Site Final | 10/16/2018 | 10/16/2018 | 10/17/2018 | P | PASS |
Andy J. Long
|
|
|
Construction complete. No ESC requests. Former laydown areas now developed or have new use. ESC permit finaled.
|
General Inspection | 10/16/2018 | 10/16/2018 | 10/16/2018 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 10/1/2018 | 10/1/2018 | 10/5/2018 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/19/2018 | 9/19/2018 | 9/20/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 | | PASS |
Andy J. Long
|
|
|
Still monitoring former staging and laydown areas. No new construction occuring.
|
General Inspection | 8/20/2018 | 8/20/2018 | 8/20/2018 | | PASS |
Andy J. Long
|
|
|
All construction on site at Jump is complete, exterior surfaces stabilized and cleaned, DI bags removed.
Okland Construction is now using the staging yard and laydown area east of 13th, formerly JUMP parking and concrete washout. Will notify them to control trackout and dust in this area, see ESC18-00529
|
General Inspection | 8/3/2018 | 8/3/2018 | 8/3/2018 | | PASS |
Andy J. Long
|
|
|
Construction on site at Jump is complete. No disturbed area or loose material. Temp BMPs have been removed.
ESC permit open to monitor clean up of staging yards, washout dump area, and employee parking utilized for project.
|
General Inspection | 7/19/2018 | 7/19/2018 | 7/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/4/2018 | 7/4/2018 | 7/6/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/4/2018 | 6/4/2018 | 6/4/2018 | | PASS |
Andy J. Long
|
|
|
SW corner still in stabilization process. Minimal exterior excavation. Large stockpiles of material and concrete washout located on parcel 13th Street between Front & Myrtle connector on-ramps. Material will need removal for permit final.
|
General Inspection | 5/18/2018 | 5/18/2018 | 5/18/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/3/2018 | 5/3/2018 | 5/3/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/18/2018 | 4/18/2018 | 4/18/2018 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/3/2018 | 4/3/2018 | 4/3/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/19/2018 | 3/19/2018 | 3/19/2018 | | PASS |
Andy J. Long
|
|
|
No discharges or trackout. Some construction activity ongoing at SW corner of JUMP next woth SWHQ
|
General Inspection | 3/2/2018 | 3/2/2018 | 3/2/2018 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 2/15/2018 | 2/15/2018 | 2/21/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/31/2018 | 1/31/2018 | 1/31/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/16/2018 | 1/16/2018 | 1/22/2018 | | PASS |
Michael Zawacki
|
|
|
Site walk through. Area is stabalized and landscaping is complete. Area in center is fenced off but there is no work or ground disturbances. Currently no active construction on site.
|
General Inspection | 1/1/2018 | 1/1/2018 | 1/2/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/15/2017 | 12/15/2017 | 12/19/2017 | | PEND |
Andy J. Long
|
|
|
Need to schedule site final and inspect staging areas for left over materials and debris, such as cement washout pile on 13th between the Connector on-ramps.
|
General Inspection | 11/15/2017 | 11/15/2017 | 11/21/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/31/2017 | 10/31/2017 | 11/1/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/16/2017 | 10/16/2017 | 10/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/29/2017 | 9/29/2017 | 9/29/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/14/2017 | 9/14/2017 | 9/14/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/30/2017 | 8/30/2017 | 8/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/15/2017 | 8/15/2017 | 8/16/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/31/2017 | 7/31/2017 | 8/1/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/14/2017 | 7/14/2017 | 7/14/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 6/29/2017 | 6/29/2017 | 6/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/14/2017 | 6/14/2017 | 6/14/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/30/2017 | 5/30/2017 | 5/30/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/15/2017 | 5/15/2017 | 5/15/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/28/2017 | 4/28/2017 | 4/28/2017 | | PEND |
Andy J. Long
|
|
|
Need clean up of concrete washout and staging area west of 13th Street between I-184 ramps in order to final. JUMP building is complete except for site improvements on the corner of 11th & Myrtle.
|
General Inspection | 4/13/2017 | 4/13/2017 | 4/13/2017 | | PASS |
Melissa Jannusch
|
|
|
11th and Myrtle staging area still in use. Other areas of soil are stable and landscaped. No ESC issues observed in staging area.
|
General Inspection | 3/29/2017 | 3/29/2017 | 3/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/14/2017 | 3/14/2017 | 3/14/2017 | | PEND |
Andy J. Long
|
|
|
MS4 inlets on Myrtle and 9th street have had filter bags removed. Perimeter and landscaping is mostly complete. Some construction access and activity is ongoing Myrtle and 11th. No trackoout observed.
