Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberESC17-00791
StatusFinaled
Name ERIC ALLEN
Site Address 2055 S TOLUKA WAY
Project NameMalibu Manor Subdivision
Customer Number 
ePlanReviewNo
Description
Infill subdivision in existing foothills zone subdivision Warm Springs Mesa. New grading, utility installation and driveway approaches required. Site stabilization is required upon completion of grading or in periods of inactivity greater than 14 days. Track out prevention construction entrance, permit sign posting, establish clearing limits, install sediment controls (wattles, silt fence) as indicated on approved site plan. ESC site preparation inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/7/20208/10/20208/10/2020PPASS
DetailsAndy J. Long
No temp BMP removal requests. Construciton complete, disturbed area revegetated. No new home construction or activity at site. ESC permit finaled.
Site Final8/7/20208/10/20208/10/2020PCANC
DetailsAndy J. Long
General Inspection7/31/20207/31/20208/7/2020 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection7/16/20207/16/20207/22/2020 PASS
DetailsMichael Zawacki
General Inspection7/1/20207/1/20207/1/2020 CANC
DetailsAndy J. Long
General Inspection6/16/20206/16/20206/17/2020 PASS
DetailsMichael Zawacki
Stable, no blowouts into neighbors lot or down gravel road.
General Inspection6/1/20206/1/20206/1/2020 PASS
DetailsMichael Zawacki
No activity, heavy vegetation.
General Inspection5/15/20205/15/20205/15/2020 PASS
DetailsMichael Zawacki
No activity, vegetated.
General Inspection4/30/20204/30/20204/30/2020 CANC
DetailsAndy J. Long
General Inspection4/15/20204/15/20204/15/2020 PASS
DetailsAndy J. Long
No activity at site. Lots are posted for sale. Lots have vegetated. No issues at this time
General Inspection3/31/20203/31/20204/1/2020 PASS
DetailsMichael Zawacki
No activity
General Inspection3/16/20203/16/20203/16/2020 CANC
DetailsMichael Zawacki
General Inspection2/28/20202/28/20202/28/2020 PASS
DetailsMichael Zawacki
No activity.
General Inspection2/13/20202/13/20202/14/2020 PASS
DetailsAndy J. Long
No activity. No issues observed.
General Inspection1/29/20201/29/20201/29/2020 PASS
DetailsMichael Zawacki
No activity, no blowout to lots below.
General Inspection1/14/20201/14/20201/14/2020 CANC
DetailsMichael Zawacki
General Inspection12/30/201912/30/201912/30/2019 CANC
DetailsMichael Zawacki
General Inspection12/13/201912/13/201912/13/2019 PASS
DetailsMichael Zawacki
No activity, no blow outs into neighbors yard.
General Inspection11/28/201911/28/201912/3/2019 PASS
DetailsMichael Zawacki
No activity.
General Inspection11/13/201911/13/201911/13/2019 CANC
DetailsMichael Zawacki
General Inspection10/29/201910/29/201910/29/2019 PASS
DetailsMichael Zawacki
No new activity.
General Inspection10/14/201910/14/201910/14/2019 CANC
DetailsMichael Zawacki
General Inspection9/27/20199/27/20199/30/2019 PASS
DetailsMichael Zawacki
Site is stable, no esc issues. Good growth covering area.
General Inspection9/12/20199/12/20199/12/2019 PASS
DetailsMichael Zawacki
No new activity, no issues from rain event.
General Inspection8/28/20198/28/20198/30/2019 PASS
DetailsMichael Zawacki
No new activity.
General Inspection8/13/20198/13/20198/13/2019 PASS
DetailsMichael Zawacki
No new activity. Lots of growth and coverage on site, mo new rills or blow outs into neighbors yard.
General Inspection7/29/20197/29/20197/29/2019 PASS
DetailsMichael Zawacki
No new activity lots of growth on site.
General Inspection7/12/20197/12/20197/12/2019 CANC
DetailsMichael Zawacki
General Inspection6/27/20196/27/20196/28/2019PPASS
DetailsAndy J. Long
Site is inactive but ready for new home construction. Slope below lots has revegetated and sediment control wattles are installed.

