Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberFIR19-00221
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3075 W CRESCENT RIM DR
Project NameCrescent Rim Building 1
Customer Number 
ePlanReviewYes
Description
New 13R sprinkler system.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/20/20201/21/20201/21/2020APASS
DetailsTroy Cobbley
Permit finaled.


Please contact Tom Smalls for inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Final Inspection1/16/20201/17/20201/17/2020AFAIL
DetailsTroy Cobbley
For a final the test papers are needed and the canopies installed (need rock work) on the exterior dry sidewall sprinkler heads. Also the Life Safety Plan review Comments, note 35, state that Class 1 stand pipes are required. I have a call into plan review to verify an exception has been met.

Please contact Tom Smalls for a final inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in/Hydro1/16/20201/16/20201/16/2020PPASS
DetailsTroy Cobbley
The forward flush passed. Please contact Rick Fry for time of inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in/Hydro1/14/20201/15/20201/15/2020APASS
DetailsTroy Cobbley
The remaining overhead hydro tests have been witnessed. This included the basement, stand pipe feed and the feed to the dry pipe system.

tOM Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro1/13/20201/14/20201/14/2020PPASS
DetailsTroy Cobbley
1st floor overhead piping hydro test witnessed with no pressure loss (North and South Buildings)

Please contact Tom Smalls for inspection time. This inspection is for 1st floor and parking garage. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in/Hydro1/10/20201/13/20201/13/2020APASS
DetailsTroy Cobbley
Hydro of the 2nd and 3rd floors passed.

Please Contact Tom Smalls for inspection time. The inspection is for hydro of the 2nd and 3rd floors. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in1/9/20201/10/20201/10/2020APASS
DetailsTroy Cobbley
**PASS* 1st floor common areas ok to cover. 1st floor units finaled for visual only.***MAS**
tom Phone #: ###-####
INSP-Sprinkler Rough-in1/8/20201/9/20201/9/2020PPASS
DetailsTroy Cobbley
The second floor corridor rough-in passed and piping can be covered. The sprinkler work is complete/finaled in the third floor resident rooms.

Tom Phone #: ###-####
INSP-Sprinkler Rough-in1/7/20201/8/20201/8/2020APASS
DetailsTroy Cobbley
**PASS Ok to cover 3rd floor common areas. MAS** 3rd floor tom Phone #: ###-####
INSP-Sprinkler Rough-in11/26/201911/27/201911/27/2019APASS
DetailsTroy Cobbley
See the city approved plans for three additional rooms where piping has been ok'd to cover.

adam Phone #: ###-####
INSP-Sprinkler Rough-in11/11/201911/12/201911/12/2019APASS
DetailsTroy Cobbley
The sprinkler piping in the first, second and third floor elevator lobby hard lids is ok for cover as marked on the plans.

Please contact Tom Smalls for inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in/Hydro11/4/201911/8/201911/8/2019APART
DetailsTroy Cobbley
hydro dry system witnessed with no pressure loss. I looked at the elevator lobby for the 2nd and 3rd floors and discussed with Tom and Adam about adding a head in the soffit opposite of the elevators. // Rick Phone #: ###-####
INSP-Sprinkler Rough-in10/25/201910/28/201910/28/2019PPASS
DetailsTroy Cobbley
Two more apartments on the first floor are ok for cover on the soffit piping. Todd Phone #: ###-####
INSP-Sprinkler Rough-in10/25/201910/25/201910/25/2019PPART
DetailsJim Page
Rough in inspection for parking garage piping complete.

