Permit Information
Permit NumberESC15-00306
StatusFinaled
Name OLIVIA WEICK
Site Address 625 N WHITEWATER PARK BLVD
Project NameEsther Simplot Park Project
Customer Number 
ePlanReviewNo
Description
Grading permit to excavate, grade and compact site earth materials in preparation for a new Esther Simplot Park project, project to consist of Ponds, several trails, pathways, THIS GRADING PERMIT DOES NOT INCLUDE BUILDINGS OR STRUCTURES.. All work to be performed as approved by the Public Works Deptartment and Planning & Zoning Department. Underground utilites only. No buildings, or footings to be constructed under this permit. Activity will include initial site clearing activities including tree and debris stockpile removal, security fence installation, and ESC BMP installation to begin prior to completion grading permit application. Area disturbance is 35 acres, total site area. Future permits for next phases will reference this permit but may require ESC plan/SWPPP submittal to gain approval. BMPs include silt fence perimter, construction entrance (tracking pad), and designated storage area. See ESC15-00019 for related canal culvert project.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/26/20189/26/20189/26/2018APASS
DetailsAndy J. Long
First phase of ESP and Whitewater Park are complete. Second phase now in progress, see ESC18-01121 for coverage and ESC inspections. No further inspections on this permit, no corrective actions outstanding, ESC permit conditions satisfied.
General Inspection9/26/20189/26/20189/26/2018 CANC
DetailsAndy J. Long
General Inspection9/11/20189/11/20189/11/2018 PASS
DetailsMichael Zawacki
Starting to install BMPs and site prep for next phase. Will call in for thorough walkthrough when everything installed and ready.
General Inspection8/27/20188/27/20189/4/2018APEND
DetailsAndy J. Long
site being prepped for next phase of project, which will be permitted seperately. Will verify that any old netting no longer functioning as an ESC BMP has been removed during Site Preparation walk through. New phase to be covered under ESC18-01121
General Inspection8/20/20188/24/20188/27/2018ACANC
DetailsAndy J. Long
General Inspection8/20/20188/20/20188/20/2018 CANC
DetailsAndy J. Long
rescheduled
General Inspection8/3/20188/3/20188/6/2018 CANC
DetailsMichael Zawacki
Complaint Inspection7/19/20187/19/20187/19/2018ADONE
DetailsAndy J. Long
Complaint regarding erosion control blanket netting causing potential damage to wildlife.

All river bank repairs areas from Whitewater Park to VMP were inspected, There are some BMPs that need removal or maintenance:

- remove black netting layer (top layer) of ECB. Many sections have become detached from staples but has not degraded as much as the straw or the green layer.
- remove or repair damaged sections of silt fence (near Farmers Union canal intake, near VMP)
- clean up loose trash and construction debris visible along side the WWP construction entrance.
General Inspection7/17/20187/17/20187/19/2018PPEND
DetailsAndy J. Long
check for temp BMPs that need removing and/or maintenance.
General Inspection7/5/20187/5/20187/6/2018 CANC
DetailsAndy J. Long
General Inspection6/20/20186/20/20186/20/2018 PART
DetailsMichael Zawacki
No ongoing work. ACHD has retention pond/seepage bed fenced off along side WWP Blvd.
General Inspection6/5/20186/5/20186/5/2018 PASS
DetailsMichael Zawacki
Currently no activity.
General Inspection5/21/20185/21/20185/22/2018 PASS
DetailsMichael Zawacki
No new work. Bathroom complete, permit finalled.
General Inspection5/4/20185/4/20185/4/2018 PASS
DetailsMichael Zawacki
Restroom project complete and landscaping done. Green belt repai completed, access to staging area gate is locked. Still silt fence at canal access and super sacks in old storage yard. ACHD still working with retention pond in front alon WWP Blvd.
General Inspection4/19/20184/19/20184/19/2018 PASS
DetailsMichael Zawacki
Greenbelt and restroom projects complete. ACHD is on site working on retention pond.
General Inspection4/4/20184/4/20184/6/2018 PASS
DetailsMichael Zawacki
Work is complete and stabalization measures are in. BMPs have been removed from areas that were in flood plain. All workers and equipment have been removed from site. Greenbelt is still closed from Veterans Park to Simplot Park.
Complaint Inspection3/20/20183/20/20183/20/2018PDONE
DetailsAndy J. Long
complaint about track out from Whitewater Park/Esther Simplot Park

