Permit Information
Permit NumberESC13-00193
StatusFinaled
Name CAMERON JAYO
Site Address 401 W BOISE HILLS DR
Project NameSomerset Village #3
Customer Number 
ePlanReviewNo
Description
Somerset Village #3
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/11/20194/11/20194/11/2019 CANC
DetailsAndy J. Long
Site Final4/11/20194/11/20194/11/2019PPASS
DetailsAndy J. Long
Subdivision near complete. Most parcel occupied by landscaped homes, open areas stabilized. Remaining projects on Sand Dune are inspected seperately.
General Inspection3/27/20193/27/20193/27/2019 PASS
DetailsMichael Zawacki
One home under construction on Sand Dune.
General Inspection3/12/20193/12/20193/12/2019 PASS
DetailsMichael Zawacki
Sand dune only area remaining.
General Inspection2/25/20192/25/20192/26/2019 PASS
DetailsMichael Zawacki
Few lots remain on sand dune circle.
General Inspection2/8/20192/8/20192/8/2019 PASS
DetailsMichael Zawacki
3 vacant lots remain.
General Inspection1/24/20191/24/20191/24/2019 PASS
DetailsMichael Zawacki
Sand dune circle only area left. Two recently completed homes need to be landscaped. Few empty lots remain.
General Inspection1/9/20191/9/20191/9/2019 PASS
DetailsMichael Zawacki
Sand dune circle only remaining area.
General Inspection12/25/201812/25/201812/26/2018 PASS
DetailsMichael Zawacki
Lower section complete.
Work remains on sand dune, current homes need landscaping and stabalization. Few lots that haven't begun work.
General Inspection12/10/201812/10/201812/10/2018 PASS
DetailsMichael Zawacki
Two homes under construction nearly complete. 3 vacant lots remain.
General Inspection11/23/201811/23/201811/23/2018 CANC
DetailsAndy J. Long
General Inspection11/8/201811/8/201811/8/2018 PASS
DetailsMichael Zawacki
Lower section complete, work on sand dune.
General Inspection10/24/201810/24/201810/24/2018 PART
DetailsMichael Zawacki
2 homes under construction and 3 vacan lot on Sand Dune, only locations left in phase. Silt fence on Boise Hills side needs repair. Both under construction lots need landscaping and erosion repairs.
General Inspection10/9/201810/9/201810/9/2018 PASS
DetailsMichael Zawacki
General Inspection9/24/20189/24/20189/24/2018 PASS
DetailsAndy J. Long
WIP on two SFHs on sand dune. No trackout, loose trash, or discharges/spills on culdesac. Silt fence sediment barrier installed below the two homes due to some erosion between the homes that is not yet repaired.
General Inspection9/7/20189/7/20189/7/2018 CANC
DetailsAndy J. Long
General Inspection8/23/20188/23/20188/23/2018 PART
DetailsMichael Zawacki
All work remaining is on Sand Dune. Will need maintenance before rain season.
General Inspection8/8/20188/8/20188/8/2018 PASS
DetailsMichael Zawacki
Lower section completed. Work is currently on sand dune, neighborhood BMPs in place.
General Inspection7/24/20187/24/20187/24/2018 PASS
DetailsMichael Zawacki
2 homes under construction on Sand Dune. Lower section of phase done.
General Inspection7/9/20187/9/20187/9/2018 PASS
DetailsMichael Zawacki
Lower section complete. Only work is on Sand Dune.
General Inspection6/22/20186/22/20186/22/2018 PASS
DetailsMichael Zawacki
General Inspection6/7/20186/7/20186/7/2018 PASS
DetailsMichael Zawacki
Entire lower section of neighborhood complete. Developer never responded to question of Sanddune being part of project.
General Inspection5/23/20185/23/20185/24/2018 PASS
DetailsAndy J. Long
2 SFHs in progress. No trackout. DI bag on upside of Sand Dune has been changed out as requested.
General Inspection5/8/20185/8/20185/10/2018 CANC
DetailsAndy J. Long
General Inspection4/23/20184/23/20184/23/2018 PASS
DetailsMichael Zawacki
Last home nearly completed.
General Inspection4/6/20184/6/20184/6/2018 PASS
DetailsMichael Zawacki
One home left under construction. Area clean.
General Inspection3/22/20183/22/20183/22/2018 PASS
DetailsMichael Zawacki
WIP. Trash box is full and starting to spill over. Last home in development.
General Inspection3/7/20183/7/20183/7/2018 PASS
DetailsMichael Zawacki
WIP. Lot clean.
