Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberESC17-00018
StatusIssued
Name JIM CONGER
Site Address 3901 S ECKERT RD
Project NameDallas Harris Estates Sub No16
Customer Number 
ePlanReviewNo
Description
New residential subdivision development, rough grading, and installation of infrastructure & utilities. Silt fence perimeter in designated areas along Eckert and the eastern border must be installed prior to earthwork. Area between stormwater ponds and River to be undisturbed including existing Greenbelt path to act as a vegetated buffer area. Construction entrances required at Eckert and Warm Springs by-pass. Dewatering plans submitted with flow rates, treatment options, and contigency plan options. Option 1 is to use frac tank with discharge to pasture across Warm Springs Bypass and into Warm Springs Creek. In addition to frac tank treatment, a series of settling ponds, outlet sediment control and other means to meet WQS. CGP tracking # IDR12B281. Site preparation and pre-construction inspection/meeting required, call 608-7070.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/13/20208/13/20208/13/2020 PASS
DetailsMichael Zawacki
One home under construction. No issues at site.
General Inspection7/14/20207/14/20207/14/2020 PASS
DetailsMichael Zawacki
General Inspection6/29/20206/29/20206/29/2020 PASS
DetailsMichael Zawacki
One home in neighborhood under construction.
No issues.
General Inspection6/12/20206/12/20206/12/2020 CANC
DetailsAndy J. Long
General Inspection5/28/20205/28/20205/28/2020 PASS
DetailsMichael Zawacki
WIP on one home. No issues at site.
General Inspection5/13/20205/13/20205/13/2020 PASS
DetailsMichael Zawacki
1 home under construction, lot is clean. No workers on site.
General Inspection4/28/20204/28/20204/28/2020 PASS
DetailsMichael Zawacki
One home under construction, few vacant lots. Washout pan was overflowed, talked to builder RP and he said he'd get it cleaned.
General Inspection4/13/20204/13/20204/13/2020 PASS
DetailsMichael Zawacki
Evans is doing construction on west side. No wind blown trash or issues. Site is clean.
General Inspection3/27/20203/27/20203/27/2020 PASS
DetailsMichael Zawacki
Ben Evan doing a few homes on SE. Area kept clean. All NW homes done.
General Inspection3/12/20203/12/20203/12/2020 PASS
DetailsMichael Zawacki
Work on a few homes on west of site. Any issues I contact builder. No issues at site.
General Inspection2/26/20202/26/20202/26/2020 PASS
DetailsMichael Zawacki
All work east of Eckert completed.
1 home framed and under construction to west, 1 home just getting forms delivered to site.
Ecopans on site.
General Inspection2/11/20202/11/20202/11/2020 PASS
DetailsMichael Zawacki
Phase on east is all completed, no more lots. One home has begun on west.
General Inspection1/27/20201/27/20201/27/2020 PASS
DetailsAndy J. Long
General Inspection1/10/20201/10/20201/10/2020 PASS
DetailsMichael Zawacki
Work has begun on phase 2
General Inspection12/26/201912/26/201912/26/2019 CANC
DetailsAndy J. Long
General Inspection12/11/201912/11/201912/11/2019 PASS
DetailsMichael Zawacki
All current work completed. Phase on SW hasn't begun.
General Inspection11/26/201911/26/201911/26/2019 PASS
DetailsMichael Zawacki
All work in neighborhood about complete. Will need to do final perimeter walk to check for trash cleanup and BMP removal.
General Inspection11/11/201911/11/201911/12/2019 PASS
DetailsAndy J. Long
General Inspection10/25/201910/25/201910/25/2019 PASS
DetailsMichael Zawacki
All homes look completed. Will need to walkthrough neighboring parcel to make sure blown trash is cleaned up and BMPs removed from area.
General Inspection10/10/201910/10/201910/11/2019 CANC
DetailsAndy J. Long
General Inspection9/25/20199/25/20199/25/2019 PASS
DetailsMichael Zawacki
Neighborhood almost completed. Will need to do site walk around Idaho Power property before closing permit.
General Inspection9/10/20199/10/20199/10/2019 PASS
DetailsMichael Zawacki
Neighborhood nearly completed. Area is clean, no issues.
General Inspection8/26/20198/26/20198/26/2019 PASS
DetailsMichael Zawacki
Site is overall clean and nearly completed. Any issues will be directed toward individual home RPs.
General Inspection8/9/20198/9/20198/9/2019 CANC
DetailsAndy J. Long
General Inspection7/25/20197/25/20197/25/2019 PASS
DetailsMichael Zawacki
Neighborhood is clean. Very little activity remainining.
General Inspection7/10/20197/10/20197/10/2019 PASS
DetailsMichael Zawacki
All lots almost completed. No major issues anywhere on site.
General Inspection6/25/20196/25/20196/25/2019 PASS
DetailsMichael Zawacki
Most homes completed, work on commercial daycare. Some dirt on road from landscape crews. No major issues. ill need perimeter walk along wetlands before permit closed.
General Inspection6/10/20196/10/20196/11/2019 PASS
DetailsMichael Zawacki
Neighborhood is clean, almost all work completed. No issues, DI protection still installed.
General Inspection5/24/20195/24/20195/24/2019 PASS
DetailsMichael Zawacki
Site is clean. Daycare has new entrance and washout dug. Very few workers at site.
General Inspection5/9/20195/9/20195/9/2019 PASS
DetailsMichael Zawacki
All homes nearly completed and landscaped. No trash or dirt issues, some messy stucco.
General Inspection4/24/20194/24/20194/25/2019 PASS
DetailsMichael Zawacki

