2nd - 5th floor Dwellings per NFPA 13 2016. Residential sprinklers. Floor controls. All attics filled with insulation. Previous permit for fire pump, standpipes & 1st floor FIR18-00461. Underground FIR18-00336
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/23/20199/24/20199/24/2019APASS
DetailsJim Page
Final fire sprinkler inspection is complete.

10:30 am pump run Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Final Inspection9/16/20199/19/20199/19/2019APART
DetailsJim Page
Final walkthrough has been performed for levels 2 through 5, no noted items. No fire alarm associated devices has been tested as of this entry, monitoring has not been established.

Final 4th;townhomes Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Final Inspection9/13/20199/16/20199/17/2019ACANC
DetailsTroy Cobbley
Cancel per Jason (job super)
We would like to final 2nd and 3rd floor Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Final Inspection9/12/20199/12/20199/12/2019PCANC
DetailsJim Page
Rescheduled per conversation with point of contact, this request is cancelled.

We want to final off second and third floors and the condos Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro7/16/20197/17/20197/17/2019ADONE
DetailsJim Page
Hydrostatic test for levels 4 and 5 witnessed, no pressure loss observed.

Hydro on 4th;5th floor. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in7/9/20197/10/20197/10/2019PPART
DetailsJim Page
Rough to cover inspection for level 5 corridor north of the fire doors, trash shoot piping and unit 506 complete, areas inspected approved for cover.

Trash shoots ;5th floor Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in6/7/20196/7/20196/7/2019PPART
DetailsJim Page
Rough to cover inspection for the remaining fire sprinkler piping on level 4 complete, level 4 approved for cover. Tenting/rough in inspection for the north level 5 stairwell complete, level 5 stairwell approved for cover.

Rough in 4th floor. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in5/30/20195/30/20195/30/2019PPART
DetailsJim Page
Inspection for overhead fire sprinkler piping above soffits and lowered ceilings in units 507 and 509 complete, approved for cover.

4th;5th floor late afternoon if possible thanks. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in5/30/20195/30/20195/30/2019PCANC
DetailsJim Page
Late afternoon please. Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
INSP-Sprinkler Rough-in5/29/20195/29/20195/29/2019APASS
DetailsTroy Cobbley
Tenting inspection for Unit 506 and the south corridor of the 5th floor in front of the elevator is passed and piping is ok for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in5/23/20195/24/20195/24/2019AFAIL
DetailsJim Page
Tenting in southeast level 5 unit is not complete, tenting was about half complete at time of inspection

Tenting fifth floor. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in5/21/20195/21/20195/21/2019PPART
DetailsJim Page
2nd floor apartments approved for cover, level 5 corridor drop down ceilings, north of the fire doors approved for cover

2nd floor apartments and 4th floor corridor Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in5/14/20195/15/20195/15/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above drop down ceiling in units on level 5, north of fire door complete, rough to cover ispection for level 3 corridor complete, areas noted approved for cover.

5th floor units 3rd floor corridor. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in4/15/20194/15/20194/15/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above soffits/lowered ceilings on level 4 suites off of west corridor complete, suites inspected approved for cover.

4th floor 1st 5 units. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in4/12/20194/12/20194/12/2019PPART
DetailsJim Page
Insualtion that was removed in suites 507 and 509 has been replaced, overhead fire sprinkler piping in rooms suites 507 and 509 approved for cover.

5th floor tenting inspection. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in4/10/20194/10/20194/10/2019PPART
DetailsJim Page
Tenting inspection for corridor that runs north to south on level 5 complete, corrifor approved for cover. Insulation has been removed in rooms 507 and 509, insulation was on floor, cover is not approved for rooms 507 and 509. Not all lowered ceiling heads on level 4 have been cut in, will be inspected at a later date when all soffit/lowered hardlids have been installed.

4th floor rough in,and 5th floor tenting. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in4/6/20194/8/20194/8/2019PPART
DetailsJim Page
Fire sprinkler heads have been added in chases/combustible concealed pockets that have PVC pipe exposed, non-combustible insulation has been provided in spaces that do not have PVC, level 2 combustible concealed spaces approved for cover.

Rough in on 2nd and 3rd floor concealed spaces Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in4/4/20194/4/20194/4/2019APART
DetailsJim Page
Overhead fire sprinkler piping inspection above hardlids/soffits in all rooms to include north side of fire door on level 2 complete, hardlids/soffits in rooms on level 3 complete, areas inspected approved for cover.
INSP-Sprinkler Rough-in4/3/20194/4/20194/4/2019AFAIL
DetailsJim Page
Numerous pockets throughout level 5 corridor and remaining rooms that do not meet the requirements of filling attic space with non-combustible insulation.

5th floor tenting ;2nd floor rough in. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in4/1/20194/1/20194/1/2019PFAIL
DetailsJim Page
Tenting not installed correctly, tenting needs to be over the entire piping to include areas where trusses are crossed. Piping in attic space must be clear between sheetrock and piping, no insulation between sheetrock and piping, areas throughout floor have spots where insulation is installed between piping and sheetrock. No combustible pockets in attic space per NFPA 13, all areas in attic space to be filled with non-combustible insulation as discussed, cover is not approved for remaining units, contact on-site foreman for added detail on proper tenting installation.

still have gaps

Fifth floor tenting inspection. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in3/26/20193/27/20193/27/2019APART
DetailsJim Page
Tenting in rooms 513, 514 and 515 complete, approved for cover.