Will need to make sure water does not by pass the storm drain at the bottom of the sub, currently the DI is elevated about the channel, so low flows would bypass it.
BMP Violation6/11/20196/18/20196/17/2019APASS
DetailsMichael Zawacki
Rills have been raked out and neighbors yard cleaned.
BMP Violation6/11/20196/11/20196/11/2019PFAIL
DetailsMichael Zawacki
Still a rill and debris in neighbors yard. Witches hat on drain has failed and fallen into drain, some sediment also in drain. RP has been notified many times about site.
General Inspection5/29/20195/29/20195/29/2019PFAIL
DetailsMichael Zawacki
Blow out into neighbors yard. RP notified follow up scheduled.
General Inspection5/24/20195/24/20195/24/2019 PASS
DetailsMichael Zawacki
Now new blowouts. Good growth on lots.
General Inspection5/9/20195/9/20195/9/2019 PASS
DetailsMichael Zawacki
Site now has good growth of mixed vegetation. Rilling and blow out into neighboring yard have been cleaned.
Conference4/24/20194/24/20194/25/2019PDONE
DetailsAndy J. Long
Onsite meeting to discuss corrective actions at site:

- clean out installed storm drain sumps in the bottom of site drainage channel.
- After crew repairs damage in channel, install some check dams to slow flow in this drainage channel
- Clean up deposited sediment and mud that is on neighbors grass
- remove old/damaged wattles that are on slopes and replace.
- botttom corner of site should have a silt fence barrier installed to prevent any material leaving site and bypassing the storm drains
- Install J-hooks on wattle installed along the top of the slope/edge of parcel. Make sure low spot has a stabilized where water can flow down to the drainage channel.
- make sure drain on the common drive is not blocked or obstructed by gravel bags. Water should not flow off drive to the lots.
General Inspection4/17/20194/17/20194/17/2019 FAIL
DetailsMichael Zawacki
Rilling and blow out into neighbors yard never repaired.
Wattle in good shape.
General Inspection4/2/20194/2/20194/2/2019PPART
DetailsMichael Zawacki
Wattle was fixed, blow out and rill at bottom of drain and into neighbors yard not repaired.
General Inspection3/19/20193/19/20193/22/2019PFAIL
DetailsMichael Zawacki
BMPs not repaired, dirt blow out into neighbors yard not cleaned.
Stake holder meeting needed.
General Inspection3/6/20193/6/20193/6/2019 FAIL
DetailsMichael Zawacki
New row of wattle installed on top of slope. Wattle below drain has been undercut and material has blown out into neighbors yard.
Conference2/15/20192/19/20192/26/2019ACANC
DetailsMichael Zawacki
site meeting to get corrective action plan implemented.
Complaint Inspection2/15/20192/15/20192/15/2019AFAIL
DetailsAndy J. Long
Significant erosion on site. Lack of vegetaion established. Water under cutting wattles.

RP and owner notified of violations. Site meeting to be condcuted Tuesday AM to get plan to make corrective actions and install more BMPs as needed.
General Inspection2/4/20192/4/20192/4/2019PFAIL
DetailsMichael Zawacki
Rilling into perimeter swale, drains inlet bag is full and ditch is blown out, some mud into neighbors yard. Left message with Eric Allen.
General Inspection1/22/20191/23/20191/23/2019PPART
DetailsMichael Zawacki
No new activity.
Some rills going around and under wattle.
Rilling in perimeter ditch, sediment going into protected drain.
General Inspection1/21/20191/21/20191/22/2019 CANC
DetailsAndy J. Long
General Inspection1/4/20191/4/20191/4/2019 CANC
DetailsAndy J. Long
General Inspection12/20/201812/20/201812/20/2018 PASS
DetailsMichael Zawacki
Building activity hasn't begun.
General Inspection12/5/201812/5/201812/7/2018 PASS
DetailsMichael Zawacki
Activity still hasn't begun.
General Inspection11/5/201811/5/201811/6/2018 PASS
DetailsMichael Zawacki
No new activity. BMPs in place and still working.
General Inspection10/19/201810/19/201810/19/2018 PASS
DetailsMichael Zawacki
No new activity on site.
General Inspection10/4/201810/4/201810/4/2018 PASS
DetailsMichael Zawacki
No runoff, rills, or ESC issues.
General Inspection9/19/20189/19/20189/20/2018 PASS
DetailsMichael Zawacki
No new activity. Tackifier and wattles still in place. No ESC issues.
General Inspection8/31/20189/4/20189/5/2018APASS
DetailsMichael Zawacki
No new activity.
General Inspection8/29/20188/29/20188/31/2018 CANC
DetailsAndy J. Long
General Inspection8/14/20188/14/20188/14/2018 PASS
DetailsMichael Zawacki
No new work.
General Inspection8/14/20188/14/20188/14/2018PCANC
DetailsMichael Zawacki
General Inspection7/30/20187/30/20187/30/2018 PASS
DetailsMichael Zawacki
No new activity since stabalization.
General Inspection7/13/20187/13/20187/13/2018 PASS
DetailsMichael Zawacki
Site prep work is complete. Area has been hydroseeded and is currently stable.
General Inspection6/18/20186/28/20186/28/2018PPASS
DetailsMichael Zawacki
Area has had slopes hydroseeded and flats tackified. Will soon turn property over to builders.
General Inspection6/14/20186/14/20186/18/2018 CANC
DetailsAndy J. Long
General Inspection6/18/20186/18/20186/18/2018PPART
DetailsAndy J. Long
No signs of offsite discharges, no erosion rills or channels observed on slopes. Common drive is now paved and curb and gutter installed.