ACHD cleaning up pond. Will be responsible for any trackout. Only minor trackout observed.
General Inspection3/9/20183/9/20183/9/2018 PASS
DetailsMichael Zawacki
Prepping area for hydroseed and tackifier. Most work complete. Area is clean, bmps in place and maintained. Path is open under Veterans Pkwy leading into Veterans Park.
General Inspection2/22/20182/22/20182/26/2018 PASS
DetailsMichael Zawacki
No workers on site, parks dept unlocked gate so I could inspect. Greenbelt is now open under Veterans as well as veterans access. BMPs are still installed in areas where they are working. Concrete has been poured on east side of pedestrian bridge and a heater is blowing under the blankets.
General Inspection2/7/20182/7/20182/7/2018 PASS
DetailsMichael Zawacki
WIP on concrete greenbelt. BMPs in place and maintained. Shore armoring almost complete. Geojute being installed on slopes. Willows have been planted. No issues on site.
General Inspection1/23/20181/23/20181/23/2018PPASS
DetailsMichael Zawacki
No work in river. Most riprap installed and willows planted. Working on final stabalization on banks. Path work in process, installing 12' wide path made of concrete. Installing conduit along path as well. Some trackout into parking lot, a sweeper is on order. Areas have been seeded and are fenced off and covered with an ECB.
General Inspection1/5/20181/9/20181/9/2018APASS
DetailsMichael Zawacki
Scope of work has been expanded. More asphalt is being removed and replaced with concrete. BMPs will be installed as they go since activity is linear. Most rip rap work completed and not much if any in water work remaining. Site is well maintained and a crew is onsite taking care of BMPs at all time.
General Inspection1/5/20181/5/20181/5/2018 CANC
DetailsAndy J. Long
General Inspection12/21/201712/21/201712/22/2017 PASS
DetailsMichael Zawacki
Did site walk through. BMPs installed. No turbity in river, no dirt leaving site. Contractor was driving pilons for reinforcement. Area of greenbelt ready for concrete. Shore armoring completed in sections.
General Inspection12/6/201712/6/201712/7/2017 PASS
DetailsMichael Zawacki
WIP and moving at a quick rate. Contractor is monitoring and recording turbity readings. No plumes or areas of concern where noted during inspection. Site is well maintained.
General Inspection11/16/201711/21/201711/21/2017APASS
DetailsAndy J. Long
In channel work for river bank repairs has started. Turbidimeter provided to monitor turbidity downstream from work areas and to test any visible plumes. Will use to document 404 monitoring requirements.

Meter provided yesterday 11/20 and setup by Inspector Zawacki.

Permit info posted, site has multiple RPs on duty.
Site Preparation11/15/201711/16/201711/16/2017APASS
DetailsAndy J. Long
9:30 walk through of BMPs for river bank repairs.

Site inspection and SWPPP binder review completed with McMillen project team, RP on permit Olivia W. coordinated conference/inspection.

Superintendant on site is Ralph Behrens. Multiple river bank repair sites between ESP and Veteran's Mem. Parkway (VMP).

BMPs include:
-Heavy duty rock construction entrances installed at both access points (Esther Simplot Park (ESP) and Stilson off VMP)
- Sediment control wattles and silt fence installed properly at low points and sensitive boundaries of each repair zone.
- Site to be inspected daily by onsite crew and also frequently by office staff.
- Stockpile areas and construction access routes have been designated to prevent excess disturbance or increase potential risk of sediment runoff from stockpiles during rain events.
- Permit signage posted at each end of project. SWPPP info located at entrance in ESP.

- significant earthwork to begin next week. Follow up inspection scheduled.

