General Inspection | 1/9/2020 | 1/9/2020 | 1/9/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/25/2019 | 12/25/2019 | 12/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/10/2019 | 12/10/2019 | 12/10/2019 | | PASS |
Michael Zawacki
|
|
|
Everything around bridge stable.
|
General Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/8/2019 | 11/8/2019 | 11/12/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/24/2019 | 10/24/2019 | 10/25/2019 | | PASS |
Michael Zawacki
|
|
|
Need to do final walk throug and close permit.
|
General Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 | | PASS |
Michael Zawacki
|
|
|
Revegetated, no issues.
|
General Inspection | 8/23/2019 | 8/23/2019 | 8/23/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/8/2019 | 8/8/2019 | 8/8/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/24/2019 | 7/24/2019 | 7/24/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 | | PASS |
Michael Zawacki
|
|
|
Banks are stable, no esc issues.
|
General Inspection | 6/24/2019 | 6/24/2019 | 6/24/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/7/2019 | 6/7/2019 | 6/10/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/23/2019 | 5/23/2019 | 5/23/2019 | | PASS |
Michael Zawacki
|
|
|
Creek is flowing clean. No rills or runoff going to creek.
|
General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 | | PASS |
Michael Zawacki
|
|
|
Monitor until townhomes completed and area cleaned.
|
General Inspection | 4/23/2019 | 4/23/2019 | 4/23/2019 | | PASS |
Michael Zawacki
|
|
|
Will have site walkthrough when townhomes next door completed.
|
General Inspection | 4/8/2019 | 4/8/2019 | 4/8/2019 | | PASS |
Michael Zawacki
|
|
|
Permit will be closed after townhomes completed and satisfactory cleanup of creek and surrounding area. Permit is currently just to monitor site.
|
General Inspection | 3/22/2019 | 3/22/2019 | 3/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/7/2019 | 3/7/2019 | 3/7/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/20/2019 | 2/20/2019 | 2/26/2019 | | PASS |
Michael Zawacki
|
|
|
Will do site walk in spring
|
General Inspection | 2/1/2019 | 2/4/2019 | 2/6/2019 | P | PASS |
Michael Zawacki
|
|
|
All BMPs removed. Will continue to monitor until spring.
|
General Inspection | 1/29/2019 | 1/29/2019 | 2/1/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 12/28/2018 | 12/28/2018 | 12/28/2018 | | PASS |
Michael Zawacki
|
|
|
Site frozen and stable.
|
General Inspection | 12/13/2018 | 12/13/2018 | 12/13/2018 | | PASS |
Michael Zawacki
|
|
|
All BMPs removed. Grades down to water are in process of revegetation. No rilling or runoff into creek.
|
General Inspection | 11/28/2018 | 11/28/2018 | 11/29/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/13/2018 | 11/13/2018 | 11/14/2018 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | | PASS |
Michael Zawacki
|
|
|
Banks are growing and mostly stabalized. Landscaping completed.
|
General Inspection | 10/11/2018 | 10/11/2018 | 10/11/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/26/2018 | 9/26/2018 | 9/26/2018 | | PASS |
Michael Zawacki
|
|
|
Landscape and sign complete. Still some areas where crews accessed creek that aren't stable.
|
General Inspection | 9/11/2018 | 9/11/2018 | 9/11/2018 | | PEND |
Andy J. Long
|
|
|
Bridge complete. No ESC corrections directly related to project.
ESC permit to remain open for a coordinated old BMP and construction related trash pick up in Walling Creek between the new bridge and Parkcenter. Partners will be Brighton Corp, Brighton Homes, Boise ESC divisision and BPR.
Date of pickup tbd, October or November.
|
General Inspection | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Andy J. Long
|
|
|
Bridge is complete and open. BMPs removed from creek area directly downstream of bridge. No materials or dirty surfaces left on site.
Banks on either side are vegetating, will monitor through Fall.
|
General Inspection | 6/29/2018 | 7/13/2018 | 7/12/2018 | A | PASS |
Michael Zawacki
|
|
|
Silt fence still around creek, other BMPs have been removed. Eagle Landscape is on site doing rock work near bridge. Trench with line running along sidewalk.
|
Random Inspection | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | FAIL |
Michael Zawacki
|
|
|
None of the requested corrections completed. Scheduled follow up for 4-13
|
General Inspection | 6/20/2018 | 6/20/2018 | 6/21/2018 | P | FAIL |
Andy J. Long
|
|
|
Bridge is complete, but not yet open WIP on park monument sign. Shoulders and banks have had a seed and tacifier application. No temp BMPs left in creek, trash around banks is picked up.