Correction needed:
Remove concrete chunks and and clean up waste materials from laydown yard # 3 west of 13th street.
|
General Inspection | 2/27/2017 | 2/27/2017 | 2/28/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/26/2017 | 1/26/2017 | 1/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/11/2017 | 1/11/2017 | 1/17/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/27/2016 | 12/27/2016 | 12/30/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/12/2016 | 12/12/2016 | 12/13/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/25/2016 | 11/25/2016 | 11/25/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/10/2016 | 11/10/2016 | 11/10/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/26/2016 | 10/26/2016 | 10/28/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/26/2016 | 9/26/2016 | 9/27/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/9/2016 | 9/9/2016 | 9/9/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/25/2016 | 8/25/2016 | 8/25/2016 | | PEND |
Evan Jenkins
|
|
|
Near Completion
|
General Inspection | 8/10/2016 | 8/10/2016 | 8/10/2016 | | PASS |
Evan Jenkins
|
|
|
work near complete no ESC issues observed at this time
|
General Inspection | 7/26/2016 | 7/26/2016 | 7/26/2016 | | PASS |
Evan Jenkins
|
|
|
Project Near Completion. Minor work occuring in center of project. No discharges leaving the site at this time.
|
General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 | | PASS |
Evan Jenkins
|
|
|
near completion without issues observed
|
Complaint Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 | P | PEND |
Andy J. Long
|
|
|
Anonymous trackout complaint of "mud all over 9th Street"
Simplot WHQ contractor operating in ROW on 9th Street to connect to sewer. Cutting into road and installing sewer manhole structures. Trackout from loading trucks is being swept manually by broom. Will need to use street sweeper at end of project. Down gradient stormdrains on 9th and Myrtle have sediment filter bags installed. No discharges at time of inspection.
Requested that dewatering be reported and monitored. Will likely direct water back to onsite dewatering system, which may actually prevent the need for dewatering.
9th Street is closed til Sunday, and potentially till Wednesday.
|
General Inspection | 6/22/2016 | 6/22/2016 | 6/22/2016 | | PART |
Evan Jenkins
|
|
|
minor trackout onto myrtle. sweep it up
|
General Inspection | 6/7/2016 | 6/7/2016 | 6/7/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/23/2016 | 5/23/2016 | 5/23/2016 | | PASS |
Evan Jenkins
|
|
|
WIP: near completion of simplot offices. no esc issues observed
|
General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 | | PASS |
Andy J. Long
|
|
|
WIP on SWQ portion of project. JUMP staging areas and courtyard still being utilized for construction needs. No significant trackout obsevrved, no spills or dishcarges originating from site. MS4 inlets have sediment filter bags received. No complaints received.
No corrections issued.
|
General Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | | PASS |
Andy J. Long
|
|
|
JUMP structure is complete and on site permanent stormwater facilities are installed. No runoff or discharges from construction area.
Active construction occuring in courtyard area north of the building for work on the SWHQ (ESC14-00719).
Trackout onto Myrtle and 11th is swept regularly. No significant accumulations at time of inspection. No corrections issued at this time.
|
General Inspection | 4/6/2016 | 4/6/2016 | 4/6/2016 | | PART |
Evan Jenkins
|
|
|
some trackout occuring at intersection of 11th and Myrtle. Contacted RP John Beck to have it swept up. He stated he will get right on it. Will follow up later
|
General Inspection | 3/22/2016 | 3/22/2016 | 3/22/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 | | PART |
Andy J. Long
|
|
|
Need to clean up trackout from the southwest entrance into complex from Myrtle @ 11th. No discharges, perimeter gutters are clean. DI bags installed.
|
General Inspection | 2/19/2016 | 2/19/2016 | 2/19/2016 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 2/4/2016 | 2/4/2016 | 2/4/2016 | | PASS |
Evan Jenkins
|
|
|
vertical construction continues. minor trackout onto myrtle st that needs swept
|
General Inspection | 1/20/2016 | 1/20/2016 | 1/20/2016 | | PASS |
Evan Jenkins
|
|
|
Vertical construction continues. No trackout observed at this time
|
General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 | | PASS |
Andy J. Long
|
|
|
No trackout issues from site or staging areas observed. WIP on Simplot HQ, JUMP is nearly complete. Temp BMPs (inlet protection) is installed. No corrections at this time.
