General Inspection | 9/24/2018 | 9/24/2018 | 9/24/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 9/7/2018 | 9/7/2018 | 9/7/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2018 | 8/23/2018 | 8/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/8/2018 | 8/8/2018 | 8/9/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/24/2018 | 7/24/2018 | 7/25/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/25/2018 | 7/9/2018 | 7/9/2018 | A | PEND |
Andy J. Long
|
|
|
|
General Inspection | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | PASS |
Andy J. Long
|
|
|
Exterior construction and landscaping is now complete. Sand window drainage added at site entrance as requested.
Flexterra hydroseed with tackifier has been applied to the steeper portions of the bank between access drive and fence line of homes to the south.
Construction trash and debris has been cleaned up.
Will keep permit open for monitoring vegetation. PW bond is up for review/expiration in July.
|
General Inspection | 6/11/2018 | 6/11/2018 | 6/11/2018 | | PASS |
Andy J. Long
|
|
|
Inspection Friday 6/8 PM.
WIP on shoulder and sidewalk at the access drive. Access drive is paved and storm drain system hooked up. Landscaping the bank between retaining wall and fence of existing homes below.
They are still using bark and shrubberies, not grasses as Public Works had ordered. There is a sediment control wattle along the toe of the slope at the fence as well as some drain rock in several areas.
No erosion or runoff issues observed.
|
General Inspection | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PEND |
Andy J. Long
|
|
|
follow up on corrections
WIP on landscaping and preping for driveway paving.
-Gutter down spouts have been connected to seepage bed. - drainage/interception ditch has been removed. - wattle staked in at toe of slope
Correction request: - trench in wattles lined up on slope next to driveway entrance - install wattle on east side to prevent runoff to street below.
|
Conference | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PEND |
Andy J. Long
|
|
|
8 AM
Site walk through with project superintendant Ed. Site engineer and PW engineer also conducted site inspection. Documentation of the seepage bed inspection and installation is required by PW before site final and bond is returned. Investigating location of common driveway and steepness of slope. Will need survey conducted. Request to change vegetation plan to include deep rooted grass to hold slope together and intercept rainfall. New sand window will be installed at entrance on Warm Springs to prevent water from road flowing to subdivsion storm drain system.
Site has dug a ditch to capture runoff from slope. Slope has been covered with mulch. Straw wattle installed between ditch and fence line.
Correction request to install wattle at east end of townhomes to slow runoff and capture sediment to prevent discharge to Gray Eagle Street down below.
|
General Inspection | 5/22/2018 | 5/22/2018 | 5/22/2018 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
Complaint Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PEND |
Andy J. Long
|
|
|
Silt fence along bottom of slope below common driveway was removed last week for landscaping. Site was left at risk and some sediment runoff occured to backyards below.
Landscaping on this slope and driveway paving is to be completed this week. Project manager ED with Perryman will Install sediment control wattle at bottom of slope in addtion to the rock line intercepting channel that will be below the landscaping.
Perryman is working with homeowner to repair damage to yard and remove any accumulated mud & sediment.
|
General Inspection | 5/18/2018 | 5/18/2018 | 5/21/2018 | | PASS |
Michael Zawacki
|
|
|
No trackout or runoff issues. Truck on site delivering top soil.
|
General Inspection | 5/3/2018 | 5/3/2018 | 5/7/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/18/2018 | 4/18/2018 | 4/18/2018 | | PASS |
Michael Zawacki
|
|
|
Entryway sidewalks complete. No trackout from site.
|
General Inspection | 4/3/2018 | 4/3/2018 | 4/6/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/19/2018 | 3/19/2018 | 3/20/2018 | | PASS |
Andy J. Long
|
|
|
No trackout onto Warm Springs. Trash picked up around site. Common driveway not yet paved, no landscaping. Will continue to monitor. Request to check for trash blown down road next inspection and before site final.
|
General Inspection | 3/2/2018 | 3/2/2018 | 3/2/2018 | | FAIL |
Michael Zawacki
|
|
|
No RP on site, contact at site has never been updated and still has someone listed who isn't part of project. Lots of trash and building waste laying all over site, dumpster on site that isn't being used. Rear is mud, no entrance into area and someone parked in mud now.
|
General Inspection | 2/15/2018 | 2/15/2018 | 2/15/2018 | | PASS |
Michael Zawacki
|
|
|
No trackout to Warm Springs.
|
Complaint Inspection | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | CANC |
Michael Zawacki
|
|
|
New site contact: Preston Ziegler, Sawtooth Construction
###-####
|
General Inspection | 1/26/2018 | 1/29/2018 | 1/30/2018 | A | FAIL |
Andy J. Long
|
|
|
Listed RP no longer on duty at site.