General Inspection2/20/20182/20/20182/20/2018 PASS
DetailsMichael Zawacki
Working on final home in development.
General Inspection2/5/20182/5/20182/5/2018 PASS
DetailsMichael Zawacki
Final home under construction
General Inspection1/19/20181/19/20181/19/2018 PASS
DetailsMichael Zawacki
One home left under construction. Rest of phase has final stabaluization.
General Inspection1/4/20181/4/20181/4/2018 PASS
DetailsMichael Zawacki
Last lot has home being built.
General Inspection12/20/201712/20/201712/20/2017 PART
DetailsMichael Zawacki
One home left under construction.
General Inspection12/5/201712/5/201712/5/2017 PART
DetailsMichael Zawacki
1 SFH under construction. Scrap lumber piled, no garbage containment. Load of lumber in street blocking lane.
General Inspection11/20/201711/20/201711/20/2017 CANC
DetailsAndy J. Long
General Inspection11/3/201711/3/201711/3/2017 CANC
DetailsAndy J. Long
General Inspection10/19/201710/19/201710/19/2017 PASS
DetailsMichael Zawacki
1 SFH under construction. Perimeter controls in place and dirt contained to site.
General Inspection10/4/201710/4/201710/4/2017 CANC
DetailsAndy J. Long
General Inspection9/19/20179/19/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection9/4/20179/4/20179/5/2017 CANC
DetailsAndy J. Long
General Inspection8/18/20178/18/20178/18/2017 PASS
DetailsAndy J. Long
General Inspection8/3/20178/3/20178/3/2017 PASS
DetailsAndy J. Long
One SFH and the club house are in proress. 1 open lot remaining. No discharges, sediment runoff issues. Minimal activity. No corrections requested.
General Inspection7/19/20177/19/20177/19/2017 CANC
DetailsMelissa Jannusch
General Inspection7/4/20177/4/20177/5/2017 CANC
DetailsAndy J. Long
General Inspection6/19/20176/19/20176/19/2017 PASS
DetailsMelissa Jannusch
WIP on SFH and clubhouse. I vacant lot remaining. Subdivision BMPs ok. No ESC corrections.
General Inspection6/2/20176/2/20176/2/2017 PASS
DetailsAndy J. Long
WIP on clubhouse and last home on Mesa Grande. DI bag below clubhouse is in good condition. Lower site has perimeter wattle installed. No loose trash or debris. No corrections at this time.
General Inspection5/18/20175/18/20175/18/2017 CANC
DetailsAndy J. Long
General Inspection5/3/20175/3/20175/3/2017 CANC
DetailsMelissa Jannusch
General Inspection4/18/20174/18/20174/18/2017 PASS
DetailsMelissa Jannusch
WIP. No ESC violations observed.
General Inspection4/3/20174/3/20174/3/2017 PASS
DetailsMelissa Jannusch
Subdivision BMPs ok. No trackout.
General Inspection3/17/20173/17/20173/17/2017 CANC
DetailsAndy J. Long
General Inspection3/2/20173/2/20173/2/2017 PASS
DetailsMelissa Jannusch
No WIP. silt fence still needs repair.
General Inspection2/15/20172/15/20172/15/2017 PASS
DetailsMelissa Jannusch
No W?IP. Silt fence still needs to be repaired.
General Inspection1/31/20171/31/20172/1/2017 PASS
DetailsMelissa Jannusch
No WIP snow covered conditions. Check for repair of silt fence once conditions improve.
No corrections
General Inspection1/16/20171/16/20171/19/2017 PEND
DetailsMelissa Jannusch
Damaged sediment perimenter fence. Fix when conditions allow. No construction activity occuring . No muddy runoff observed.
General Inspection12/30/201612/30/201612/30/2016 CANC
DetailsAndy J. Long
General Inspection12/15/201612/15/201612/19/2016 PEND
DetailsAndy J. Long
No subdivision or SFH activity on Sand Dune. Need to repair section of perimeter BMPs where access to backyards on Painted Rock was created... No sediment runof or other issues observed
General Inspection11/30/201611/30/201612/2/2016 CANC
DetailsAndy J. Long
General Inspection11/15/201611/15/201611/15/2016 PEND
DetailsAndy J. Long
No issues on culdesac lots. Temporary access to backyards of Painter Rock homes still needs erosion and sediment controls installed. Home below access is not yet complete and backyard not yet landscaped...
General Inspection10/31/201610/31/201610/31/2016 PART
DetailsAndy J. Long
No SFH activity on culdesca. Perimeter sediment controls and vegetation established on banks prevent significant sediment runoff.