|
General Inspection | 12/21/2015 | 12/21/2015 | 12/21/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/3/2015 | 12/4/2015 | 12/4/2015 | P | PASS |
Evan Jenkins
|
|
|
The Main Jump building has Temp Ocupancy, with minor work occuring in the basement. The office building is in full vertical construction. No ESC issues oberved at this time
|
Site Preparation | 12/3/2015 | 12/4/2015 | 12/3/2015 | P | CANC |
Andy J. Long
|
|
|
data entry error, disregard
|
General Inspection | 11/27/2015 | 12/3/2015 | 12/3/2015 | P | CANC |
Andy J. Long
|
|
|
rescheduled for 12/4
|
General Inspection | 11/26/2015 | 11/26/2015 | 11/27/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled.
|
General Inspection | 11/11/2015 | 11/11/2015 | 11/12/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: some minor track out that needs to be swept up along Myrtle. Looks to be from 1 dump truck
|
General Inspection | 10/27/2015 | 10/27/2015 | 10/27/2015 | | PASS |
Evan Jenkins
|
|
|
wip: on interior only at this time. no esc issues observed at this time
|
General Inspection | 10/12/2015 | 10/12/2015 | 10/13/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no issues observed at this time
|
General Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 | | PASS |
Evan Jenkins
|
|
|
WIP on both JUMP and Simplot offices. No trackout or other violations observed.
|
General Inspection | 9/10/2015 | 9/10/2015 | 9/10/2015 | | PASS |
Evan Jenkins
|
|
|
WIP on verticle office structures
|
General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 | | PASS |
Evan Jenkins
|
|
|
No more dewatering into the MS4. They tapped perminately into the Boise City Canal. No trackout observed or other violations.
|
General Inspection | 8/11/2015 | 8/11/2015 | 8/13/2015 | | PASS |
Andy J. Long
|
|
|
WIP on vertical phase of new Simplt HQ at JUMP. Site perimeter is free of trackout and no material spills or discharges observed. No complaints received. Site stormwater team is keeping SWPPP on site. No corrections issued at this time.
|
Conference | 7/27/2015 | 7/27/2015 | 7/27/2015 | P | PEND |
Evan Jenkins
|
|
|
Phone Call to John Beck inquiring where the JUMP Project's SWPPP is. He stated he is unsure but will continue to look. I have a feeling Strata (SWPPP Developer) may have it in their office. Contacted ACHD Luke Roberts to discuss as well. Will perform an audit inspection to located their SWPPP to ensure they have been updating their SWPPP per EPA requirements, and get back into ESC Compliance with City of Boise and ACHD for contractor keeping SWPPP updated and onsite at all times.
|
General Inspection | 7/27/2015 | 7/27/2015 | 7/27/2015 | | PASS |
Evan Jenkins
|
|
|
Verticle Construction in progress
|
General Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No Issues at this time
|
General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues observed during inspection. Beginning to work on the Office Buildings portion
|
General Inspection | 6/10/2015 | 6/10/2015 | 6/10/2015 | | PART |
Evan Jenkins
|
|
|
WIP: Myrtle St. is getting pretty dirty on the shoulder closest to the project. When safe, contractor shall sweep the perimeter of project
|
General Inspection | 5/26/2015 | 5/26/2015 | 5/26/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | | PASS |
Andy J. Long
|
|
|
Cement washout located in staging yard on 13th Street. MS4 inlets driain perimeter roads have filter bag protection. No trackout from main site or employee parking areas. Dirt under fence barrier on Myrtle will need to be swept thoroughly upon removal.
Approved.
|
General Inspection | 4/24/2015 | 4/24/2015 | 4/24/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: area along Myrtle could use a sweeping soon, but could be potentially dangerious due to heavy volume of traffic. No other ESC issues observed at this time
|
General Inspection | 4/9/2015 | 4/9/2015 | 4/9/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: New office building is currently being constructed. No ESC issues observed at this time
|
General Inspection | 3/24/2015 | 3/25/2015 | 3/25/2015 | P | PART |
Andy J. Long
|
|
|
Need to install DI bag for parking lot on 13th and sweep up trackout.
