water hook up at site and no portable source provided. Gave verbal CN to contractors to provide dust suppression.
General Inspection10/7/201310/7/201310/7/2013 PASS
DetailsAndy J. Long
BMPs in place. No ESC violations at this time. Approved.
General Inspection9/19/20139/20/20139/20/2013APASS
DetailsBill VanDegrift
ERIC, I THOUGHT THIS MIGHT BE A GOOD ONE FOR YOU TO TAKE THE NEW INSPECTOR ON left message with RP to make a walk through to tune up bmp's, looks good
General Inspection9/17/20139/17/20139/19/2013 PEND
DetailsDixie Fellows
SENT TO ERIC SO HE CAN TAKE THE NEW INSPECTOR ON THIS ONE
General Inspection9/2/20139/2/20139/10/2013 PASS
DetailsRock A. Hudson
General Inspection8/16/20138/16/20138/16/2013 CANC
DetailsKimberly M. Johnson
General Inspection8/1/20138/1/20138/1/2013 PASS
DetailsKimberly M. Johnson
General Inspection7/17/20137/17/20137/17/2013 PASS
DetailsClint A Smith
General Inspection7/2/20137/2/20137/2/2013 PEND
DetailsClint A Smith
General Inspection6/17/20136/17/20136/17/2013 PASS
DetailsClint A Smith
General Inspection5/31/20135/31/20135/31/2013 PASS
DetailsClint A Smith
General Inspection5/16/20135/16/20135/16/2013 PART
DetailsClint A Smith
General Inspection5/1/20135/1/20135/3/2013ACANC
DetailsClint A Smith
General Inspection4/22/20134/22/20134/22/2013 PASS
DetailsClint A Smith
General Inspection4/5/20134/5/20134/5/2013 FAIL
DetailsClint A Smith
Verbal to RP;
Remove all sediment build up located in the gutterpan. Maintain storm drain inlet protection. Re-install sediment barriers through out project where they have been pulled up.
General Inspection3/21/20133/21/20133/21/2013 CANC
DetailsClint A Smith
Tracking Control3/4/20133/6/20133/6/2013PPASS
DetailsClint A Smith
Tracking Control3/4/20133/4/20133/4/2013AFAIL
DetailsClint A Smith
Correction Noticce posted. Message to RP;
Clean up all tracked sediment in the interior of the subdivision. Failure to comply with the notice will result in further enforcement. Will re-inspect on 3/6/2013 PM.
General Inspection2/21/20132/21/20132/21/2013 FAIL
DetailsClint A Smith
Verbal to RP;
Clean up the tracking off of the roadways.
General Inspection2/6/20132/6/20132/7/2013 FAIL
DetailsClint A Smith
VErbal to RP:
Maintain sediment control through out the project area.
General Inspection1/22/20131/22/20131/22/2013 PART
DetailsClint A Smith
Have begun going vertical. No developement activities due to being complete or the winter weather conditions.
General Inspection1/7/20131/7/20131/7/2013 PASS
DetailsClint A Smith
Tracking Control12/17/201212/21/201212/21/2012APART
DetailsClint A Smith
Explained to RP that daily clean up is require to keep hard surfaces free of any sediment asnd debris.
Tracking Control12/13/201212/17/201212/17/2012AFAIL
DetailsClint A Smith
Correction Notice:
Clean up all sediment tracked out from retaining wall construction. Will re-inspect on 12/21/2012
General Inspection12/13/201212/13/201212/13/2012 FAIL
DetailsClint A Smith
Verbal message to RP:
Clean up tracked sediment from the retaining wall workers. Will follow up on 12/17/2012
BMP Violation11/26/201211/28/201211/28/2012PPASS
DetailsClint A Smith
General Inspection11/21/201211/21/201211/26/2012 FAIL
DetailsClint A Smith
Message to RP:
Maintain the sediment controls in multiple locations through out the project area. Will follow up on 11/28/2012 PM
General Inspection11/6/201211/6/201211/7/2012 PASS
DetailsClint A Smith
Noo activity
Conference10/19/201210/19/201210/22/2012PDONE
DetailsKimberly M. Johnson
Contractor requested meeting to look at perimeter controls where the retaining wall has been put in. Wants to verify straw wattles are okay to remove. Call ###-####. Findings: once retaining wall is complete, it will be okay to remove wattles around perimeter of Boise Hills Drive. May be neccessary to complete landscaping on outside if retaining wall backfill is brought above finished grade of sidewalk. Need building inspector to look at retaining wall in case a building permit is neccessary.
