Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberESC15-00541
StatusFinaled
Name SCOTT KIMBALL
Site Address 4441 N BOGUS BASIN RD
Project NameHackberry Sub Phase II
Customer Number 
ePlanReviewNo
Description
Phase II of Hackberry Sub. No Grading Permit Required per Jason Taylor
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/1/20182/1/20182/1/2018 PASS
DetailsAndy J. Long
All parcels on Hackberry Ranch phase II have been built upon except for 1. Open areas and stormwater pond are vegetated, no temporary BMPs left on site. All homes on Horsethief by Seidl Homes.

Subdivision ESC permit conditions, two open ESC permits on Horsethief. No corrections requested.
DOC - Permit Finaled2/1/20182/1/20182/1/2018PPASS
DetailsAndy J. Long
General Inspection1/17/20181/17/20181/17/2018 PASS
DetailsMichael Zawacki
Few lots still vacant. No runoff onto streets. All hillsides stable.
General Inspection1/2/20181/2/20181/2/2018 PASS
DetailsMichael Zawacki
Few vacant lots remain. No issues with runoff from melting snow.
General Inspection12/18/201712/18/201712/18/2017 PASS
DetailsAndy J. Long
No new SFHs under construction. Most DI bags have been pull, common areas vegetated. 3 open lots remain. DI bags still installed on section of Paso Fino
General Inspection12/1/201712/1/201712/1/2017 PASS
DetailsMichael Zawacki
General Inspection11/16/201711/16/201711/20/2017 PASS
DetailsMichael Zawacki
Most lost are complete, still a few homesites available. Neighborhood BMPs still in place.
General Inspection11/1/201711/1/201711/1/2017 CANC
DetailsAndy J. Long
General Inspection10/17/201710/17/201710/19/2017 PASS
DetailsMichael Zawacki
General Inspection10/2/201710/2/201710/2/2017 PASS
DetailsAndy J. Long
General Inspection9/15/20179/15/20179/19/2017 PASS
DetailsAndy J. Long
General Inspection8/31/20178/31/20178/31/2017 CANC
DetailsAndy J. Long
General Inspection8/16/20178/16/20178/18/2017 CANC
DetailsAndy J. Long
General Inspection8/1/20178/1/20178/3/2017 PASS
DetailsAndy J. Long
WIP on SFHs. BMPs installed, trash contained, no trackout.. Permanent stormwater retention pond installed and vegetated.
General Inspection7/14/20177/17/20177/18/2017APASS
DetailsMelissa Jannusch
WIP on SFHs some interior trackout. Trash contained.
General Inspection7/14/20177/14/20177/14/2017 CANC
DetailsMelissa Jannusch
General Inspection6/29/20176/29/20176/30/2017 PASS
DetailsAndy J. Long
General Inspection6/14/20176/14/20176/16/2017 PASS
DetailsMelissa Jannusch
WIP on SFHs. No trackout to hill road. Minimal interior trackout. Trash is contained. No ESC violations.
General Inspection5/30/20175/30/20175/31/2017 PASS
DetailsMelissa Jannusch
WIP on SFH. Subdivision BMPs ok.
General Inspection5/15/20175/15/20175/15/2017 PASS
DetailsAndy J. Long
Hackbery Ranch Phase II homes (Horse Trail) are in progress by Seidl Homes. No trackout or discharges. Work staying within limits of disturbance and surrounding vegetation has been preserved. No
General Inspection4/28/20174/28/20174/28/2017 CANC
DetailsAndy J. Long
General Inspection4/13/20174/13/20174/13/2017PPASS
DetailsMelissa Jannusch
WIP on SFHs. Perimeter controls are in place and working well. Trackout is controlled. No corrections.
General Inspection4/3/20174/3/20174/5/2017 CANC
DetailsAndy J. Long
General Inspection3/17/20173/17/20173/17/2017 CANC
DetailsAndy J. Long
General Inspection3/2/20173/2/20173/3/2017 CANC
DetailsAndy J. Long
General Inspection2/15/20172/15/20172/15/2017 FAIL
DetailsMelissa Jannusch
The sediment pond has a small channel of erosion that deposited dirt into the pipe under the access road and into the swale. Talked with Scott (RP) and . Talked with Scott (RP) and he is planning to schedule a sweeper and landscaper to work on the problems.
Corrections requested: remove sediment from pipe and swale. Repair swale. Sweep up trackout.
General Inspection1/31/20171/31/20172/1/2017 PASS
DetailsMelissa Jannusch
Snow covered conditions. No issues observed.
General Inspection1/16/20171/16/20171/19/2017 PASS
DetailsMelissa Jannusch
No issues observed
General Inspection12/30/201612/30/201612/30/2016 CANC
DetailsAndy J. Long
General Inspection12/15/201612/15/201612/21/2016 CANC
DetailsAndy J. Long
General Inspection11/30/201611/30/201611/30/2016 PASS
DetailsAndy J. Long
General Inspection11/15/201611/15/201611/17/2016 PASS
DetailsAndy J. Long
General Inspection10/31/201610/31/201611/2/2016 CANC
DetailsAndy J. Long
General Inspection10/14/201610/14/201610/14/2016 CANC
DetailsAndy J. Long
General Inspection9/29/20169/29/20169/29/2016 PASS
DetailsAndy J. Long
General Inspection9/14/20169/14/20169/14/2016 PASS
DetailsEvan Jenkins
No Issues observed at time of inspection
Conference8/30/20168/30/20168/30/2016PPASS
DetailsAndy J. Long
RP/developer informed me that topsoil has no been applied to slopes around development pads and in the stormwater pond constructed for Hackberry Ranch. A hydroseed mixture will be applied within the next 1-2 weeks (weather permitting).