Correction request to RP and Shane Jayo:
- road to access backyards on Painted Rock should be hydroseeded and sediment controls re-installed
General Inspection10/14/201610/14/201610/14/2016 CANC
DetailsAndy J. Long
General Inspection9/29/20169/29/20169/29/2016 CANC
DetailsAndy J. Long
General Inspection9/14/20169/14/20169/14/2016 PASS
DetailsAndy J. Long
General Inspection8/30/20168/30/20168/30/2016 PASS
DetailsEvan Jenkins
General Inspection8/15/20168/15/20168/15/2016 PASS
DetailsAndy J. Long
One completed home on Sand Dune, no active SFHs at this time.

Sediment control BMPs (wattles, DI filter bags) are installed and in decent condition. No trackout, dust issues). No erosion rills or gullies observed around perimeter and along steep bank on Crestline.

Some debris has been dumped on open lots and should be removed by Jayo .
General Inspection7/29/20167/29/20167/29/2016 PASS
DetailsAndy J. Long
Only 3 open parcels left. Subdivision DIs have protection, open lots on Mesa Verde have perimeter sediment control wattles installed. No violations observed.
General Inspection7/14/20167/14/20167/14/2016 PASS
DetailsEvan Jenkins
wip: no issues observed at this time of inspection
General Inspection6/29/20166/29/20166/29/2016 PASS
DetailsAndy J. Long
General Inspection6/14/20166/14/20166/14/2016 PASS
DetailsAndy J. Long
General Inspection5/30/20165/30/20165/30/2016 CANC
DetailsEvan Jenkins
Holiday
General Inspection5/13/20165/13/20165/13/2016 PASS
DetailsAndy J. Long
WIP on SFHs on Painted Feather and and Mesa Verde. Trash and materials contained, DIs have sediment filters, and perimeter wattles are installed. No discharges or trackout from site. Somerset Village is near capacity. No corrections issues.
General Inspection4/28/20164/28/20164/28/2016 PASS
DetailsEvan Jenkins
General Inspection4/13/20164/13/20164/13/2016 PASS
DetailsAndy J. Long
WIP on one house in Somerset #3 (Sand Dune). Hillside stabilization and perimeter BMPs have remained in good condition. No trackout or discharges from Sand Dune area to Boise Hills.
No corrections at this time.
General Inspection3/29/20163/29/20163/29/2016 PASS
DetailsAndy J. Long
General Inspection3/14/20163/14/20163/14/2016 PASS
DetailsEvan Jenkins
No activity occuring
General Inspection2/26/20162/26/20162/26/2016 PASS
DetailsEvan Jenkins
No Activity at time of inspection
General Inspection2/11/20162/11/20162/11/2016 PASS
DetailsAndy J. Long
WIP on first SFH by Jayo Construction. Both homebuilder and developer will maintain BMPs per Shane. Perimeter BMPs, DI bags, and slope stabilization are currently in good shape. Will need stockpile protection if it is not backfilled - Shane stated it will not stay on that upper lot on Sand Dune on the slope.

No corrections issued at this time. Will continue to monitor since this is first construction on this phase in over 1 year.
General Inspection1/27/20161/27/20161/27/2016 CANC
DetailsEvan Jenkins
General Inspection1/12/20161/12/20161/12/2016 PASS
DetailsEvan Jenkins
No issues observed at this time. no activitiy
General Inspection12/28/201512/28/201512/28/2015 CANC
DetailsAndy J. Long
General Inspection12/11/201512/11/201512/11/2015 PASS
DetailsAndy J. Long
No sediment runoff or issues. Slopes are stabile and vegetated. Ken with Jayo was on site cleaning collected sediment around the inlet.

