Site Final | 8/7/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Andy J. Long
|
|
|
No temp BMP removal requests. Construciton complete, disturbed area revegetated. No new home construction or activity at site. ESC permit finaled.
|
Site Final | 8/7/2020 | 8/10/2020 | 8/10/2020 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/31/2020 | 7/31/2020 | 8/7/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 7/16/2020 | 7/16/2020 | 7/22/2020 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/1/2020 | 7/1/2020 | 7/1/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/16/2020 | 6/16/2020 | 6/17/2020 | | PASS |
Michael Zawacki
|
|
|
Stable, no blowouts into neighbors lot or down gravel road.
|
General Inspection | 6/1/2020 | 6/1/2020 | 6/1/2020 | | PASS |
Michael Zawacki
|
|
|
No activity, heavy vegetation.
|
General Inspection | 5/15/2020 | 5/15/2020 | 5/15/2020 | | PASS |
Michael Zawacki
|
|
|
No activity, vegetated.
|
General Inspection | 4/30/2020 | 4/30/2020 | 4/30/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/15/2020 | 4/15/2020 | 4/15/2020 | | PASS |
Andy J. Long
|
|
|
No activity at site. Lots are posted for sale. Lots have vegetated. No issues at this time
|
General Inspection | 3/31/2020 | 3/31/2020 | 4/1/2020 | | PASS |
Michael Zawacki
|
|
|
No activity
|
General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 | | PASS |
Michael Zawacki
|
|
|
No activity.
|
General Inspection | 2/13/2020 | 2/13/2020 | 2/14/2020 | | PASS |
Andy J. Long
|
|
|
No activity. No issues observed.
|
General Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 | | PASS |
Michael Zawacki
|
|
|
No activity, no blowout to lots below.
|
General Inspection | 1/14/2020 | 1/14/2020 | 1/14/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/30/2019 | 12/30/2019 | 12/30/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/13/2019 | 12/13/2019 | 12/13/2019 | | PASS |
Michael Zawacki
|
|
|
No activity, no blow outs into neighbors yard.
|
General Inspection | 11/28/2019 | 11/28/2019 | 12/3/2019 | | PASS |
Michael Zawacki
|
|
|
No activity.
|
General Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 10/29/2019 | 10/29/2019 | 10/29/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity.
|
General Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 9/27/2019 | 9/27/2019 | 9/30/2019 | | PASS |
Michael Zawacki
|
|
|
Site is stable, no esc issues. Good growth covering area.
|
General Inspection | 9/12/2019 | 9/12/2019 | 9/12/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity, no issues from rain event.
|
General Inspection | 8/28/2019 | 8/28/2019 | 8/30/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity.
|
General Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity. Lots of growth and coverage on site, mo new rills or blow outs into neighbors yard.
|
General Inspection | 7/29/2019 | 7/29/2019 | 7/29/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity lots of growth on site.
|
General Inspection | 7/12/2019 | 7/12/2019 | 7/12/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 6/27/2019 | 6/27/2019 | 6/28/2019 | P | PASS |
Andy J. Long
|
|
|
Site is inactive but ready for new home construction. Slope below lots has revegetated and sediment control wattles are installed.
Will need to make sure water does not by pass the storm drain at the bottom of the sub, currently the DI is elevated about the channel, so low flows would bypass it.
|
BMP Violation | 6/11/2019 | 6/18/2019 | 6/17/2019 | A | PASS |
Michael Zawacki
|
|
|
Rills have been raked out and neighbors yard cleaned.
|
BMP Violation | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | FAIL |
Michael Zawacki
|
|
|
Still a rill and debris in neighbors yard. Witches hat on drain has failed and fallen into drain, some sediment also in drain. RP has been notified many times about site.