No trackout from main site, no discharges observed.
|
General Inspection | 3/24/2015 | 3/24/2015 | 3/24/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 3/6/2015 | 3/9/2015 | 3/10/2015 | A | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 3/6/2015 | 3/6/2015 | 3/9/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/19/2015 | 2/19/2015 | 2/24/2015 | | PASS |
Andy J. Long
|
|
|
Streets and gutters around JUMP project areas are free of trackout or excessive sediment. Dewatering is on-going into the MS4 but will soon be transfered to the Boise City Canal.
No dust, discharges, or other issues observed around site perimeter. Approved.
|
General Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | | PASS |
Andy J. Long
|
|
|
Streets surrounding JUMP project, laydown yard, and employee parking areas do not have significant trackout. Checked MS4 discharge into river and it is visibly clear. Concrete washout located within site. No corrections needed currently.
|
General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues. Dewatering into MS4 occuring
|
General Inspection | 1/2/2015 | 1/5/2015 | 1/5/2015 | A | PASS |
Andy J. Long
|
|
|
Dewatering via MS4 is still ongoing and monitored by Strata and ACHD. No trackout onto surrounding streets, only two exit/entrances in operation currently. No complaints received, no discharges observed. No corrections at this time.
|
General Inspection | 1/2/2015 | 1/2/2015 | 1/2/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Andy J. Long
|
|
|
JUMP project ongoing. Cement trucks pouring foundation for Simplot HQ building currently. Designated washout area is being used. New construction entrance/exit ramp has been built on Mytrle. No trackout issues.
Perimeter streets and gutters are free of significant amounts of construction related sediment. Dewaterining is ongoing into the MS4 on 9th street, Strata is taking turbidity samples and submitting them to ACHD. No violations of limits reported.
Approved, no corrections at this time.
|
General Inspection | 12/17/2014 | 12/17/2014 | 12/17/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled due to meeting
|
General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 11/17/2014 | 11/17/2014 | 11/17/2014 | | PASS |
Andy J. Long
|
|
|
No trackout from JUMP site or associated parking/staging areas. Site is still working to get the permanent dewatering system online, currently no turbid discharges observed or recent reports of variance above WQS. No corrections at this time. Lined washout is being utilized; west construction entrance has been removed.
|
General Inspection | 10/31/2014 | 10/31/2014 | 10/31/2014 | | PASS |
Evan Jenkins
|
|
|
|
BMP Violation | 10/16/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Andy J. Long
|
|
|
check for washout facility that was requested
Lined washout facilitiy has been provided for use of outgoing concrete trucks. Old chunks/aggregate has been moved. Correction satisified. No new issues observed.
|
General Inspection | 10/8/2014 | 10/8/2014 | 10/8/2014 | | PART |
Andy J. Long
|
|
|
Streets and gutters surrounding JUMP project are free of significant amounts of sediment from site. Dewatering filter units are installed at corner of 9th and Front and then discharging into MS4 on 9th. Water appears clear and also visual unimpaired at system discharge into Boise River by 9th Street brige.
Correction: 1. Need to provide a lined concrete washout facility on the west side of site per SWPPP. Concrete trucks washing out directly onto ground.
Called RP John Beck to make request.
|
General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 | | PART |
Andy J. Long
|
|
|
Streets surrounding JUMP are free of trackout or excessive sediment accumulations. Observed dewatering discharge outlet and Strata engineers was there taking their daily sampling for turbidity. Measurements have been in compliance and water looked clear.
2 deficiencies: 1. Visible areas where concrete has been washed out in uncontained area (close to ground water) 2. No rock on east construction ramp. Will become a problem in rainy season.
Will send notice to Hoffman stormwater crew.
|
General Inspection | 9/8/2014 | 9/8/2014 | 9/8/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/22/2014 | 8/22/2014 | 8/22/2014 | | PART |
Evan Jenkins
|
|
|
significant trackout occuring on 11th st. contacted Noelle via cell to disclose trackout issue. She stated she will contact the sweepers right away to get it taken care of. will follow up this afternoon to ensure compliance
|
General Inspection | 8/7/2014 | 8/7/2014 | 8/7/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/8/2014 | 7/8/2014 | 7/8/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues Turbidity Measurements are looking good: Very low NTU measurements
|
General Inspection | 6/23/2014 | 6/23/2014 | 6/23/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/22/2014 | 5/22/2014 | 5/22/2014 | | PASS |
Evan Jenkins
|
|
|
no esc issues at time of inspection
|
Random Inspection | 5/7/2014 | 5/7/2014 | 5/7/2014 | P | PASS |
Andy J. Long
|
|
|
Checked MS4 outlet pipe to Boise River on 9th Street. No visible plume of sediment or discoloration observed. JUMP is currently in process of dewatering to the MS4 and has two sediment settling tanks.
|
Complaint Inspection | 4/29/2014 | 4/29/2014 | 4/29/2014 | A | PART |
Evan Jenkins
|
|
|
Complaint hotline response regarding noise and dust from the JUMP project.