Tom Phone #: ###-####
Sprinkler Plan Check10/21/2019 10/23/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  10/23/2019 DONE
DetailsMark Stumbaugh
Review time 2 hr
Permit Ready to Issue  10/23/2019 DONE
**plan mod - do not reissue**
CHANGE STATUS TO (ISS)  10/23/2019 DONE
INSP-Sprinkler Rough-in10/21/201910/22/201910/22/2019APASS
DetailsTroy Cobbley
See the city approved plans for an additional apartment on the first floor south building where soffit piping is ok for cover. Tom Phone #: ###-####
INSP-Sprinkler Rough-in10/17/201910/21/201910/21/2019AFAIL
DetailsTroy Cobbley
I left two messages for contact. Was at site but could not even park due to hyster. Do not have time to look site over for the contact. 1st floor - Tom Phone #: ###-####
Plan Modification Accepted  10/21/2019 DONE
DetailsMark Stumbaugh
Plan Modification Accepted  10/18/2019 FAIL
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)10/16/2019 10/18/2019 DONE
DetailsMark Stumbaugh
INSP-Sprinkler Rough-in10/17/201910/17/201910/17/2019PCANC
DetailsTroy Cobbley
WIll need to be rescheduled. Can not make it due to work load and personell shortage. 1st floor- Tom Phone #: ###-####
Plan resubmittals received  10/16/2019 DONE
open as built workflow per Dan at Treasure Valley Fire
INSP-Sprinkler Rough-in10/10/201910/11/201910/11/2019APASS
DetailsTroy Cobbley
Two dry pendant heads for the trash shoot are ok for cover. Tom Phone #: ###-####
INSP-Sprinkler Rough-in10/8/201910/8/201910/8/2019PPASS
DetailsTroy Cobbley
Piping in the soffits of an additional apartment is ok to cover as markedd on the plans. tOM- try to call but Tom will be in the parking garage and mignt noit have reception Phone #: ###-####
INSP-Sprinkler Rough-in10/1/201910/1/201910/1/2019PPASS
DetailsTroy Cobbley
See the city approved plans for the apartment and the third floor corridor where piping is ok for cover.

tOM Phone #: ###-####
INSP-Sprinkler Rough-in9/26/20199/26/20199/26/2019PPASS
DetailsTroy Cobbley
See the city approved plans for three residences where the piping in the soffits is marked ok for cover. I also looked at the 2" piping in the connecting corridor for these rooms. tom Phone #: ###-####
INSP-Sprinkler Rough-in9/13/20199/17/20199/17/2019APASS
DetailsTroy Cobbley
**Above ceiling area 3B ok to cover excluding corridor** MAS**
TOM IS WORKING IN THE PARKING GARAGE AND DOES NOT HAVE CELL SERVICE, PLEASE LOOK FOR HIM, THAKN YOU Tom Phone #: ###-####
INSP-Sprinkler Rough-in9/9/20199/10/20199/10/2019APASS
DetailsTroy Cobbley
See the city approved plans for first floor piping locations that are ok for cover. Tom Phone #: ###-####
INSP-Sprinkler Rough-in8/26/20198/27/20198/27/2019APASS
DetailsTroy Cobbley
See the city approved plans for the other two north ground floor apartments where piping in the soffits is marked ok for cover.

tom Phone #: ###-####
INSP-Sprinkler Rough-in8/22/20198/23/20198/23/2019APASS
DetailsTroy Cobbley
See city plans for the two first floor north apartments where the sprinkler piping in the soffits is ok for cover. Tom Phone #: ###-####
INSP-Conference8/21/20198/21/20198/21/2019PDONE
DetailsTroy Cobbley
Tom and I discussed obstructions in the mechanical closets. He is going to use one of the two exceptions allowed in NFPA 13R chapter 6.
Rick Phone #: ###-####
INSP-Sprinkler Rough-in8/12/20198/12/20198/12/2019PPART
DetailsJim Page
Partial rough to cover inspection for level 2 complete for tenting and soffits, notated city approved drawings with yellow highlighter and red ink areas approved for cover.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in7/30/20197/31/20197/31/2019PPART
DetailsTroy Cobbley
**Unit V only on 2nd floor ok to cover. MAS**
Tom Phone #: ###-####
INSP-Sprinkler Rough-in7/22/20197/22/20197/22/2019PPASS
DetailsTroy Cobbley
Tenting inspection passed for the south half of the third floor. Piping can be covered. Rick Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro6/28/20196/28/20196/28/2019PDONE
DetailsJim Page
24 hour air test for dry system on level 1 witnessed, no pressure loss observed.
INSP-Sprinkler Rough-in6/28/20196/28/20196/28/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in level 1 apartment units and storage area complete, notated city approved drawings areas approved for cover, also notated sprinkler head in east corridor next to storage area that will require some type of freeze protection.