Need tenting inspection on 5th floor and go through all floors to see what chases need sprinklers Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Conference3/22/20193/26/20193/26/2019PCANC
DetailsJim Page
Rescheduled per conversation with point of contact.

Look at concealed spaces Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in3/25/20193/25/20193/25/2019PCANC
DetailsJim Page
5th floor tenting. Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
INSP-Conference3/20/20193/21/20193/21/2019ADONE
DetailsJim Page
Fire conference complete. Installing contractor and designer had a discussion with Tim Frost over the small soffit areas in corridors, based on the information provided heads will not be required in the small soffits above the suite entries in the corridor, corridor protection (provided the sprinkler heads are installed center of corridor) is sufficient.

Questions on 2 nd floor Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in3/19/20193/20/20193/20/2019PPASS
DetailsTroy Cobbley
Piping above soffits in units 209, 211, 212, 213, 214, 215 and Corridor 2 is ok for cover.

Rough in for second floor Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in3/19/20193/19/20193/19/2019PFAIL
DetailsJim Page
Expoosed wood in soffit of room 214, cover combustible material or provide sprinkler coverege. Holes in sheetrock above hardlids needs to be patch or provide upright protection for coverage. Finish heads are installed above hat channel in room 209, remove hat channel or lower heads for proper coverage.

Second floor soffits Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Conference3/13/20193/15/20193/15/2019ADONE
DetailsJim Page
Fire conference complete, Concealed combustible spaces need to meet the requirements of the 2016 NFPA 13, section 8.15.1.2

Need to talk about concealed chases and soffits can we do 8:00am? Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in3/11/20193/12/20193/12/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on 4 complete, level 4 approved for cover. Rough in inspection for level 5 complete, cover is not approved until tenting is installed and inspected, no cover is approved for level 5.

Rough-in for 4th and 5th floors Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in3/8/20193/8/20193/8/2019PFAIL
DetailsJim Page
Cover material was installed on 4 before cover inspection was completed, it has already been mentioned (Noted on 17DEC2018 inspection and 25JAN2019 inspection) on other areas of this project that cover inspection has to be performed before cover is approved. All cover material over piping needs to be removed. Numerous heads are blocked in parking garage due to sewer drain modifications, head coverage will need to be corrected in parking garage to be code compliant.

4th;5th floor. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro1/29/20191/30/20191/30/2019ACANC
DetailsJim Page
Hydro static test for third floor. Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
INSP-Sprinkler Rough-in/Hydro1/28/20191/29/20191/29/2019APART
DetailsJim Page
Rough to cover inspection for levels 2 and 3 complete, approved for cover.

Third floor hydro. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro1/28/20191/28/20191/28/2019PPART
DetailsJim Page
Hydrostatic test for level 2 overehad fire sprinkler piping witnessed, no pressure loss observed. No rough to cover ispection was perfromed due to time constraints.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in1/24/20191/25/20191/25/2019APART
DetailsJim Page
Inspection turned into a conference, cover material that was installed before piping was inspected needs to be removed, un-interuptable heat needs to be established before water is introduced to the fire sprinkler system, once water is on then temperature of all areas effected will need to be 40 degrees or above, if temperature falls below 40 degrees in areas that piping has been made wet then a re-hydro will be required.

Third floor rough in. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in1/24/20191/24/20191/24/2019PCANC
DetailsTroy Cobbley
Rescheduled for tomorrow morning.

Third floor rough in. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in1/24/20191/24/20191/24/2019PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
INSP-Sprinkler Rough-in12/21/201812/26/201812/26/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting in townhomes complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in12/19/201812/20/201812/20/2018ACANC
DetailsTroy Cobbley
Cancel per Brian

Town homes Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in12/17/201812/17/201812/17/2018PFAIL
DetailsJim Page
Cover material installed before tenting inspection was performed in townhomes, cover material needs to be removed for inspection, cover is not approved.

Tenting inspection for town homes. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in12/11/201812/12/201812/12/2018APART
DetailsJim Page
No fire sprinklers required under garage exhaust ducting.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Conference12/11/201812/11/201812/11/2018PCANC
DetailsJim Page
Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro12/5/201812/5/201812/5/2018PDONE
DetailsJim Page
Hydrostatic test for townhomes witnessed, no pressure loss observed. Noted, now that water has been intruduced to the fire sprinkler system the internal building temperature of the effected areas needs to be maintained at 40 degree or above, if areas drop below 40 degrees then a re-hydro will be required.

Hydro on the town homes. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in12/3/201812/3/201812/3/2018PPART
DetailsAdele J Schaffeld-Griffin
approved the okay cover for the pre rock in the hallway on level 2, less the sidewalls to the stair enclosures. 2nd floor hallway to cover, Phone #: ###-#### >> Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in11/8/201811/8/201811/8/2018PPART
DetailsJim Page
Rough in inspection for townhome section complete, need to verify what is going to be done in high roof areas, is combustible concealed space going to be filled with non-combustible insulation or is upright protection going to be required. Need to add sprinkler protection in pipe chase or fill with non-combustible insulation.

Phone #: ###-#### Inspection requested via web by Sam Ball