Approved.
General Inspection11/26/201511/26/201511/27/2015 PART
DetailsBill VanDegrift
called rp about trackout from project. left message and set up reinspection
General Inspection11/11/201511/11/201511/12/2015 CANC
DetailsAndy J. Long
General Inspection10/27/201510/27/201510/27/2015 PASS
DetailsEvan Jenkins
General Inspection10/12/201510/12/201510/13/2015 PASS
DetailsAndy J. Long
No subdivision activity. Sediment controls installed. No erosion issues observed. No SFH work yet in upper section.
General Inspection9/25/20159/25/20159/25/2015 PASS
DetailsEvan Jenkins
No issues observed at this time
General Inspection9/10/20159/10/20159/10/2015 PASS
DetailsAndy J. Long
No construction activity. Perimeter BMPs and DI sediment protection provided. Jayo crew recently retrenched wattles below on Painted Feather. No trackout or discharges observed.
General Inspection8/26/20158/26/20158/26/2015 PASS
DetailsAndy J. Long
No construction activity in Somerset 3. Site is being actively monitored and BMPs maintained. Some additional wattles have been recently installed on the uphill side of the culdesac and DI bags have been emptied and re-installed. No corrections issued.
General Inspection8/11/20158/11/20158/11/2015 PART
DetailsAndy J. Long
No activity in Somerset Village 3. Perimeter silt fence and slope vegatetation are in decent condition and keeping sediment on site.
Correction:
-sweep gutter around inlet on Crestline. Conduct maintenance on DI bag to prevent over filling and breakage. Currently near 50% capacity
General Inspection7/27/20157/27/20157/27/2015 PART
DetailsEvan Jenkins
No Activity at time of inspection. After recent rains, curbs on Northside of culdesac needs to be swept out
General Inspection7/10/20157/10/20157/10/2015 PASS
DetailsEvan Jenkins
General Inspection6/25/20156/25/20156/25/2015 PASS
DetailsAndy J. Long
No activity at site. Perimeter BMPs (silt fence and wattles) are installed with no significant breaches. Culdesac is free of loose sediment. Inlet bag has been recently emptied and reinstalled. No corrections necessary at this time.
General Inspection6/10/20156/10/20156/10/2015 PASS
DetailsEvan Jenkins
No Activity has occured yet
General Inspection5/26/20155/26/20155/26/2015 PART
DetailsAndy J. Long
No activity or construction yet. BMPs installed. No new rills or erosion issues occuring. Handling recent thundstorms without trouble with heavy runoff.

Requests:
-Remove full DI bag on Crestline and Boise Hills. Upper areas have been stabilized so this is now capture all sediment and debris from further up Crestline causing slow drainage. Developers choice to reinstall.
- Conduct maintenance on DI bag on upper side of Sand Dune. It is full but should stay in place for future SFHs.

Verbal correction given to developer via telephone
General Inspection5/11/20155/11/20155/11/2015 PART
DetailsEvan Jenkins
Vandalism had taken place to a small portion of the silt fence up top that needs to be fixed. No other ESC issues at this time
General Inspection4/24/20154/24/20154/24/2015 PART
DetailsAndy J. Long
No vertical construction occuring yet. Hillsides staying stable. Perimeter BMPs are installed and containing sediment.

Correction:

Need to clean DI bag and accumulated sediment around the stormdrain on Crestline @ Boise Hills.
General Inspection4/8/20154/9/20154/9/2015PPART
DetailsAndy J. Long
Perimeter wattles, silt fence, and hillside vegetation has kept sediment on site. Culdesac is clean. No further washouts have occurred on open parcels. No individual homes in progress yet.