Corrections needed: - construction entrance - trash pick up - clean up employee parking area - contain stucco debris and washout
|
General Inspection | 1/22/2018 | 1/22/2018 | 1/26/2018 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/18/2018 | 1/18/2018 | 1/22/2018 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/16/2018 | 1/16/2018 | 1/16/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/1/2018 | 1/1/2018 | 1/2/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on framing, interiors, and exteriors. No issues observed.
|
General Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/30/2017 | 11/30/2017 | 11/30/2017 | | PASS |
Michael Zawacki
|
|
|
Framing the last of the foundations. Dumpster on site. Will need to monitor if framers clean up their mess. New site managers, asked them to pay attention to trackout and mud now that we are in freeze thaw cycle and will see moisture.
|
General Inspection | 11/15/2017 | 11/15/2017 | 11/15/2017 | | PASS |
Michael Zawacki
|
|
|
WIP. Asked to provide washout for when stucco begins. Site is contained and clean, some dirt on sidewalk I asked for them to clean.
|
General Inspection | 10/31/2017 | 10/31/2017 | 10/31/2017 | | PASS |
Michael Zawacki
|
|
|
Perimeter controls intact. No trackout or loose dirt.
|
General Inspection | 10/16/2017 | 10/16/2017 | 10/16/2017 | | PASS |
Michael Zawacki
|
|
|
Site clean and BMPs intact. Gave them a new permit sign since old one was phaded and torn.
|
General Inspection | 9/29/2017 | 9/29/2017 | 9/29/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/14/2017 | 9/14/2017 | 9/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/30/2017 | 8/30/2017 | 8/31/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/15/2017 | 8/15/2017 | 8/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/28/2017 | 7/31/2017 | 8/2/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/27/2017 | 7/27/2017 | 7/28/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/12/2017 | 7/12/2017 | 7/13/2017 | | PASS |
Andy J. Long
|
|
|
No trackout, fugitive dust, or complaints received about site.
Silt fence is installed below access drive retaining wall. Approved.
|
General Inspection | 6/27/2017 | 6/27/2017 | 6/27/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. No trackout. No dust. Watering stockpile. Trash contained. No corrections.
|
General Inspection | 6/9/2017 | 6/9/2017 | 6/9/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 5/25/2017 | 5/25/2017 | 5/26/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 5/10/2017 | 5/10/2017 | 5/10/2017 | | PASS |
Melissa Jannusch
|
|
|
Excavation WIP. No trackout, trash is contained, worker parking is graveled, sign is posted. No corrections.
|
General Inspection | 4/21/2017 | 4/21/2017 | 4/21/2017 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout. Silt fence installed and in good condition. Vegetation growing well on slope below retaining wall. No corrections requested.
|
General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on sidewalks. Construction entrance ok. No trackout. No corrections
|
General Inspection | 3/6/2017 | 3/21/2017 | 3/22/2017 | A | PASS |
Melissa Jannusch
|
|
|
WIP. Construction entrance and silt fence okay. No corrections requested.
|
General Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 | A | PASS |
Andy J. Long
|
|
|
Site currently inactive to allow drying out. Retaining wall, stormwater facility and sewer installed. No roads or gutters. Silt fence perimeter is containing loose dirt and protecting properties below site. Wire back sitl fence was good choice. Lined concrete washout on site, permit sign posted on job trailer. No trackout or discharges. No corrections at this time.
|
General Inspection | 10/28/2016 | 10/31/2016 | 11/1/2016 | A | PEND |
Andy J. Long
|
|
|
request new construction entrance.
RP to block entrance access and keeep equipment on site until the new stabilized entrance can be connected Warm Springs on west side of site. No significant trackout at time of inspection. RP to notify when new entrance is installed. Silt fence perimeter in good condition.
No other corrections requested.
|
General Inspection | 10/27/2016 | 10/28/2016 | 10/28/2016 | P | PART |
Andy J. Long
|
|
|
Need to re-install construction entrance.
No activity at time of inspection, no crew on site. Silt fence remains installed and in good condition.
Will re-inspect Monday
|
Site Preparation | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | PASS |
Andy J. Long
|
|
|
JD Phone #: ###-####
Yellow ESC permit sign and CGP tracking # posted. Construction entrance installed in addition to existing apron. Silt fence has been installed below entire site to protect the existing homes and surround the retaining wall work area. Large lined concrete washout provied.
Approved for construction. RP Justin will be on site through construction.
|