General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Andy J. Long
|
|
|
Site has good vegetatation coverage, no temporary BMPs remaining on site. No active construction and just 3 open lots left (to be permitted seperately upon consruction).
ESC permit finaled, no ESC requests
|
General Inspection | 3/9/2020 | 3/9/2020 | 3/12/2020 | | PART |
Michael Zawacki
|
|
|
Some dirt on roads and sidewalks. Some trash blown of building lots. Homebuilder will be contacted and site inspected ud its own permit.
|
General Inspection | 2/21/2020 | 2/21/2020 | 2/25/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PART |
Michael Zawacki
|
|
|
Some light runoff. No blow outs.
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Michael Zawacki
|
|
|
No issues from rain event. Worst spot is lower new home, crew is rolling concrete blankets and dragging some rocks onto street. Some tire tracks coming off top lot where there is no activity.
|
General Inspection | 1/23/2020 | 1/23/2020 | 1/24/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on two homes. No issues at phase.
|
General Inspection | 1/8/2020 | 1/8/2020 | 1/8/2020 | | PASS |
Michael Zawacki
|
|
|
No esc issues with any of the hackberry north developments.
|
General Inspection | 12/24/2019 | 12/24/2019 | 12/24/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on one home. Were using washout and staying on paved drive. Hillside above has been heavily grazed by horses.
|
General Inspection | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | FAIL |
Michael Zawacki
|
|
|
SWO issued for new home not having permit. Excavator is cleaning up mess and loading up. Builder is aware and needs to call Andy back since warning was issued last week and there was no response.
|
General Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity, no activity on horse grazed hill.
|
General Inspection | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PEND |
Michael Zawacki
|
|
|
Syman truck and skid steer parked at top, no BMPs installed on grazed section yet.
|
General Inspection | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | FAIL |
Andy J. Long
|
|
|
Inspection 11/4
Need to install additional stormwater controls at top of culdesac to handle increased runoff from the grazed area above the culdesac. We had erosion here last year and there is risk of further erosion this year due to the near bare conditions.
Notified RP Scott, he will install additional wattles and assess the area.
|
General Inspection | 11/1/2019 | 11/1/2019 | 11/1/2019 | | PASS |
Michael Zawacki
|
|
|
No new building activity.
|
General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | | PASS |
Michael Zawacki
|
|
|
No new building activity. Landscapers on site and storing material on road.
|
General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity. Talked to project owner, few more lots sold and should see some building soon.
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity. Landscape rocks still stored on road.
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity on any of the lots. Landscapers finishing up on lower home. Some rocks stored on road.
|
General Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | | PASS |
Michael Zawacki
|
|
|
Landscapers have rocks stored on road, in process of landscaping last area of lot. No new homes have begun, no issues with any of the lots.
|
General Inspection | 8/14/2019 | 8/14/2019 | 8/15/2019 | | PASS |
Andy J. Long
|
|
|
No activity. No discharge or sediment runoff. Will need to assess slopes for additional revegetation this fall when Hackberry Ridge is being seeding. No corrections requested at this time.
|
General Inspection | 7/30/2019 | 7/30/2019 | 8/1/2019 | | PASS |
Michael Zawacki
|
|
|
Hillside along Bogus Basin Rd. is sprinklered and greem. All interior lots vegetation is dormant, no new construction activity. Road is clean, no esc issues.
|
General Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | | PASS |
Michael Zawacki
|
|
|
Work on one home. No loose trash, roads and sidewalks clean.
|
General Inspection | 6/28/2019 | 6/28/2019 | 7/1/2019 | | PASS |
Michael Zawacki
|
|
|
One home under construction, has gator guard around perimeter. No ESC issues.
|
General Inspection | 6/13/2019 | 6/13/2019 | 6/13/2019 | | PASS |
Michael Zawacki
|
|
|
Landscaping has begun on upper completed home. Bogus Basin frontage has been mowed, no wind blown trash. Site can use some sweeping but in overall good shape.