Need to clean up dried washout and empty top inlet off Crestline.
General Inspection4/8/20154/8/20154/8/2015 CANC
DetailsAndy J. Long
rescheduled
General Inspection3/24/20153/24/20153/25/2015 PASS
DetailsAndy J. Long
General Inspection3/9/20153/9/20153/9/2015 PASS
DetailsEvan Jenkins
No discharges occuring from disturbed areas. Site has been recently swept.
No Issues at this time
General Inspection2/20/20152/20/20152/20/2015 CANC
DetailsAndy J. Long
General Inspection2/5/20152/5/20152/5/2015 PART
DetailsAndy J. Long
Site hillsides that have been tracked and hydroseeded, drainage divirsion channel and silt fence perimeter are preventing erosion and keeping sediment from leaving site

Corrections needed:

1. Clean out upper DI bag on entrance to culdesac and sweep up accumulated dirt and sand around inlet.

2. Assist in cleanup of illicit cement washout done by Somerset Village SFH contractors and post signage preventing more washout. Use designated pit.


General Inspection1/21/20151/21/20151/21/2015 PASS
DetailsEvan Jenkins
General Inspection1/6/20151/6/20151/6/2015 PASS
DetailsEvan Jenkins
Corrections have been made per Andy. No ESC issues at this time of inspection
Random Inspection12/22/201412/22/201412/22/2014PPASS
DetailsAndy J. Long
Jayo ESC foreman onsite making corrections, reinforcing wattles. Being proactive. No trackout or sediment runoff from site observed.
General Inspection12/18/201412/18/201412/18/2014 PART
DetailsAndy J. Long
Perimeter BMPs and overall conditions at upper section of Somerset 3 is in compliance. No discharges or sediment runoff offsite.

1 violation & issue observed:
Concrete contractor washed out in old pit, slurry and water has trickled down hill beyond pit and underneath the retaining - exposing an issue about the drainage there that could undermine the retaining wall.

Correction:

-Clean up concrete washout waste.
- Improve and line new washout pit or decommision.
- Fix retaining wall issue
Random Inspection12/3/201412/3/201412/3/2014PPASS
DetailsAndy J. Long
Correction requests from 11/6 inspection inspection are complete. No new issues at site, and is currently handling runoff well and containing sediment. Somerset Village #3 is currently in compliance.
General Inspection11/21/201411/21/201411/21/2014 PASS
DetailsAndy J. Long
No activity. No erosion or sediment runoff occuring currently. Still covered in snow, though will be melting through weekend. Perimeter silt fence, stabilized slopes, and inlet protection are the BMPs.
Random Inspection11/6/201411/6/201411/6/2014PPART
DetailsAndy J. Long
Upper phase of Somerset Village 3 withheld most of the weekends storm fairly well. Lower slope stabilization, perimeter silt fence, and slope drain rip rap worked to manage the runoff, prevent significant erosion and contain sediment. There is one area on the uphill side of the culdesac where water did not go down diversion channel and went under retaining wall creating a rill of erosion on one of the parcels. Silt and sand was trapped behind wattle but some did flow into the DI bag on upside of culdesac.

Corrections:
1. Empty out DI bag
2. Fill in hole where water entered to seep under retaining wall.
3. Muck out/shovel sediment/mud accumulated behind wattles.
4. Consider hydroseeding or installing a wattle up above the diversion channel on top of retaining wall.
General Inspection11/4/201411/4/201411/4/2014 PASS
DetailsEvan Jenkins
Some minor Rill Erosion had taken place this past Saturdays Rain Event, but no discharge offsite. BMP's still in good shape. no esc issues at this time
General Inspection10/20/201410/20/201410/20/2014 PASS
DetailsEvan Jenkins
General Inspection10/3/201410/3/201410/3/2014 PASS
DetailsEvan Jenkins
BMP's still in place. No esc issues at this time. no activity
General Inspection9/18/20149/18/20149/18/2014 PASS
DetailsAndy J. Long
No activity. Site has good perimeter controls and no sediment leaving site currently. No corrections at this time, but will need to look into stabilization with vegetation if no building is to occur this fall.
Random Inspection9/3/20149/3/20149/3/2014APASS
DetailsAndy J. Long
Corrections on Somerset Village #3 have been completed. Additional wattles were installed on upper side of culdesac, the DI bags and gutters were cleaned/maintained. No new corrections necessary. Site is in compliance.
General Inspection8/25/20148/25/20148/25/2014 PART
DetailsAndy J. Long
Corrections required after last night's precipitation. Most BMPs were effective, but there were some breaches over straw wattles.