Approved for construction, BMPs approved.
General Inspection11/7/201711/7/201711/7/2017 PEND
DetailsAndy J. Long
new river repairs and project submittals are in development by Parks and Rec
General Inspection10/23/201710/23/201710/23/2017 PEND
DetailsAndy J. Long
General Inspection10/6/201710/6/201710/10/2017 CANC
DetailsAndy J. Long
General Inspection9/21/20179/21/20179/22/2017 CANC
DetailsAndy J. Long
General Inspection9/6/20179/6/20179/8/2017 CANC
DetailsAndy J. Long
General Inspection8/22/20178/22/20178/22/2017 CANC
DetailsAndy J. Long
no activity, project open for pending river bank repairs and prep for next phase.
General Inspection8/7/20178/7/20178/8/2017 CANC
DetailsAndy J. Long
General Inspection7/21/20177/21/20177/21/2017 CANC
DetailsAndy J. Long
General Inspection7/6/20177/6/20177/6/2017 CANC
DetailsAndy J. Long
General Inspection6/21/20176/21/20176/21/2017 CANC
DetailsAndy J. Long
General Inspection6/6/20176/6/20176/6/2017 CANC
DetailsAndy J. Long
General Inspection5/22/20175/22/20175/22/2017 PASS
DetailsAndy J. Long
No construction activity at this time. The area adjacent to river that is not yet complete is currently under water.
General Inspection5/5/20175/5/20175/5/2017 CANC
DetailsMelissa Jannusch
General Inspection4/20/20174/20/20174/20/2017 CANC
DetailsAndy J. Long
General Inspection4/5/20174/5/20174/5/2017 PASS
DetailsAndy J. Long
No construction activity. Disturbead area in between park and river bank is currently under water due to high river flows. Revegetating area next to Quinn's Pond outlet is blocked off and covered with straw to protect bare soil. No corrections, no ESC issues observed.
General Inspection3/21/20173/21/20173/21/2017 PASS
DetailsMelissa Jannusch
Project is inactive. Staging area is clean. No ESC issues observed
General Inspection3/6/20173/6/20173/6/2017 PASS
DetailsAndy J. Long
No construction activity occuring. Unfinished area along river bank currently submerged due to high river levels.
General Inspection2/17/20172/17/20172/21/2017 CANC
DetailsMelissa Jannusch
General Inspection2/2/20172/2/20172/6/2017 CANC
DetailsAndy J. Long
General Inspection1/3/20171/3/20171/4/2017 CANC
DetailsAndy J. Long
General Inspection12/19/201612/19/201612/19/2016 CANC
DetailsAndy J. Long
General Inspection12/2/201612/2/201612/2/2016 PASS
DetailsAndy J. Long
Conference11/17/201611/17/201611/17/2016ADONE
DetailsAndy J. Long
Conference with park developers regarding next phase of Whitewater Park conducted 11/16.

Project tentatively set to begin October 2017. Seperate ESC permits and SWPPP to be submitted.

All construction of Esther Simplot Park is complete. This ESC permit to remain open to monitor the unfinished area between parking lot, River and canal intake structure. Area may require additional stabilization or ground cover but currently is compacted earth and river rock. Hydroseeding did not establish. Water could potentially flow out of this area by the intake structure, currently a sediment control wattle has been installed.