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | FAIL |
Michael Zawacki
|
|
|
Blow out into neighbors yard. RP notified follow up scheduled.
|
General Inspection | 5/24/2019 | 5/24/2019 | 5/24/2019 | | PASS |
Michael Zawacki
|
|
|
Now new blowouts. Good growth on lots.
|
General Inspection | 5/9/2019 | 5/9/2019 | 5/9/2019 | | PASS |
Michael Zawacki
|
|
|
Site now has good growth of mixed vegetation. Rilling and blow out into neighboring yard have been cleaned.
|
Conference | 4/24/2019 | 4/24/2019 | 4/25/2019 | P | DONE |
Andy J. Long
|
|
|
Onsite meeting to discuss corrective actions at site:
- clean out installed storm drain sumps in the bottom of site drainage channel. - After crew repairs damage in channel, install some check dams to slow flow in this drainage channel - Clean up deposited sediment and mud that is on neighbors grass - remove old/damaged wattles that are on slopes and replace. - botttom corner of site should have a silt fence barrier installed to prevent any material leaving site and bypassing the storm drains - Install J-hooks on wattle installed along the top of the slope/edge of parcel. Make sure low spot has a stabilized where water can flow down to the drainage channel. - make sure drain on the common drive is not blocked or obstructed by gravel bags. Water should not flow off drive to the lots.
|
General Inspection | 4/17/2019 | 4/17/2019 | 4/17/2019 | | FAIL |
Michael Zawacki
|
|
|
Rilling and blow out into neighbors yard never repaired. Wattle in good shape.
|
General Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PART |
Michael Zawacki
|
|
|
Wattle was fixed, blow out and rill at bottom of drain and into neighbors yard not repaired.
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/22/2019 | P | FAIL |
Michael Zawacki
|
|
|
BMPs not repaired, dirt blow out into neighbors yard not cleaned. Stake holder meeting needed.
|
General Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 | | FAIL |
Michael Zawacki
|
|
|
New row of wattle installed on top of slope. Wattle below drain has been undercut and material has blown out into neighbors yard.
|
Conference | 2/15/2019 | 2/19/2019 | 2/26/2019 | A | CANC |
Michael Zawacki
|
|
|
site meeting to get corrective action plan implemented.
|
Complaint Inspection | 2/15/2019 | 2/15/2019 | 2/15/2019 | A | FAIL |
Andy J. Long
|
|
|
Significant erosion on site. Lack of vegetaion established. Water under cutting wattles.
RP and owner notified of violations. Site meeting to be condcuted Tuesday AM to get plan to make corrective actions and install more BMPs as needed.
|
General Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | FAIL |
Michael Zawacki
|
|
|
Rilling into perimeter swale, drains inlet bag is full and ditch is blown out, some mud into neighbors yard. Left message with Eric Allen.
|
General Inspection | 1/22/2019 | 1/23/2019 | 1/23/2019 | P | PART |
Michael Zawacki
|
|
|
No new activity. Some rills going around and under wattle. Rilling in perimeter ditch, sediment going into protected drain.
|
General Inspection | 1/21/2019 | 1/21/2019 | 1/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/4/2019 | 1/4/2019 | 1/4/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/20/2018 | 12/20/2018 | 12/20/2018 | | PASS |
Michael Zawacki
|
|
|
Building activity hasn't begun.
|
General Inspection | 12/5/2018 | 12/5/2018 | 12/7/2018 | | PASS |
Michael Zawacki
|
|
|
Activity still hasn't begun.
|
General Inspection | 11/5/2018 | 11/5/2018 | 11/6/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity. BMPs in place and still working.
|
General Inspection | 10/19/2018 | 10/19/2018 | 10/19/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity on site.
|
General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 | | PASS |
Michael Zawacki
|
|
|
No runoff, rills, or ESC issues.
|
General Inspection | 9/19/2018 | 9/19/2018 | 9/20/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity. Tackifier and wattles still in place. No ESC issues.
|
General Inspection | 8/31/2018 | 9/4/2018 | 9/5/2018 | A | PASS |
Michael Zawacki
|
|
|
No new activity.
|
General Inspection | 8/29/2018 | 8/29/2018 | 8/31/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | | PASS |
Michael Zawacki
|
|
|
No new work.
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity since stabalization.
|
General Inspection | 7/13/2018 | 7/13/2018 | 7/13/2018 | | PASS |
Michael Zawacki
|
|
|
Site prep work is complete. Area has been hydroseeded and is currently stable.
|
General Inspection | 6/18/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Michael Zawacki
|
|
|
Area has had slopes hydroseeded and flats tackified. Will soon turn property over to builders.
|
General Inspection | 6/14/2018 | 6/14/2018 | 6/18/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PART |
Andy J. Long
|
|
|
No signs of offsite discharges, no erosion rills or channels observed on slopes. Common drive is now paved and curb and gutter installed.