1. Some sediment runoff from area above culdesac has flowed into DI on Sand Dune.

2. Sediment also accumulated at main DI on Crestline. Need to maintain DI bag and shovel/remove collected sediment.

Need to get schedule of stabilization or construction for bare ground.

Verbal CN issued to RP via phone.
General Inspection8/8/20148/8/20148/8/2014 PASS
DetailsEvan Jenkins
no esc issues at this time
General Inspection7/24/20147/24/20147/24/2014 PASS
DetailsAndy J. Long
No activity at time of inspection. DI bags are installed, wattles at toe of slope protecting culdesac, and the silt fence perimeter is holding up nicely.

Stabiliztion in progress, no corrections at this time.
Random Inspection7/9/20147/9/20147/9/2014PPASS
DetailsAndy J. Long
No activity at time of inspection. BMPS and hillside stabilization has proven effective since SWO issued and resolved. No violations and site is currently in compliance. They have installed two retaining walls at the top and bottom of sight.
General Inspection7/4/20147/4/20147/7/2014 CANC
DetailsAndy J. Long
holiday
General Inspection6/19/20146/19/20146/19/2014 PART
DetailsEvan Jenkins
Minimal Trackout. It appears from the Public driving through the site.
No other ESC issues
General Inspection6/4/20146/4/20146/4/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
retaining wall complete
drainage ditch completed
General Inspection5/20/20145/20/20145/20/2014 PASS
DetailsEvan Jenkins
Only ESC Issue;
Site Map shows a catch basin/ditch that runs along the entire south side of new phase from Crestline Rd. to the present catch basin/ditch down along the south side of phase 3 to tie into existing. Called Cameron and left VM disclosing this issue, and gave him till our next inspection (2 Weeks) to address issue (Due to Dry Season) to install this drainage ditch or stop work order will be issued to get back into compliance with their SWPPP Plan.
General Inspection5/5/20145/5/20145/5/2014 PASS
DetailsAndy J. Long
Culdesac is paved with most sidewalks installed. Perimter silt fences in good condition. New storm drains have inlet protection No trackout to Crestline or discharges to stormwater pond observed.
Note:
New sand and grease interceptor installed for treatment of water before entering the pond. Should install rocks (rip rap) at the spout to prevent gullying in large storm events.
Random Inspection4/18/20144/18/20144/18/2014APASS
DetailsAndy J. Long
Curbing for culdesac is installed. Sidewalk as well. No corrections required. Water truck for dust and brooms on site.
BMP Violation4/8/20144/8/20144/8/2014PPASS
DetailsAndy J. Long
SWO has been removed. Re-inspection found the site to be in compliance with permit conditions and approved ESC plan.

Perimeter BMPs have been re-installed completely since initial correction notice

An exception for the construction access is allowed due to the fact road mix shall be laid down in an early phase of the project. Contractor Terry Wright will increase sweeping during this phase to address any trackout issues onto Crestline.

Approved for construction/excavation. All parcel holds have been removed.
Conference3/31/20144/1/20144/1/2014PCANC
DetailsAndy J. Long
Conference with Wright construction to confirm that the SWO on site can be lifted and construction can resume. Re-inspection fee already paid.

Tentatively re-scheduled due to rain
Random Inspection3/27/20143/27/20143/27/2014PPASS
DetailsAndy J. Long
No work has been conducted during SWO. New silt fence installed in areas where old one was com promised. Banks have been hydroseeded. No sediment runoff from site observed in gutter. Approved. Jayo/Wright construction to call once they are ready to re-start project. Re-inspection fee has been paid.
Random Inspection3/17/20143/17/20143/17/2014PPASS
DetailsAndy J. Long
Follow up inpsection to check if corrections have been made.

Additional silt fence has been placed below existing fence that was failed in certain areas. Hillslope has also been modified to have berms to contain runoff. No new violations. No construction work other than BMP maintenance appears to have occured. Wright Construction is to call ESC division to lift SWO when ready to begin work.
Stop Work Order3/5/20143/5/20143/7/2014ADONE
DetailsAndy J. Long
NOTE: This entry is to show that SWO was issued 12/4/2013. Site will be re-inspected today, 3/5/2014. This is for tracking purposes only, no current status change to the SWO in effect.
General Inspection3/4/20143/5/20143/5/2014PPEND
DetailsAndy J. Long
call before to meet // cameron Phone #: ###-####

Onsite meeting and walk through with Cameron Jayo and Jerry Wright (Wright Construction) who will be complete the remainder of the subdivision development.