No other corrections needed, all temporary BMPs have been removed and other disturbed areas stabilized.
General Inspection11/8/201611/8/201611/8/2016 CANC
DetailsAndy J. Long
General Inspection10/24/201610/24/201610/25/2016 CANC
DetailsAndy J. Long
General Inspection10/7/201610/7/201610/7/2016 CANC
DetailsAndy J. Long
revegetaton. Park construction complete. No inspection.
General Inspection9/22/20169/22/20169/22/2016 CANC
DetailsAndy J. Long
General Inspection9/7/20169/7/20169/7/2016 CANC
DetailsAndy J. Long
No inspeciton, site is in revegetation phase. No new associated projects or earth disturbances.
General Inspection8/23/20168/23/20168/23/2016 PEND
DetailsEvan Jenkins
nealy fully re-vegetated
General Inspection8/8/20168/8/20168/8/2016 CANC
DetailsAndy J. Long
General Inspection7/22/20167/22/20167/22/2016 PASS
DetailsEvan Jenkins
re-vegetation of all disturbed areas in progress. Construction is now complete minus landscaping. No ESC issues observed
General Inspection7/7/20167/7/20167/7/2016 PASS
DetailsAndy J. Long
Vegetation/stabilization in process. Temp BMPs installed in certain phases. No violations. All significant earthwork for park is complete
General Inspection6/22/20166/22/20166/22/2016 PASS
DetailsEvan Jenkins
General Inspection6/7/20166/7/20166/7/2016 PASS
DetailsAndy J. Long
WIP on final landscaping and park features. Ponds filling with water. Quinn's Pond beach park open to public. No trackout, discharges, or fugitive dust observed. DI bags on WW Blvd still installed, trackout controls removed since access roads are now paved.
General Inspection5/20/20165/23/20165/23/2016PPASS
DetailsEvan Jenkins
Park in progress and near completion. Site is in good shape with no trackout or discharges observed.
General Inspection5/18/20165/18/20165/20/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection4/29/20165/3/20165/4/2016APASS
DetailsEvan Jenkins
Work continues on site improvements. Site is in good shape with no ESC issues observed at time of inspection
General Inspection4/29/20164/29/20164/29/2016 CANC
DetailsAndy J. Long
rescheduled for tuesday 5/3
General Inspection4/14/20164/14/20164/14/2016 PASS
DetailsEvan Jenkins
Work continues. Some interior roads have been paved. The bridge that connects pond to Boise River has been poured and final touches are being performed. No ESC conditions identified
General Inspection3/30/20163/30/20163/30/2016 PASS
DetailsEvan Jenkins
WIP: no issues observed. Site is in good shape
General Inspection3/11/20163/15/20163/18/2016PPASS
DetailsEvan Jenkins
General Inspection3/10/20163/10/20163/11/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection2/24/20162/24/20162/24/2016 PASS
DetailsEvan Jenkins
WIP: no discharges leaving site. BMP's are all in good shape at time of inspection.
General Inspection2/9/20162/9/20162/10/2016 PASS
DetailsEvan Jenkins
Site is in good shape. One issue occured yesterday 2-9-16 on the Head Gate (Canal) Portion of the project. A turbid discharge had occured when they opened the headgates to ensure they are in proper working order. Olivia (RP) stated via phone they had performed Turbidity measurements. They didn't exceed the 50 NTU's above background, plus they are covered under their 404 Permit. No issues at this time
General Inspection1/25/20161/25/20161/25/2016 PASS
DetailsEvan Jenkins
General Inspection1/7/20161/7/20161/7/2016 PASS
DetailsEvan Jenkins
No activity at this time
General Inspection12/22/201512/23/201512/23/2015APASS
DetailsAndy J. Long
No activity at site. No changes to overall site dewatering set up.

No trackout, no issues with perimeter sediment controls. Approved.
General Inspection12/22/201512/22/201512/22/2015 CANC
DetailsAndy J. Long
rescheduled
Complaint Inspection12/7/201512/7/201512/7/2015APART
DetailsEvan Jenkins
Track out Complaint Around Round-a-Bout

Did not visually see trackout. Contacted RP Olivia and disclosed McMillen needs to "redo" their construction Exit. Completely filled in with sediment. Will follow Up tomorrow. No Activity at time of inspection
General Inspection11/26/201511/26/201511/27/2015 PASS
DetailsAndy J. Long
No activity at time of inspection. Site perimeter is in good condition. See also ESC15-00019 for canal intake portion of projecct. No changes reported to operations. No trackout or discharges observed. Approved.
General Inspection11/11/201511/11/201511/12/2015 PASS
DetailsEvan Jenkins
WIP on interior only. No hauling nor trackout occuring.
Complaint Inspection10/27/201510/27/201510/28/2015PPASS
DetailsAndy J. Long
Plume reported in Boise River Tuesday 10/27. Site inspection conducted at 4 PM. Investigated site with SWPPP coordinator for McMillen- Jacobs ACHD SWPPP Inspector.

Leak from river was going through cofferdam structure blocking off area of box culvert location, filling the area of work with water. To stop the leak the exterior lining on the dam was extended and more earth material added to the dam, which caused some turbid discharges of sediment down river during the activity. Turbidity was meaurred and is reported in the SWPPP daily report. SWPPP coordinator stated the turbidity did not reach reportable levels.


Inspection of the area of concern did not reveal any active plumes into Boise River and no BMP failures were identified. The rest of the site is in good condition, trackout and perimeter controls are working well. Dewatering system is still treating water passing through site and ground water being pumped.