Corrections needed:
- remove downed section of SF on NW side of bridge along creek. Install new sediment barrier/buffer below the bank - remove BMPs installed in basin between Warm Springs bypass and pathway. - check erosion observed on shoulds of road between bypass and bridge, may need additional stabilization - pay outstanding special investigation fees to the PDS permit desk
|
General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PART |
Andy J. Long
|
|
|
Follow up inspection. Dewatering was completed last Friday. Temporary holding area has now almost infiltrated. Silt fence across creek has bee removed. No turbid water in Walling Creek from site. Water levels have also been raised in creek.
Corrective actions to complete as project wraps up: - sweep and clean staging area/parking area at MA Williams park. - pick up windblown trash up stream from bridge. - pay special investigation fee applied for last weeks turbid discharge and associated time spent by ESC division to request and obseve corrective actions as well as sampling.
|
BMP Violation | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | PEND |
Andy J. Long
|
|
|
Turbidity samples of Walling Creek at first downstream pedestrian bridge were 190 NTU and 168 NTU. Well above the permissable +50 NTU over background level.
Plume had not reached east Parkcenter Bridge as of 12 PM. River is reading 13.9 NTU at Walling Creek confluence.
Crews moved dewatering hose to the basin between Greenbelt and Warm Springs bypass. Initial location where hose was moved too was found to have and outlet back to creek. This outlet now has additional controls should there be any overflow of first basin area.
2 hour investigation fee charged. Request to complete corrective action report and monitor until dewatering is complete, which is supposed to be today.
Discharge to waterway was stopped with 90 minutes of arriving at site.
Initial inspection, turbidity sampling, and investigation from 9:45-12 PM
|
Random Inspection | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | FAIL |
Andy J. Long
|
|
|
Crews dismantling settling structure while also pumping dirty water into system. Silt fence has lifted up and muddy water flowing down Walling Creek.
Immediate request to extend hose and land apply to the NW between greenbelt and Warm Springs bypass.. Do not want to flood excavation area so cannot shut down pump.
Notified RP and Syman to respond
|
General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on bridge deck. No trackout to Warm Springs bypass or BV Drive. Staging area is clean, no spills , loose trash, or mud. Dewatering water is clear passing out of settling chamber.
RP stated that within in the next few weeks disturbed areas within creek area will be seeded with an approved wetland plant & seed mix (per Parks and Rec)
|
Random Inspection | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP on bridge deck. Well point in place and pumping water from below excavated level, water is crystal clear and free from foam and odors. Diesel for generator has been placed in tote as a secondary containment. No issues with dirt leaving on Barber Valley or Warm Springs. Washout on north side of project, installed correctly and maintained.
|
General Inspection | 1/19/2018 | 1/19/2018 | 1/22/2018 | P | PASS |
Andy J. Long
|
|
|
Inspection on Friday 1/19. No activity at site. No trackout or issues in staging area at MA Williams park. Concrete washout is lined and on north side of creek. Dewateriing on-going, water is not visibly turbid and is going through settling system and silt fence.
No corrections requested.
|
Random Inspection | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on bridge pylon footings. No trackout or discharge from staging area. No spills observed. Dewatering operation is running, water going into settling basin is clear. No plumes observed downstream. Approved.
|
General Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP on footings. Washout on site between green belt and warm springs ave. Water leaving site is cleaner than groundwater reaching surface. Excavating and hauling away fill dirt, no trackout issues.
|
Random Inspection | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Michael Zawacki
|
|
|
Working on installation of footings. Dewatering still in process. Spring turbity is 1.92 NTU, after pumping and treatment return water is 12.9 NTU
|
General Inspection | 11/20/2017 | 11/20/2017 | 11/20/2017 | A | PASS |
Michael Zawacki
|
|
|
dewatering check up. No work today. Pumps are turned off and hole is flooded.
|
General Inspection | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Michael Zawacki
|
|
|
Getting second pump set.
|
General Inspection | 11/13/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Michael Zawacki
|
|
|
Dewatering in process. Coming out and pooling behind silt fence. Water is absorbing into ground into marsh. Didn't see any running surface water further down stream. Zane said they will sweep trackout up.
|
General Inspection | 11/9/2017 | 11/9/2017 | 11/9/2017 | A | PEND |
Michael Zawacki
|
|
|
check on dewatering Containment built. Wells not dug and no pumps yet in place.
|
Site Preparation | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PEND |
Andy J. Long
|
|
|
check on dewatering plan setup dewatering not yet commenced. Materials for settling chamber are now on site. Syman Co. installing perimeter controls.
Note:
Need to have BPR and Brighton remove old silt fence along Walling Creek downstream from bridge site.
Will check back later today or tomorrow AM to confirm water treatment. There is some backed up water in Creek about 100 M downstream
|
Site Preparation | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PEND |
Michael Zawacki
|
|
|
Road closure set. No BMPs or staging.
|