Jayo's ESC crew will provide additional silt fencing between existing fence(to be removed) and the stormwater pond, as well as area between Somerset #3 and Somerset Village.

Wright construction will make earthen berm at the end of the graded/in-fill area.

SWO is still in effect until these ESC corrections are made. Plan is to have site completed and ready for construction on Monday 3/10/2014. Jerry is to call Evan or myself.

Alerted Cameron Jayo about the re-inspection fee applied to the permit which must be paid for SWO to be lifted.
General Inspection2/28/20142/28/20143/4/2014 CANC
DetailsEvan Jenkins
SWO Still Issued. Andy stated Jayo contacted him to request an Inspection to remove SWO. Told andy to disclose to Jayo, they need to contact PDS front desk to schedule an inspection. This should occur sooon
General Inspection2/13/20142/13/20142/13/2014 PEND
DetailsAndy J. Long
No construction activity. BMPs are in process of maintenance, recent issues addressed. Wattles were re-trenched and a diverision channel created. No sediment discharges observed. Ground is still thawing and more precipitation is expected this week.

Remaining corrections to lift SWO:
1. Construction entrance
2. Repair silt around project in areas where stockpile has broken stakes.
3. Request ESC inspection for approval
Random Inspection1/29/20141/29/20141/29/2014PPART
DetailsAndy J. Long
SWO is being obeyed, but there is a failed wattle below culdesace entrance that is allowing some sediment to flow in storm drain and pond.

Corrections:
1. Fix wattle by adding additional trenched wattle
(a diversion channel may also be helpful to divert flow away from roady.)
2. Empty DI bag when runoff has stopped.
General Inspection1/21/20141/21/20141/21/2014 PASS
DetailsAndy J. Long
No construction acitivity. SWO still in effect. Construction entrance needs to be installed. Jayo is supposed to schedule re-inspection when work will commence. Road was swept and perimeter wattles prevented runoff to the streets.
General Inspection1/6/20141/6/20141/6/2014 PEND
DetailsAndy J. Long
No activity since SWO was issued. Corrections not yet complete. Jayo will call for re-inspection to lift SWO when corrections are complete.
General Inspection12/20/201312/20/201312/20/2013 PEND
DetailsAndy J. Long
SWO still in effect. No activity. Corrections partially complete. No work allowed until re-inspection is conducted and approved. Reinspection fee will apply
BMP Violation12/4/201312/5/201312/5/2013PFAIL
DetailsAndy J. Long
Follow up on Correction Notice for multiple BMP Violations.

Corrections completed:
1. Street was swept with push broom and blower
2. DI filter bag was removed and replaced.
3. Jayo employee Ken is on-site continuing to make corrections.

Corrections not complete:

1. Need to install wattles/appropriate perimeter BMP at base of excated hillside downhill from the construction entrance.
2. Need to repair/re-install curbside wattle above and below construction entrance. 3. Need to replenish construction entrance with full 50 feet before work may resume .