Correction requests issued to RP Eric:
- have earthen berm constructed and edge of parcels to prevent water flowing over slope; or have wattles on slope trenched in minimum of 2 " or more.
- install sediment protection on storm drain at end of common drive
-post new ESC permit sign

No crew or activity at site. Follow up scheduled for next week
General Inspection5/30/20185/30/20185/30/2018PPASS
DetailsMichael Zawacki
No failures after weekend rain event. Wattle will need to be maintained, you can see light under it in places.
Crew on site with excavator doing work on drainage along perimeter.
General Inspection5/23/20185/23/20185/23/2018PPART
DetailsAndy J. Long
follow up inspection

Site has been cleaned up where discharges occured. Wattles have been installed on tracked slope where erosion has occured.

Correction request:
- create earthen berm on edge of parcels to prevent sheet flow from running down slope
- rake out rills
- install check dams in perimeter ditch (RP stated Central Paving will be regrading some areas in the ditch this week, then check dams can be installed)
- install rock bag down slope from site on Toluka in gutter to contain sediment close site.
- set schedule for hydroseeding slopes.
Random Inspection5/21/20185/21/20185/21/2018PPASS
DetailsMichael Zawacki
No major issues from rain event. Some rilling has undercut the wattles in places around perimeter drain.
Conference5/18/20185/18/20185/18/2018PPASS
DetailsMichael Zawacki
Wattle has been installed on slopes and is protecting site from sheet flow coming off of road. Wattle is installed end to end, not overlapping, chance water will push through seams and cause future rilling. Multiple gravel bags on site that haven't yet been installed.
Complaint Inspection5/18/20185/18/20185/18/2018PPASS
DetailsMichael Zawacki
RP Eric was on site with Syman company getting area repaired and BMPs installed. They will fix hillside and use sandbags to prevent sheet flow from road redirecting and draining on site. Some sediment was i neighbors back yard, there was no flooding of home. Will follow up to check progress of BMP installation.
General Inspection5/16/20185/16/20185/16/2018PPASS
DetailsMichael Zawacki
Knife River on site doing work. Will follow up later this week.
Random Inspection5/14/20185/14/20185/14/2018PPASS
DetailsMichael Zawacki
Post rain inspection. No issues with any dirt leaving site. Some rilling forming on slopes leading into drainage.
General Inspection5/9/20185/9/20185/9/2018 PASS
DetailsMichael Zawacki
Site is graded and entire area has been tracked. Drainage system has been installed along entire downhill perimeter of site. No dust at time of inspection.
General Inspection4/6/20184/19/20184/19/2018PPASS
DetailsMichael Zawacki
WIP on compaction and surveyors on site. Some heavy equipment being removed. No issues at site.
Random Inspection4/6/20184/6/20184/6/2018PPART
DetailsAndy J. Long
Roadway being swept by street sweeper. Permit sign is posted.

Corrections:
- re-install or remove silt fence that is not trenched in. Replace with straw wattle.
General Inspection3/13/20183/13/20183/14/2018PPASS
DetailsMichael Zawacki
Perimeter BMPs on down hill side. Ditch has also been dug to move storm water to edge of project. Site will need an entrance once grading completed.
General Inspection1/12/20181/25/20181/25/2018PPART
DetailsMichael Zawacki
Work has begun on grading and clearing boulders. Entrance,gravel bags in gutter, wattle, and silt fence installed. A few sections of fence have been broken or knocked over, I let Eric the RP know. Site is free from trackout and clean.
General Inspection1/12/20181/12/20181/12/2018PPASS
DetailsAndy J. Long
Grading and boulder removal has started. Permit sign posted. Perimeter vegetation preserved, no trackout. RP states that boulders to be hauled off, debris dumped on site over years removed and then additional perimeter BMPs will be installed. No corrections at this time.
General Inspection10/20/201711/20/201711/20/2017APASS
DetailsMichael Zawacki
Work hasn't begun.
General Inspection10/19/201710/20/201710/20/2017APASS
DetailsMichael Zawacki
No disturbances have begun.
BMP Violation5/29/20195/31/2019 A 
DetailsAndy J. Long
General Inspection3/6/20193/7/2019 P 
DetailsAndy J. Long
General Inspection11/20/201811/20/2018   
DetailsAndy J. Long