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PART |
Michael Zawacki
|
|
|
post rain inspection. Identify lots with most erosion/runoff so we can notify the developer/RP. Message sent to RP. Storm system starting to fill with sediment. Witches hat between homes is full. Watlle has been run over a lot and not working so well. Some sediment run on on road and sidewalks.
|
General Inspection | 5/15/2019 | 5/15/2019 | 5/16/2019 | | PASS |
Andy J. Long
|
|
|
Storm drains are protected. Two SFHs near completion, no other projects started. No new erosion issues observed.
|
General Inspection | 4/30/2019 | 4/30/2019 | 5/2/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/15/2019 | 4/15/2019 | 4/17/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PART |
Michael Zawacki
|
|
|
Runoff from multiple sites going onto sidewalk, none major. Sidewalk is covered in dirt in front of 5025 Corralero, pictures sent to listed RP.
|
Site Preparation | 3/27/2019 | 3/29/2019 | 3/28/2019 | A | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 3/27/2019 | 3/27/2019 | 3/27/2019 | | PEND |
Michael Zawacki
|
|
|
Some rilling coming of lots. Will need to monitor after storm systems. Follow up scheduled for 3/29
|
General Inspection | 3/12/2019 | 3/12/2019 | 3/12/2019 | | PART |
Michael Zawacki
|
|
|
Some wind blown trash needs to be picked up. Sidewalks need to be swept, some dirt on road near homes under construction.
|
General Inspection | 2/21/2019 | 2/21/2019 | 2/26/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Michael Zawacki
|
|
|
Streets and sidewalks clean. No discharged, no dirt leaving active home sites.
|
General Inspection | 2/6/2019 | 2/6/2019 | 2/6/2019 | | PART |
Michael Zawacki
|
|
|
Some mud on roads and sidewalks. Most workers prked on road, few parked in dirt drives causing majority of issues. Looks like site has been swept around entrance and inlets.
|
General Inspection | 1/22/2019 | 1/22/2019 | 1/24/2019 | P | PART |
Michael Zawacki
|
|
|
Major trackout has been cleaned. Some light trackout throughout site. None making it to Bogus Basin Road. Some dirt eroding of building lots onto sidewalk.
|
General Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | | FAIL |
Michael Zawacki
|
|
|
Road covered with trackout. Backfill being hauled to top of site, through mud, no stabalized entrance. Sent picture to RP.
|
General Inspection | 12/28/2018 | 12/28/2018 | 12/28/2018 | | PART |
Michael Zawacki
|
|
|
Some tracking on road in site, nothing going to Bogus Basin Rd. Most hillsides still have snow and are frozen.
|
General Inspection | 12/13/2018 | 12/13/2018 | 12/13/2018 | | PEND |
Michael Zawacki
|
|
|
Hillsides still frozen, unable to determine if BMPs were improved. Some dirt runoff on road.
|
General Inspection | 11/28/2018 | 11/28/2018 | 11/28/2018 | | FAIL |
Michael Zawacki
|
|
|
Lots of dirt has washed onto road. Wattles need to be maintained and BMPs modified as needed.
|
Site Preparation | 11/8/2018 | 11/13/2018 | 11/14/2018 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/7/2018 | 11/7/2018 | 11/8/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled to discuss additional hillside erosion controls
|
General Inspection | 10/23/2018 | 10/23/2018 | 10/25/2018 | | PART |
Michael Zawacki
|
|
|
Some trackout and runoff. No major issues.
|
General Inspection | 10/8/2018 | 10/8/2018 | 10/8/2018 | | PASS |
Michael Zawacki
|
|
|
All BMPS in place. No issues from last rain event.
|
General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 | | PASS |
Andy J. Long
|
|
|
No new issues. Driveways have been fitted with water bars and wattles. Drop inlet sump full of dirt has been cleaned out. No construction of SFHs yet. No corrections at this time.
|
General Inspection | 9/6/2018 | 9/6/2018 | 9/6/2018 | | PASS |
Michael Zawacki
|
|
|
Area is stable. No new activity.
|
General Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 | | PASS |
Michael Zawacki
|
|
|
No work on homes has begun. Storm drains still have a bit of dirt in them.
|
General Inspection | 8/7/2018 | 8/7/2018 | 8/7/2018 | | PASS |
Andy J. Long
|
|
|
No recent activity or changes to site. BMPs installed. May need adjustment once precipitation returns as well as targeted revegetation in some areas that are sparse.
|
General Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Michael Zawacki
|
|
|
No rain events since site walkthrough and BMP repairs.
|
General Inspection | 7/13/2018 | 7/13/2018 | 7/13/2018 | | PASS |
Michael Zawacki
|
|
|
Site clean. Repairs discussed with owner where made.
|
Conference | 6/21/2018 | 6/28/2018 | 6/28/2018 | A | DONE |
Andy J. Long
|
|
|
on site meeting with RP and ESC inspectors
Site walk through completed. RP to address: - runoff from driveways and slopes on east lots - clean up sand and sediment in storm drains - repair drainage channel with rip - repair large gully at end of culdesac
Recomend diverting water away from slopes and to the gutters. Install slope interupting wattles.