Action:
Stop Work Order until all corrections complete
Call in re-inspection before work can resume (re-inspection fee will apply)
Conditions: no precipitation forecasted in next week; ground and stockpiles are currently frozen slowing the BMP installation process
Complaint Inspection12/4/201312/4/201312/4/2013PFAIL
DetailsEvan Jenkins
Correction Notice Issued:
Multiple BMP violations.
Contacted Cameron Jayo, he eventually called me back and stated he will fix the issues. I disclosed he has 24hrs from today to address/fix violations, or a Stop Work Order will be Issued and possible Notice of Violation
Tracking Control11/27/201311/27/201311/27/2013PCANC
DetailsEvan Jenkins
Contacted RP Cameron Jayo via cell and left VM. Described the trackout occuring at each active lot. Area needs swept up by end of day today 11-27-13 due to holiday. WIll follow up this afternoon
General Inspection11/27/201311/27/201311/27/2013 PART
DetailsEvan Jenkins
Contacted RP Cameron Jayo via cell and left VM. Described the trackout occuring at each active lot. Area needs swept up by end of day today 11-27-13 due to holiday. WIll follow up this afternoon
General Inspection11/12/201311/12/201311/12/2013 PASS
DetailsAndy J. Long
Installing stormwater structures on culdesac at time of inspection. Silt fence is installed along back slope and is containing stockpile. Construction entrance is in use. Some minor track out observed, but can be sweeped at end of day. No corrections at this time.
General Inspection10/25/201310/25/201310/25/2013 PASS
DetailsEvan Jenkins
General Inspection10/10/201310/10/201310/10/2013 PART
DetailsEvan Jenkins
Contacted and left voicemail with Cameron.
Construction signage needs replaced, BMP's need to be maintained, trackout issue near the intersection of boise hills dr & painted rock.
General Inspection9/25/20139/25/201310/1/2013 PASS
DetailsTony Young
General Inspection9/10/20139/10/20139/17/2013 PASS
DetailsTony Young
Conference8/26/20138/26/20138/26/2013ADONE
DetailsEric Strole
General Inspection8/23/20138/23/20138/26/2013 FAIL
DetailsDixie Fellows
meet with eric....maintain all perimeter and DI protection...need to complete by wed pm8-28-13 and i will reinspect on 8-29-13. they received a verbal and written correction
General Inspection8/26/20138/26/20138/26/2013ACANC
DetailsEric Strole
meet dixie to discuss job
General Inspection8/8/20138/8/20138/9/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/24/20137/24/20137/24/2013 PART
DetailsKimberly M. Johnson
Jayo confirmed area has been tackified. Written correction notice posted: 1. Extend Silt fence to south as shown on plan. 2. Install existing silt fence as per specification (trenched in to proper depth and stakes driven in to proper depth).
General Inspection7/9/20137/9/20137/9/2013 PART
DetailsKimberly M. Johnson
Silt fence has been moved but needs maintenance and extended. Crust over all of disturbed area no mulch. Called Cameron to ask if it has been tackified for temporary stabilization purposes, but he wasn't sure. Will ask and call back. Also discussed the need to return the adjacent lot to pre-exisitng condition.
BMP Violation6/21/20136/21/20136/21/2013PFAIL
DetailsKimberly M. Johnson
Wrtiten Correction Notice: Install SF per plan; stabilized adjacent property that was disturbed as a result of staging located at 415 crestline
BMP Violation6/4/20136/4/20136/4/2013AFAIL
DetailsKimberly M. Johnson
Written Correction notice and voicemail left: 1. signage needs to be moved to construction access; it is currently located at top of hill on unpermitted lot. 2. Distrubed lot to south needs permitted or restored to pre-existing condition. This disturbed lot has the potential to contribute signifiant turbid run-on. 3. The silt fence is not installed where the plan shows it. Install silt fence along the top of the slope on the west side.
Site Preparation5/31/20135/31/20135/31/2013PFAIL
DetailsKimberly M. Johnson
Site Prep coupled with dust complaint. No dust at time of inspection but discussed complaint and dust control requirement with RP. Project has disturbed adjacent property to the south along Crestline for construction access and parking. Told RP that he needs to get approval from the landowner to permit it as such or restore it pre-existing condition. Silt fence not installed as per plan. It is currently installed across the draw. Silt fence needs installed at top of slope on NW side as per plan. Construction entrance not installed yet; RP said it would be complete by Monday afternoon. Must move signage to project construction entrance. Cannot park, stage, work, ect on any of the property south of the propertly line stakes unless the adjacent lot is permitted.
Site Preparation5/22/20135/24/20135/22/2013ANR
DetailsClint A Smith
Work has not begun. Have not staged equipment or materials. BMP have not been installed either.
General Inspection5/22/20135/22/20135/22/2013 NR
DetailsKimberly M. Johnson
Site Preparation4/25/20134/26/20134/30/2013ANR
DetailsClint A Smith
Have not begun phase 3 to the project.
Site Preparation4/25/20134/25/20134/25/2013 CANC
DetailsClint A Smith