Inspection findings: HOFFMAN CONSTRUCTION TO SWEEP ENTIRE 11ST ST FROM CURB TO CURB. PERFORM MAINTENANCE ON ALL PERIMETER DROP INLET BMP'S AND PERFORM MAINTENANCE ON THEIR CONSTRUCTION ENTRANCE. FUGATIVE DUST COMPLAINT, NOT COMING FROM JUMP PROJECT, BUT FROM GRAVEL/DIRT PARKING LOT JUST WEST OF JUMP PROJECT: "THE CAR PARK" 336.6597
|
General Inspection | 4/28/2014 | 4/28/2014 | 4/28/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/11/2014 | 4/11/2014 | 4/11/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/27/2014 | 3/27/2014 | 3/27/2014 | | PART |
Evan Jenkins
|
|
|
Construction entrance entering 11th st needs maintenance performed and street sweeping of 11th. Dewatering is very clear.
|
General Inspection | 3/12/2014 | 3/12/2014 | 3/12/2014 | | PART |
Evan Jenkins
|
|
|
11th St. Needs swept (Curbs and Sidewalks as well). Perform maintenance on construction entrances as well. Dewatering Looks Good. Talked w/ Noelle in office about ESC Issues. They called sweeper while I was there to take care of 11th, will address construction entrances asap
|
Conference | 2/25/2014 | 2/25/2014 | 2/25/2014 | P | PASS |
Andy J. Long
|
|
|
JUMP dewatering observation @ 2:30 with Noelle Spencer ###-####
Met with Jon Beck and dewatering technicians. Untreated pump flow was observed flowing into bypass area. Water appeared clear and sand was visible in the washout area from initial flows.
We approved connection to the sediment tanks, (40,000 gallon) which are now filling. Discharge at 9th street outfall should begin this eveninng. ACHD stormwater inspector Jason Korn reviewed monitoring requirements. A background observation at 9th street outfall was conducted, no plume visible. So low volume flow.
Dewatering may commence. Scheduled to continue through the summer.
|
General Inspection | 2/21/2014 | 2/21/2014 | 2/21/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection. Dewatering is expected to start sometime today, or monday at the latest
|
General Inspection | 2/6/2014 | 2/6/2014 | 2/6/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection
|
Site Preparation | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | PASS |
Evan Jenkins
|
|
|
JOE Phone #: ###-#### 2 Construction Entrances were installed, streets were swept. Back in Compliance
|
BMP Violation | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | CANC |
Evan Jenkins
|
|
|
Reinspection for BMP Violation Corrections. Reinspection Fee will be assesed Wait for Noelle Spencer to call in for a reinspection
|
General Inspection | 1/16/2014 | 1/16/2014 | 1/16/2014 | | FAIL |
Evan Jenkins
|
|
|
Correction Notice Posted: Install Construction Entrance Immediately Sweep Entry into Project and the Impacted ACHD's Right-of-Way (11th St.) Call PDS to scedual reinspection for BMP violations for tomorrow morning 1-17-14
|
General Inspection | 1/1/2014 | 1/1/2014 | 1/2/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 12/17/2013 | 12/17/2013 | 12/17/2013 | | PASS |
Andy J. Long
|
|
|
Interim groundwater retention pond is now empty. No pumping of ground water, dischages or connections to MS4 observed. Perimeter BMPs and construction entrance currently adequate.
|
General Inspection | 12/2/2013 | 12/2/2013 | 12/2/2013 | | CANC |
Evan Jenkins
|
|
|
Fee's Due/Hold No ESC Inspections until Fee's are paid
|
General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 | | PASS |
Andy J. Long
|
|
|
No dewatering or dewatering equipment observed at time of inspection. Called Hoffman contact Noelle to discuss dewatering plans and status of project, she was not available. Will update upon talking to her.