General Inspection10/11/201210/11/201210/11/2012 PART
DetailsKimberly M. Johnson
BMP Violation9/19/20129/26/20129/26/2012APART
DetailsClint A Smith
BMP Violation7/20/20129/24/20129/24/2012ACANC
DetailsClint A Smith
Moved to 9/25/2012
Aging Inspection9/19/20129/19/20129/19/2012 PART
DetailsClint A Smith
Site is temporarly stabilized with a seed, tach, amd mulch blend. But all perimeter controls installed on all down gradent slopes hae or are decomposed. Explained to the RP in a message form to replace all decomposed perimeter control by 9/25/2012. Will re-inspect on 9/26/2012 AM.
General Inspection7/20/20127/20/20127/20/2012 PART
DetailsClint A Smith
Discussed with the developer to clean up and remove the sediment and silft fence at the lower section going into the drainage pond and stabilize the area with vegitation. Will allow them to begin and complete the activities in late Sept. early Oct depending on weather conditions at that time. Will follow up in Late Sept.
General Inspection7/5/20127/5/20127/9/2012 PASS
DetailsClint A Smith
General Inspection6/20/20126/20/20126/20/2012 PASS
DetailsClint A Smith
All BMP's on all down grades where there is a potental for a dischage coming of the the disurbed areas onro the street into the stormdrain sysem. Also have applied a tachifier and mulch on all of the building pads of the project area.
General Inspection6/5/20126/5/20126/5/2012 FAIL
DetailsClint A Smith
Written Correction Notice (message to RP):
Install sediment barriers along back of curb and sidewalks though out project area where the disturbed soils grade slopes towards back of sidewalks, curbs or gutter pans.
Install stormdrain inlet protection on all stormdrains interior and exterior where no protection is provided.

FAILURE TO COMPLY WITH THE NOTICE WITHIN THE GIVEN TIMEFRAME, WILL RESULT IN A STOP WORK ORDER.

Will re-inspect on 6/20/2012pm
General Inspection5/21/20125/21/20125/22/2012 PASS
DetailsDaryl DeGrange
site clean, ok
BMP Violation5/3/20125/4/20125/10/2012APART
DetailsClint A Smith
Daily clean up in required.
General Inspection5/3/20125/3/20125/3/2012AFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all residual sediment off of the hard surfaces (streets and gutterpan) surrounding the project area. Also maitain all storm drain inlet protection. Must be completed by the end of the day. Will re-inspect on 5/4/2012 AM.
General Inspection4/18/20124/18/20124/23/2012 FAIL
DetailsClint A Smith
Refer to Stop Work Order Inspection for all required corrections.
Stop Work Order4/23/20124/23/20124/23/2012PFAIL
DetailsClint A Smith
STOP WORK ORDER POSTED
Corrections:
1. Clean up all sediment and debris off of the roadway on Crestline.
2. Provide storm drain inlet protection along Crestline.
3. Provide sediment barriers on slopes along Crestline.
4. Provide sediment barriers within the flow channel that directs into the drainage basin.
All violation must be corrected for stop work order to be lifted.
BMP Violation3/30/20124/3/20124/5/2012APART
DetailsClint A Smith
Need to maintain ant tracked out material on a daily basis.
General Inspection3/30/20123/30/20123/30/2012 FAIL
DetailsClint A Smith
Message to RP:
Removal all sediment barriers along the road of the other side of the project area. Also remove all debris from the sediment barriers and sediment built up in the roadway. Will follow up for the corrction made on 4/3/2011.
BMP Violation3/15/20123/15/20123/15/2012PPART
DetailsClint A Smith
Activily cleaning up the street. Also have deverted all storm water run off through the project area on the street back into the project. All storm water runoff from the water shed area above the project is deverted into the storm water pond above the project area.
General Inspection3/1/20123/13/20123/14/2012APART
DetailsClint A Smith
After stop work was placed on the project the contactor took the inititive to clean up all sediment off of all the hard surface and devert all runoff form the construction area towards the road back into the the project area. Will re-inspect tomorrow to inspect site condition once again.
General Inspection3/1/20123/1/20123/1/2012 PEND
DetailsDixie Fellows
this is a huge job..i sent to clint
General Inspection2/15/20122/15/20122/15/2012 PART
DetailsClint A Smith
Access is not installed at this time.
General Inspection1/30/20121/31/20122/1/2012PFAIL
DetailsClint A Smith
Verbal to RP:
Stabilized the access at the top of the project off of Clubview. Must have it stabilized prior to activity on project starting up agian.
General Inspection1/30/20121/30/20121/30/2012 CANC
DetailsClint A Smith
Moved to 1/31/20111:30PM
General Inspection1/15/20121/15/20121/17/2012 CANC
DetailsClint A Smith
Weekend