Tom Phone #: ###-####
INSP-Sprinkler Rough-in6/26/20196/26/20196/26/2019APART
DetailsJim Page
Rough in inspection complete for levels 2 and 3 suites complete, notated city approved plans with pink highlighter areas that were inspected. Sprinkler piping in areas inspected that is betewwen conditioned spaces approved for cover, areas requiring tenting not approved for cover until tenting has been inspected and passed.

This an rough inspection for the 3rd and 2nd floor of the South side of the building. Phone #: ###-#### Inspection requested via web by Daniel Buccino
Sprinkler Plan Check6/24/2019 6/25/2019 PASS
DetailsMark Stumbaugh
Inspector see notes on plan
PLANS/APPL TAKEN TO FRONT DESK  6/25/2019 DONE
DetailsMark Stumbaugh
Resubmittal Fee $110.25
Permit Ready to Issue  6/25/2019 DONE
DO NOT ISSUE plan mod #4 approved
CHANGE STATUS TO (ISS)  6/25/2019 DONE
plan mod
Plan assigned to (Stumbaugh)6/20/2019 6/24/2019 DONE
DetailsMark Stumbaugh
4th plan mod
Plan Modification Accepted  6/20/2019 DONE
4th modification on 2nd and 3rd floor south side of complex Dan Buccino
INSP-Sprinkler Rough-in6/18/20196/19/20196/19/2019APASS
DetailsTroy Cobbley
See the city approved plans for the piping ok to cover in the third floor south building lobby. It has been clouded with todays date.

Tom Phone #: ###-####
INSP-Sprinkler Rough-in6/17/20196/18/20196/18/2019PPASS
DetailsTroy Cobbley
Rough-in passed for third floor north side apartment, all piping can be covered in this apartment. See city approved plans for notations.

tom Phone #: ###-####
INSP-Supply line flush6/3/20196/4/20196/4/2019APASS
DetailsTroy Cobbley
The underground supply line flush was witnessed.

Please contact Troy Nelson Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in/Hydro6/3/20196/3/20196/3/2019PPASS
DetailsTroy Cobbley
Underground supply line hydro test witnessed.

Please call Troy Nelson Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Supply line flush6/3/20196/3/20196/3/2019PCANC
DetailsTroy Cobbley
To be rescheduled per Troy.

Please call Troy Nelson Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in5/31/20195/31/20195/31/2019PPASS
DetailsTroy Cobbley
The rough-in cover for 2nd floor North side passed as marked on the approved plans. Main corridor and lobby not complete yet.

. Please contact Tom Smalls. Phone #: ###-#### Inspection requested via web by Daniel Buccino
CHANGE STATUS TO (ISS)  5/31/2019 DONE
Plan resubmittals received  5/31/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)5/31/2019 5/31/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check5/31/2019 5/31/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  5/31/2019 DONE
DetailsMark Stumbaugh
Plan Mod Fee $110.25
Permit Ready to Issue  5/31/2019 DONE
DO NOT ISSUE PERMIT- plan mod
Sprinkler Plan Check5/29/2019 5/30/2019 FAIL
DetailsMark Stumbaugh
Plan resubmittals received  5/29/2019 DONE
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)5/29/2019 5/29/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check5/17/2019 5/20/2019 FAIL
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)5/16/2019 5/17/2019 DONE
DetailsMark Stumbaugh
INSP-Sprinkler Rough-in5/16/20195/16/20195/16/2019PPART
DetailsTroy Cobbley
The existing underground supply piping is 4" instead of 6". Revised hydraulic calculations are required for the overhead system prior to a final sign off. The underground piping is ok for cover.