No corrections at this time.
|
General Inspection | 10/31/2013 | 10/31/2013 | 10/31/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/16/2013 | 10/16/2013 | 10/16/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/1/2013 | 10/1/2013 | 10/1/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/16/2013 | 9/16/2013 | 9/17/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/30/2013 | 8/30/2013 | 8/30/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/15/2013 | 8/15/2013 | 8/15/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 7/31/2013 | 7/31/2013 | 7/31/2013 | | PART |
Kimberly M. Johnson
|
|
|
Verbal to Noelle: concrete washout needs maintenance; liner in pond needs maintenance; pond is near max capacity.
|
General Inspection | 7/16/2013 | 7/16/2013 | 7/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/1/2013 | 7/1/2013 | 7/1/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/14/2013 | 6/14/2013 | 6/14/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 5/30/2013 | 5/30/2013 | 5/30/2013 | A | PART |
Clint A Smith
|
|
|
Pumps to the drainage basin will be shut off no later than Monday (6/3/2013). But they will make the repairs on all plastic sheeting on the backs of the basin just in case of future use.
|
General Inspection | 5/29/2013 | 5/29/2013 | 5/30/2013 | | DEFR |
Clint A Smith
|
|
|
Moved to 5/30/2013
|
General Inspection | 5/14/2013 | 5/14/2013 | 5/14/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/26/2013 | 4/26/2013 | 4/29/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/27/2013 | 3/27/2013 | 3/28/2013 | | PASS |
Clint A Smith
|
|
|
Both of the weir tanks have been removed. Still pumpimg into the infiltration basin. Appears to be a clean discharge.
|
General Inspection | 3/12/2013 | 3/12/2013 | 3/12/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Staging area on myrtle and 11th in progress. Dewatering still in progress to basin. water clean
|
General Inspection | 2/25/2013 | 2/25/2013 | 2/25/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/8/2013 | 2/8/2013 | 2/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 1/23/2013 | 1/24/2013 | 1/25/2013 | A | PART |
Clint A Smith
|
|
|
Verbal to MacCalvein Contruction(RP is not on site) Place plactic within the washout pit prior to the next pour date.
|
General Inspection | 1/23/2013 | 1/23/2013 | 1/23/2013 | | CANC |
Clint A Smith
|
|
|
Moved to 1/24/2013 for an AM inspection to discuss with the RP over future of the project.
|
General Inspection | 1/8/2013 | 1/8/2013 | 1/8/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/6/2012 | 12/6/2012 | 12/6/2012 | | PASS |
Kimberly M. Johnson
|
|
|
Discussed need to protect groundwater from washwater, fueling, ect with RP. No violations witnessed at time of inspection. Reviewed proposed staging area in lot on south side of Myrtle.
|
General Inspection | 11/21/2012 | 11/21/2012 | 11/21/2012 | | PASS |
Clint A Smith
|
|
|
|
Conference | 11/6/2012 | 11/6/2012 | 11/6/2012 | A | PASS |
Kimberly M. Johnson
|
|
|
Conference requested to approve on site dewatering system. Scheduled for 2 PM. Dewatering swale approved for use.
|
Conference | 11/5/2012 | 11/5/2012 | 11/5/2012 | A | FAIL |
Kimberly M. Johnson
|
|
|
Conference called onsite to review dewatering system prior to using. Inspection yielded the following corrections before dewatering may begin: 1) Plastic sheeting used to stabilized the slopes is not keyed in at the top. We discussed using sandbags in lieu of trenching on the two asphalt sides, 2) overlap is not sealed sufficiently, 3) two holes in plastic need repaired. 4) Slopes not 2:1. Discussed safety concern about steep slopes with no point of egress.
|
General Inspection | 11/1/2012 | 11/1/2012 | 11/1/2012 | | PART |
Kimberly M. Johnson
|
|
|
Infilitration Swale per approved dewatering plan in process of being constructed. Public works approved modified drainage plan 10/31. Side walls of basin need sloped 2:1. Contractor's stabilization preference for the walls is plastic. Plastic sheeting must be minimum 6 mil, keyed in at the top of slope and held in place with sandbags or other weights placed no more than 10 ft apart. Sema shall be taped or weighted down the entire length. Overlap shall be at least 24 inches. All edges should be embedded at least 6 inches into soil. Spoke to Noelle about these specifications via phone on 10/31
|
Conference | 10/17/2012 | 10/17/2012 | 10/17/2012 | A | DONE |
Kimberly M. Johnson
|
|
|
Discussed with reps from Hoffman, JUMP, ACHD and Strata about the illicit discharges occurring on Sept 6 and again on Sept 14 and the potential illicit discharge occurring week of 10/8. Also discussed the delinquent revised dewatering plan due Sept 28. Hoffman plans to implement an infiltration swale per approved plans to retain all water on site. Hoffman will submit a schedule/plan of action to the ACHD and the City for the construction of the swale no later than the end of the day. City requested sizing calculations for the swale. Hoffman requested permission to continue dewatering to the MS4 until the swale is built. ACHD temporarily granted approval until a plan of action/schedule can be reviewed.