Will check back mid July for progress.
|
General Inspection | 6/21/2018 | 6/21/2018 | 6/21/2018 | | FAIL |
Andy J. Long
|
|
|
Hillside erosion on many slopes and some undercutting of sidewalk is occuring in various locations. Some hillside wattles were installed but have been undercut. A storm drain drop inlet sump has filled up with eroded dirt and is covering outlet pipe.
Corrections: - work on plan to install more hillside ESC controls until timing for re-seeding is better later this year. - check that BMPs are installed per ESC site map. Update as needed - regrade driveways where runoff is flowing off sides over steep sparsely vegetated slopes. - have storm drain that is clogged cleaned out.
RP to work on corrective action plan and inspect. On site conference scheduled for 9 AM 6/28, next Thursday. Verbal correction request issued to RP Scott.
|
General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PART |
Michael Zawacki
|
|
|
Some rilling running onto site road. All stormwater contained on site. Water is starting to channel along sidewalk, upper road to lots is starting to undercut from channel. Lots of sediment is on sidewalk and on site.
|
Conference | 5/25/2018 | 5/29/2018 | 5/30/2018 | P | DONE |
Andy J. Long
|
|
|
emailed developer and engineer pictures of the erosion occuring in certain spots in subdivision.
|
General Inspection | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PART |
Michael Zawacki
|
|
|
post rainfall inspection Some rilling starting to form. Most areas with rills are on south east side.
|
Conference | 5/21/2018 | 5/24/2018 | 5/25/2018 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 5/17/2018 | 5/17/2018 | 5/21/2018 | P | PEND |
Andy J. Long
|
|
|
post rainfall inspection
No recent activity. NO sediment accumulated in road; no new slope erosion observed.
No corretive action has been taken on gully that has developed on the slope between the upper section and end of culdesdac. No discharge, but could worsen and increase erosion on this slope Need to install slope stabilization or slope interupting wattles next to rip-rapped channel and drainage structure on the 3rd lot on the right hand side. Rilling and evidence of sediment loss into the drainage structure.
|
Random Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Post rain inspection. Looks like very little rain fell at site. All dry and free of runoff.
|
General Inspection | 5/11/2018 | 5/11/2018 | 5/11/2018 | | PASS |
Michael Zawacki
|
|
|
Growth coming in well on hillsides. No runoff issues. No building has begun.
|
General Inspection | 4/26/2018 | 4/26/2018 | 4/26/2018 | | PART |
Andy J. Long
|
|
|
No active construction. No evidence of offsite discharges.
Two locations have hillside erosion occuring. At the top of the subdivsion, a 4-6 channel has formed. Alerted RP that slope interupting wattles or check dams to slow runoff could prevent further erosion of the hillside.
Correction request to install wattle on driveway just above the stormwater pond and repair erosion occurring on on the sloped bank of the pond.
Hillsides have vegetated with approximately 70% coverage. No SFH construction yet.
|
General Inspection | 4/11/2018 | 4/11/2018 | 4/11/2018 | | PART |
Michael Zawacki
|
|
|
Some rills forming on hillsides, grass is also beginning to grow, will need to monitor stabalization vs erosion. Some sediment on drives of upper lots. Bare driveway access will need wattle or other BMP to slow down runoff and prevent more future rilling. Some rills starting to gorm into retention pond.
|
General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 | | PASS |
Michael Zawacki
|
|
|
No issues after rain event. Some standing water on a few pads.
|
General Inspection | 3/12/2018 | 3/12/2018 | 3/12/2018 | | PASS |
Michael Zawacki
|
|
|
Some grass starting to grow on hillsides. Lots are stable. Some sand is running off a few and into the road. Inlets at bottom of Corralero have no protection, looks like they flow into onsite storm water retention.