Correction requests issued to RP Eric: - have earthen berm constructed and edge of parcels to prevent water flowing over slope; or have wattles on slope trenched in minimum of 2 " or more. - install sediment protection on storm drain at end of common drive -post new ESC permit sign
No crew or activity at site. Follow up scheduled for next week
|
General Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Michael Zawacki
|
|
|
No failures after weekend rain event. Wattle will need to be maintained, you can see light under it in places. Crew on site with excavator doing work on drainage along perimeter.
|
General Inspection | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PART |
Andy J. Long
|
|
|
follow up inspection
Site has been cleaned up where discharges occured. Wattles have been installed on tracked slope where erosion has occured.
Correction request: - create earthen berm on edge of parcels to prevent sheet flow from running down slope - rake out rills - install check dams in perimeter ditch (RP stated Central Paving will be regrading some areas in the ditch this week, then check dams can be installed) - install rock bag down slope from site on Toluka in gutter to contain sediment close site. - set schedule for hydroseeding slopes.
|
Random Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Michael Zawacki
|
|
|
No major issues from rain event. Some rilling has undercut the wattles in places around perimeter drain.
|
Conference | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Michael Zawacki
|
|
|
Wattle has been installed on slopes and is protecting site from sheet flow coming off of road. Wattle is installed end to end, not overlapping, chance water will push through seams and cause future rilling. Multiple gravel bags on site that haven't yet been installed.
|
Complaint Inspection | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Michael Zawacki
|
|
|
RP Eric was on site with Syman company getting area repaired and BMPs installed. They will fix hillside and use sandbags to prevent sheet flow from road redirecting and draining on site. Some sediment was i neighbors back yard, there was no flooding of home. Will follow up to check progress of BMP installation.
|
General Inspection | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Michael Zawacki
|
|
|
Knife River on site doing work. Will follow up later this week.
|
Random Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Post rain inspection. No issues with any dirt leaving site. Some rilling forming on slopes leading into drainage.
|
General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 | | PASS |
Michael Zawacki
|
|
|
Site is graded and entire area has been tracked. Drainage system has been installed along entire downhill perimeter of site. No dust at time of inspection.
|
General Inspection | 4/6/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP on compaction and surveyors on site. Some heavy equipment being removed. No issues at site.
|
Random Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PART |
Andy J. Long
|
|
|
Roadway being swept by street sweeper. Permit sign is posted.
Corrections: - re-install or remove silt fence that is not trenched in. Replace with straw wattle.
|
General Inspection | 3/13/2018 | 3/13/2018 | 3/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Perimeter BMPs on down hill side. Ditch has also been dug to move storm water to edge of project. Site will need an entrance once grading completed.
|
General Inspection | 1/12/2018 | 1/25/2018 | 1/25/2018 | P | PART |
Michael Zawacki
|
|
|
Work has begun on grading and clearing boulders. Entrance,gravel bags in gutter, wattle, and silt fence installed. A few sections of fence have been broken or knocked over, I let Eric the RP know. Site is free from trackout and clean.
|
General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 | P | PASS |
Andy J. Long
|
|
|
Grading and boulder removal has started. Permit sign posted. Perimeter vegetation preserved, no trackout. RP states that boulders to be hauled off, debris dumped on site over years removed and then additional perimeter BMPs will be installed. No corrections at this time.
|
General Inspection | 10/20/2017 | 11/20/2017 | 11/20/2017 | A | PASS |
Michael Zawacki
|
|
|
Work hasn't begun.
|
General Inspection | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PASS |
Michael Zawacki
|
|
|
No disturbances have begun.
|
BMP Violation | 5/29/2019 | 5/31/2019 | | A | |
Andy J. Long
|
|
|
|
General Inspection | 3/6/2019 | 3/7/2019 | | P | |
Andy J. Long
|
|
|
|
General Inspection | 11/20/2018 | 11/20/2018 | | | |
Andy J. Long
|
|
|
|