Most homes are completed. Lots of landscapers on site. Row of blackrock homes being landscape, looks like waste is being pushed down the block and there is some piles towards end of street. Wattle behind homes on Harris Ranch Ave can be removed and trash behind fence should be clean. No major ESC issues.
General Inspection4/9/20194/9/20194/10/2019 PART
DetailsMichael Zawacki
Some small wind blown trash scattered around, such as bottles and pieces of plastic. Some trackout and dirt on road from landscapers.
General Inspection3/25/20193/25/20193/26/2019 PASS
DetailsAndy J. Long
Subdivsion storm drains have sediment protection installed, streets and gutters are clean. SFHs permitted seperately. Most remaining construction is along Rivernest by Blackrock Homes.
General Inspection3/8/20193/8/20193/12/2019 CANC
DetailsAndy J. Long
General Inspection2/21/20192/21/20192/26/2019 PASS
DetailsMichael Zawacki
Site is clean, lots still need to be stabalized.
General Inspection2/6/20192/6/20192/6/2019 PASS
DetailsMichael Zawacki
Lots are frozen, no trackout. Did not see much loose trash or major violations. Homes in all stages of construction. Wattles installed behind iron fence by wetlands area.
General Inspection1/22/20191/22/20191/22/2019 PASS
DetailsAndy J. Long
SFHs in progress. Subdivision BMPs installed. No corrections requested
General Inspection1/7/20191/7/20191/7/2019PPASS
DetailsAndy J. Long
Subdivision BMPs are installed. No trackout from subdivision. SFHs permitted seperately. Inspection of stormwater ponds show it is functioning properly, there are new plantings along the banks for the sediment forebay and the stormwater infiltration pond have been.

No corrections for subdivsion.
General Inspection1/1/20191/1/20191/4/2019 CANC
DetailsAndy J. Long
General Inspection12/17/201812/17/201812/17/2018 PASS
DetailsMichael Zawacki
All workers paking in street and avoiding muddy lots. Trash is mostly contrained, no big messes. Concrete washouts being used.
General Inspection11/30/201811/30/201811/30/2018 CANC
DetailsAndy J. Long
General Inspection11/15/201811/15/201811/15/2018 PASS
DetailsMichael Zawacki
Perimeter BMPs can be removed. Northwest lot is still bare, every where else is built and stabalized.
General Inspection10/31/201810/31/201811/1/2018 PASS
DetailsAndy J. Long
SFHs in progress by Hunter, Blackrock, and ZEC. Storm drains have sediment protection, concrete washout containers provided , and no significant trackout or loose trash. Approved.
General Inspection10/16/201810/16/201810/18/2018PPASS
DetailsAndy J. Long
Subdivsion BMPs installed. LOts of earth work this week, subdivision will need sweeping end of week. Stormdrains have sediment protection. Concrete washouts provided.
General Inspection10/4/201810/4/201810/4/2018 PASS
DetailsMichael Zawacki
No issues during rain event. Workers are parking on roads. No runoff issues.
General Inspection9/19/20189/19/20189/20/2018 PART
DetailsMichael Zawacki
Hunter concrete washouts have been moved, road still needs to be cleaned in old location, some spills in new location. Most builders need to pick up trash from their lots and clean lumber scraps. Roads are clean of tracking.
ZEC contractors have dumped stucco mix and washout on lot, also newest foundation has bunch of dirt on sidewalk.
Blackrock has been much cleaner, have new large lined washout well marked, old washout material should be removed, is in a big pile.
General Inspection8/31/20189/4/20189/5/2018APASS
DetailsAndy J. Long
Subdivision BMPs installed. Need to improve secondary containment and maintenance around the roll off concrete washouts. Will work with HH and TVCW to get a better solution.
General Inspection8/21/20188/21/20188/21/2018 PASS
DetailsMichael Zawacki
Streets are clean and free of trackout. Most homesites are clean, some lumber and building debris. BHH has relocated their washout. Alley behing blackrock homes area is still dirty.
General Inspection8/3/20188/6/20188/9/2018APASS
DetailsAndy J. Long
follow up
- Blackrock alley sweeping
- HH concrete washout pan relocated & clean up