|
General Inspection | 2/23/2018 | 2/23/2018 | 2/26/2018 | | PEND |
Andy J. Long
|
|
|
No sediment runoff areas observed. No trackout from sites. Much of site still snow covered. Bermed lots directing runoff away from slopes is working well. Sod has been installed around the entrance. No runoff to Bogus Basin road
|
General Inspection | 2/8/2018 | 2/8/2018 | 2/8/2018 | | PEND |
Andy J. Long
|
|
|
email request to update ESC site map to show actual controls installed, and to install wattles in areas where erosion and sediment runoff is evident.
|
General Inspection | 1/24/2018 | 1/24/2018 | 1/24/2018 | | PASS |
Michael Zawacki
|
|
|
Hillsides holding up well, no rills or erosion issues. Some trackout from lots, no WIP so probably from joyriders. Area along Bogus was muddy and people are driving through.
|
General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Michael Zawacki
|
|
|
Checked during thaw and rain event. Site has held up, no erosion on hill sides or runoff. Road and drives are clean.
|
General Inspection | 12/26/2017 | 12/26/2017 | 12/26/2017 | | PASS |
Michael Zawacki
|
|
|
Site is snow covered.
|
General Inspection | 12/11/2017 | 12/11/2017 | 12/11/2017 | | PASS |
Michael Zawacki
|
|
|
Tackifier and tracking holding up. Some trash/beer cans laying around. Two SUVs showed up to offroad while I was there, saw me and took off. Some light tracking coming from a few lots.
|
General Inspection | 11/24/2017 | 11/24/2017 | 11/24/2017 | | PASS |
Michael Zawacki
|
|
|
No major rilling or erosion after rain event. Tackifioer and hydroseed is holding. Tracking on hillsides is still working. Some dirt on road from vehicles coming onto site.
|
Random Inspection | 11/9/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Andy J. Long
|
|
|
Landscaping/tree planting along BB Road frontage is complete. Slopes have now been hydroseeded and appears to have tacifier mixed in. No perimeter sediment controls or slope interupting wattles installed, but grading and drainage features installed should protect many slopes. Terraced lots are sloped towards road and have berms to divert water away from slopes.
Some hydroseeding on slopes remains. No acitivity at time of inspection.
|
General Inspection | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Michael Zawacki
|
|
|
No runoff after rain event. Landscapers onsite planting trees and installing top soil. Talked to developer, said hydroseeder should be at site by end of week. They are trying to get ACHD to sign off on platt so they can begin with home building.
|
General Inspection | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Michael Zawacki
|
|
|
Hillside tracking is currently working. Some steep areas of concern, will monitor as more weather comes through. No runoff at time.
|
Conference | 9/26/2017 | 9/29/2017 | 9/29/2017 | A | PEND |
Andy J. Long
|
|
|
10 AM
RP/developer reviewed slope stabilization. Next week will set schedule for installation of slope erosion and sediment controls. Currently the plan is to do wattles installed along contours and hydroseeding with a fiber matrix. I notified he should consider erosion control blankets as well.
Plan is to have erosion controls and seeding completed by the end of October or early November.
|
Conference | 9/20/2017 | 9/27/2017 | 9/26/2017 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | PEND |
Andy J. Long
|
|
|
No sediment runoff from site. Street drainage is now installed - work still remaining on retention pond.
Called RP to schedule walk through conference to plan for Fall precipitation; hydroseeding, and slope stabilization.
|
General Inspection | 8/18/2017 | 8/23/2017 | 8/25/2017 | P | PASS |
Andy J. Long
|
|
|
Slopes have been tracked. Checking with developer on next steps for temporary or permanent vegetation.
Curb, gutter, storm drain and utilites have been installed.
No evidence of sediment runoff from site to BB Road No trackout or fugitive dust observed.
|
General Inspection | 8/14/2017 | 8/16/2017 | 8/18/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | PASS |
Andy J. Long
|
|
|
Note: initial inspections for this development were entered under ESC16-01431, which is now Finaled. Remaining inspections will be conducted under this permit, which is attached to hillside GRD permit.
SWPPP binder and ESC permit sign posted on site. SWPPP inspection reports have been completed, currently inspecting every 14 days. No trackout or sediment runoff.
Hillsides has been horizontally tracked and mulch application has been applied. Too hot for revegetation currently,, will check on schedule. No hillside wattles have been installed as indicated on the ESC site plan.
No immediate corrections, need to review hillside erosion controls to be implemented (slope interupting wattles, revegetation)
|