Please Contact Troy Nelson at ###-####, for time of inspection. This inspection is for underground rough -in. Phone #: ###-#### Inspection requested via web by Daniel Buccino
Plan Modification Accepted  5/16/2019 DONE
Per Dan at Treasure Valley Fire: start plan mod workflow
INSP-Sprinkler Rough-in5/15/20195/15/20195/15/2019PPASS
DetailsTroy Cobbley
See the city approved plans for area marked on the north half of the third floor where tenting is approved and the sprinkler piping can be coverd.

Tom Phone #: ###-####
CHANGE STATUS TO (ISS)  5/10/2019 DONE
Plan resubmittals received  5/8/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)5/8/2019 5/8/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check5/8/2019 5/8/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  5/8/2019 DONE
DetailsMark Stumbaugh
Plan Mod Fee $110.25
Permit Ready to Issue  5/8/2019 DONE
Plan assigned to (Stumbaugh)5/1/2019 5/2/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check5/2/2019 5/2/2019 FAIL
DetailsMark Stumbaugh
Plan Modification Accepted  5/1/2019 DONE
Plan mod requested per Dan at Treasure Valley Fire. Submit 2nd floor as builts
INSP-Sprinkler Rough-in4/29/20194/29/20194/29/2019PPASS
DetailsTroy Cobbley
See the updated city approved plans for locations marked where piping is ok for cover on the first floor. Third floor was only a rough-in since not tenting has been done. The areas included the Suites on the first floor north half of the building and the Suites/Corridor/Lobby of the north half of the third floor.
Sprinkler Plan Check4/26/2019 4/29/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/29/2019 DONE
DetailsMark Stumbaugh
Resubmittal Fee $110.25
Permit Ready to Issue  4/29/2019 DONE
plan mod
CHANGE STATUS TO (ISS)  4/29/2019 DONE
Plan Modification Accepted  4/26/2019 DONE
sending in as built plans
Plan assigned to (Stumbaugh)4/26/2019 4/26/2019 DONE
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)4/17/2019 4/18/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check4/18/2019 4/18/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/18/2019 DONE
DetailsMark Stumbaugh
No Fee
Permit Ready to Issue  4/18/2019 DONE
per MAS no plan mod fees
CHANGE STATUS TO (ISS)  4/18/2019 DONE
as per MAS no plan mod fees
Plan Modification Accepted  4/17/2019 DONE
per Mark Stumbaugh
INSP-Sprinkler Rough-in4/15/20194/15/20194/15/2019PFAIL
DetailsTroy Cobbley
Plan mods are needed for the pipe routing changes and additional fittings. No cover given. Tom Phone #: ###-####
Plan resubmittals received  4/8/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)4/8/2019 4/8/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check4/8/2019 4/8/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/8/2019 DONE
DetailsMark Stumbaugh
Resubmittal Review Fee $110.25
Permit Ready to Issue  4/8/2019 DONE
Issue and Print Permit  4/8/2019 DONE
Sprinkler Plan Check4/3/2019 4/4/2019 FAIL
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/4/2019 DONE
DetailsMark Stumbaugh
Plan resubmittals received  4/3/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)4/3/2019 4/3/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/29/2019 4/1/2019 FAIL
DetailsMark Stumbaugh
See Review Comments
PLANS/APPL TAKEN TO FRONT DESK  4/1/2019 DONE
DetailsMark Stumbaugh
Intake Approval  3/29/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)3/29/2019 3/29/2019 DONE
DetailsMark Stumbaugh
Application received  3/28/2019 DONE
Application submitted via PDS Online on Mar 28 2019 12:02PM