|
General Inspection | 10/17/2012 | 10/17/2012 | 10/17/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Revised dewatering plan delinquent.
|
General Inspection | 10/2/2012 | 10/2/2012 | 10/2/2012 | | PASS |
Clint A Smith
|
|
|
All activities are compliant
|
Tracking Control | 9/13/2012 | 9/15/2012 | 9/17/2012 | A | CANC |
Clint A Smith
|
|
|
|
Conference | 9/17/2012 | 9/17/2012 | 9/17/2012 | A | DONE |
Clint A Smith
|
|
|
Today the city of Boise and ACHD conducted a confrence with John Beck And Noel Spencer from Hoffman construction. We explained the stop work order to all dewatering activities offsite. Giving them the requirements to have the stop work order removed. We explained the water quality standards of the state of Idaho DEQ with construction projects, and the requirement with their federal permit , (CGP). we eplainecd that they must report that an ilicit discharge did occur offsite into the MS4 system discharging into the Boise River through the 9th st. outfall. We also gave them a brief training on NTU levels by showing the sample jar of 10, 50, 100, and 800 NTU levels and the differnce between them regarding clarity.
At this time, the stop work order is still posted and waiting on ACHD to give the approval to pump into the MS4.
|
BMP Violation | 9/14/2012 | 9/14/2012 | 9/14/2012 | P | FAIL |
Clint A Smith
|
|
|
STOP WORK ORDER Per BMC 8-17, your site is in violation for discharging of turbid water offsite into the MS4 system. No discharges are allowed offsite. **Stop work order will be lifted once ACHD has approved thatthe discharge meets the water quality standards besed upon the water quality of the Boise Riverabove the 9th street outfall. Not to exceed 25 NTU's based upon the Boise River. Must be proven by lab results. Not visual inspections. 25 NTU's is based over a 10 day continous dewatering. As stated in the Idaho DEQ 401 "Water quality standards" for constuctoin projects.
Will re-inspect once approval from ACHD is given. At the time that dewatering activities will begin, an inspector from either ACHD or City of Boise must be present to view the discharge before become active into the MS4 system.
|
Tracking Control | 9/13/2012 | 9/13/2012 | 9/13/2012 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Re-establish the stabilized construction exit from out of the pit. Must be a minimum of 50ft in length and 10ft wide. Will follow up on 9/15/2012.
|
General Inspection | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | PART |
Clint A Smith
|
|
|
At time time of 08:40 am, the discharge into the storm drain inlet off of Myrtle appears to be clean. Still waiting on lab results from Strata on the first intial samples. Also waiting on ACHD to give a background NTU level for what samples must be based off of to meet the water quality standards for the state of Idaho. Due to dewatering activities occuring for a potental period of more than ten days, the turbidity cannot exceed over 20 NTU's based upon background.
|
Conference | 9/6/2012 | 9/6/2012 | 9/6/2012 | A | DONE |
Kimberly M. Johnson
|
|
|
Boise City was notified by ACHD of dewatering activities occurring at the JUMP project directly to the MS4 prior to plan approval. ACHD issued verbal stop work order on the dewatering activities and an on-site meeting was held with Hoffman, ACHD and Boise City ESC. Dewatering Plan submitted to ACHD same day and was approved 9/7/12.
|
General Inspection | 8/9/2012 | 8/9/2012 | 8/9/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/25/2012 | 7/25/2012 | 7/25/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/10/2012 | 7/10/2012 | 7/10/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/22/2012 | 6/22/2012 | 6/22/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/5/2012 | 6/6/2012 | 6/7/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/23/2012 | 5/23/2012 | 5/24/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/30/2017 | 11/30/2017 | | | |
Michael Zawacki
|
|
|
|
General Inspection | 12/21/2012 | 12/21/2012 | | | |
Bob Archibald
|
|
|
|