No violation or issues observed at site.
General Inspection8/25/20168/25/20168/25/2016 PASS
DetailsEvan Jenkins
no activity occuring at time of inspection. Did not see any ESC issues at time of inspection
General Inspection8/10/20168/10/20168/10/2016 PASS
DetailsEvan Jenkins
BMP Violation7/26/20167/26/20167/26/2016PPEND
DetailsAndy J. Long
Verbal CN to RP to install sediment filter BMP on the two newly installed inlets in order to preserve the new system.

RP stated lots have been sold and BLD applications will soon be submitted for townhomes. Builder is to coordinate with developer on BMP installation in the mean time.

No trackout or discharges offsite.
Complaint Inspection7/21/20167/21/20167/21/2016PPART
DetailsAndy J. Long
Citizen complaint about track out and lack of ESC BMPs onsite.

No trackout to Bogus Basin. No activity or discharges.

Corrections needed:
- install sediment control on newly installed stormwater drop inlets on the access road.
- install perimeter control on upper side of road to prevent sand and silt running onto road and stormwater system.
General Inspection7/14/20167/14/20167/14/2016 PASS
DetailsEvan Jenkins
General Inspection6/29/20166/29/20166/30/2016 CANC
DetailsAndy J. Long
Random Inspection6/14/20166/14/20166/14/2016PPART
DetailsEvan Jenkins
Minor trackout.
Sweet Curb, Gutter and Bogus Basin Road
General Inspection6/9/20166/9/20166/9/2016 PASS
DetailsAndy J. Long
No activity at site. No violations. Access road and utilities are installed. Some loose sediment within site, but not runoff issues. No corrections at this time.
Complaint Inspection5/25/20165/25/20165/25/2016PPART
DetailsEvan Jenkins
Trackout Complaint

Ttackout has been swept up and no other ESC issues observed
General Inspection5/18/20165/18/20165/18/2016 PART
DetailsEvan Jenkins
Minor trackout onto Bogus Basin Road.
Corrections:
1.) Sweep Road and Curb
2.) Re-fresh construction entrance
General Inspection5/3/20165/3/20165/3/2016 PASS
DetailsEvan Jenkins
General Inspection4/18/20164/18/20164/18/2016 PASS
DetailsAndy J. Long
Random Inspection3/31/20163/31/20163/31/2016PPASS
DetailsAndy J. Long
New construction entrance has been installed. No trackout observed. Corrections were made as requested.

The cut hillsides have been hydroseeded. Utilities installed, but no road yet.
General Inspection3/24/20163/24/20163/24/2016 PART
DetailsEvan Jenkins
Install Construction entrance
Sweep Bogus Basin Road.
Contacted RP Scott Kimbal disclosing issues. He stated he will be his crew to install construction entrance asap and sweep the road
General Inspection3/9/20163/9/20163/10/2016 CANC
DetailsAndy J. Long
General Inspection2/16/20162/22/20162/22/2016APASS
DetailsAndy J. Long
General Inspection2/15/20162/15/20162/16/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection1/29/20161/29/20161/29/2016 PART
DetailsAndy J. Long
Need to post sign and install a tracking entrance or block the upper entrance to prevent future trackout. Site is in a depression, so water does not run off. The adjacent infiltration/retention areas have been undisturbed.

No trackout or discharges.
General Inspection1/14/20161/14/20161/14/2016 PASS
DetailsEvan Jenkins
Site covered with snow. no activity occuring during inspection. no esc issues observed
General Inspection12/28/201512/30/201512/30/2015APASS
DetailsAndy J. Long
WIP placing utilities. Geography/topography of site is self contained. No trackout to Bogus Basin. Vegetation surrounding drainage pond has been undisturbed. Very sandy soil.

No corrections at this time.
General Inspection12/24/201512/28/201512/28/2015PCANC
DetailsAndy J. Long
rescheduled
General Inspection12/24/201512/24/201512/24/2015 CANC
DetailsAndy J. Long
rescheduled for 12/28
General Inspection12/8/201512/8/201512/8/2015 PEND
DetailsEvan Jenkins
No activity occuring during inspection
General Inspection11/18/201511/18/201511/18/2015 PASS
DetailsEvan Jenkins
No activity at this time. Stockpiles are not eroding away. No ESC issues observed
General Inspection11/3/201511/3/201511/3/2015PPASS
DetailsAndy J. Long
No activity, lots have been rough graded and compacted. Some erosion within site has occurred, but sediment and sand is not leaving project area due to topograpy and location of project. No trackout, rock is onsite for drive access (shared with residence) and DIs on Bogus Basin have inlet protection.
Aging Inspection10/13/201510/13/201510/13/2015 PASS
DetailsAndy J. Long
No subdivision issues at Hackberry Ranch. No hillside erosion areas observed, sediment controls are installed, and re-planted vegetation has established.

Only one active SFH in progress. No trackout or discharges (see ESC15-00623). Approved.
General Inspection6/25/20156/25/20156/25/2015APASS
DetailsAndy J. Long
Grading complete, no vertical construction has occurred. Does not look like utilities have been stubbed in yet. Some sand has been added to lower terraces and the terraces have been track perpendicular to the slopes properly. No issues at site.
General Inspection5/19/20155/19/20155/19/2015PPASS
DetailsAndy J. Long
Site grading for Hackberry Ranch phase II is complete. Hillside have been tracked properly and hydroseeded. Only some minor rill erosion within site. No sediment leaving. Existing stormwater ponds and structures were undisturbed and are surround by vegetation.

No current activity. Does not look like site has utilities installed at this time. No corrections.