No corrections. Site has fixed problem and has reported the corrective action.
General Inspection10/23/201510/23/201510/23/2015 PASS
DetailsEvan Jenkins
WIP: No hauling offsite at this time, all work occuring internally. BMP's and permits still posted. no Dust occuring or any other ESC issues observed.
General Inspection10/2/201510/5/201510/5/2015PPASS
DetailsEvan Jenkins
WIP: Street Sweeper in progress. Water truck currently watering disturbed areas to reduce any potential dust issues. No issues/violations observed during inspection
General Inspection10/2/201510/2/201510/2/2015 CANC
DetailsAndy J. Long
rescheduled for Monday
General Inspection9/17/20159/17/20159/17/2015 PASS
DetailsEvan Jenkins
WIP: Some minor hauling taking place, street sweeper currently sweeping. No ESC issues observed at this time
Complaint Inspection8/28/20158/28/20158/28/2015PPART
DetailsEvan Jenkins
Dust/Trackout onto White Water BLVD

--Contacted Olivia via phone to disclose complaint, and too hire a sweeping service and have same sweeping schedual as before (3 times per day) and also water down the road. She is on it making phone calls getting issues taken care of. Will follow up
General Inspection8/20/20158/20/20158/20/2015PPASS
DetailsAndy J. Long
ESC walk-through at Esther Simplot 2:30 PM with Olivia Weick (SWPPP coordinator) and Andrew Pharis (project manager) with McMillen Jacobs.

Checked SWPPP inspection log and turbidity sampling. Inspections and monitoring conducted daily. Records kept in binders in office. Additional monitoring requirements for water quality are tested monthly for contaminents per DEQ and EPA.

Site is currently excavating and hauling off contaminated material. Material being taken to Ada County Landfill for disposal.

SIte perimeter control of silt fence and chainlink is in good condition. Some repairs have occurred since installation as needed. Whitewater Blvd DIs have sediment bags, sweeping conducted 2x daily and stabilized construction entrance with rumble bars is installed for trackout control.

Dewatering is active at about 3500 gpm. Ground water discharges into settling troph with wier dams and oil boom rolls to remove slight sheen (from pond scum and possibly oil-based contaminants). Water then discharges into the final pond. Discharge area is surrounded by a turbidity curtain and boom. Turbidity measurements are in compliance.

Dust control is also continuous with multiple water trucks circling site and focusing on the haul road route. No signtiificant dust issues observed during inspection.

Site is in good conditions. No complaints received by ESC division in many months. Paperwork and SWPPP oversight is very professionally done.

Approved. No corrective actions issued.
General Inspection8/13/20158/18/20158/18/2015PPASS
DetailsAndy J. Long
Perimeter and trackout controls are being utilized. Some minor trackout should be swept up during the regularly scheduled street sweeping. No fugitive issues observed. WIP on digging new pond and removing unsuitable material.
Aging Inspection8/13/20158/13/20158/13/2015 CANC
DetailsAndy J. Long
Complaint Inspection5/6/20155/6/20155/6/2015APASS
DetailsEvan Jenkins
Complaint called in from Boise PW: contactor called and stated from excavating sand, sand entered a nearby Drop Inlet and it plugged, causing back up

Cause: United water flushed a nearby Fire Hydrant into the MS4 causing the Stormwater Pond inside the Park to Flood causeing minor Erosion. Not contractors fault. ACHD needs to contact United Water To WARN them about flushing in area, which will cause flooding inside the park
Conference4/21/20154/21/20154/21/2015PPASS
DetailsEvan Jenkins
Discuss Dirt Hauling Complaints: Cover Dump Trucks Hauling Dirt out of site

Discussed with Olivia, and both site supervisors plus Luke Roberts with ACHD to discuss covering the haul trucks. All trucks that DO have covers, have been covering their loads, and I visually watched 6 trucks covering up their loads onsite prior to exiting the site. I encouraged the group, for those haul trucks w/out covers, to load them lighter, to keep the amount of possible sediment exiting the haul truck. The soils they are hauling are very moist, by watering down with water truck prior to excavating out into the trucks. No ESC issues. Will continue to monitor
General Inspection4/14/20154/15/20154/16/2015PPASS
DetailsAndy J. Long
No trackout onto Whitewater. Site perimeter and construction entrance BMP in good condition. No site walk through at this time.
General Inspection4/13/20154/14/20154/14/2015PCANC
DetailsAndy J. Long
General Inspection4/13/20154/13/20154/13/2015PCANC
DetailsAndy J. Long
rescheduled for 4/14
General Inspection1/18/20171/18/2017   
DetailsMelissa Jannusch