Concrete washout bin was moved away from storm drain as requested. Streets are free of trackout, some alleys have loose dust & dirt from vehicles pulling off lots. Sedimetn protection installed. No new corrections.
General Inspection8/3/20188/3/20188/3/2018PPART
DetailsAndy J. Long
Correction needed:
- washout is full and needs service
- roll off washout pan needs to be re-located so area under neath can be swept and cleaned.
- new placement should be > 50 ft from storm drain; preferably on an open lot rather than on the road

Verbal correction issued to Hunter Homes RP Kyle. He said will get that done this afternoon.
General Inspection7/25/20187/25/20187/25/2018 PASS
DetailsMichael Zawacki
Main roads are clean, some dirt on alleys between lots. Site is clean, washouts still being used. Most lots have trash piles that need to be picked up. No trash spillover onto roads or sidewalks.
General Inspection7/6/20187/10/20187/10/2018APART
DetailsMichael Zawacki
Windblown dust from sites as machinery is driving. Some windblown trash and dirt on sidewalks. Concrete washouts are maintained, some homes need trash pickup.
General Inspection7/4/20187/4/20187/6/2018 CANC
DetailsAndy J. Long
rescheduled
General Inspection6/18/20186/19/20186/20/2018APASS
DetailsAndy J. Long
WIP on SFHs by Blackrock, Hunter Homes, and ZEC. No trackout from sub or work areas, spills, or fugitive dust issues observed. Storm drains have sediment protection.

No corrections requested, approved.
General Inspection6/15/20186/15/20186/18/2018 CANC
DetailsAndy J. Long
General Inspection5/31/20185/31/20186/1/2018 PASS
DetailsAndy J. Long
Conference5/15/20185/16/20185/16/2018ACANC
DetailsAndy J. Long
Complaint Inspection5/14/20185/15/20185/15/2018AFAIL
DetailsAndy J. Long
check for Council Springs ditch diversion and CGP coverage. Inspection conducted 5/14 AM

All builders need to improve trash control in there sections. ZEC will pick up all loose trash along Harris Ranch Road, perimeter fence/wetland area on north side of site. Blackrock will handle both sides of Eckert, and Hunter Homes will hand Millbrook Dr.

- Hunter has two roll off concrete washouts. Blackrock has a washout pit @ Millbrook and Rivernest

- ZEC to install perimeter sediment control between their lots on Harris Ranch Ave. and the wetland area under the Idaho Power Lines.

- pending: work down along Council Springs seems to have been conducted without permit. Checking if related to subdivision.

Will send trash email warning out to home builders and subdivsion developer.
General Inspection5/4/20185/4/20185/4/2018 PART
DetailsMichael Zawacki
Parade of homes is coming to neighborhood. Workers are on site getting everything clean. Blackrock homes has no washout on foundations in north east area of site,left message with Clint. Rest of site is clean.
General Inspection4/19/20184/19/20184/19/2018 PASS
DetailsMichael Zawacki
Multiple contractors working on all phases of homes for different builders. Site is clean, no lots stand out as dirty. Site is free from loose and wind blown trash.
General Inspection4/4/20184/4/20184/6/2018 PASS
DetailsAndy J. Long
SFHs in progress by Blackrock, Hunter Homes, and Z. Evans.

No significant trackout, no over full trash bins, or spills observed. Storm drains have sediment filter bags installed.

Trash along Eckert has been picked up.

General Inspection3/20/20183/20/20183/20/2018 PEND
DetailsAndy J. Long
Subdivision streets are free of significant trackout. Most inlets have sediment filter bags installed.

Corrections requested:
- Clint w/ BlackRock, pick up trash on east side of Eckert blown over from projects
- Kyle w/ Hunter, relocate concrete washout bin away from storm drain, or install protection or barrier to prevent washout entering storm drain.
General Inspection3/5/20183/5/20183/5/2018 FAIL
DetailsMichael Zawacki
Area needs to be swept, dirt and trackout throughout site. Building lots are dirty and need to be cleaned. Sent email to listed RP.
General Inspection2/16/20182/16/20182/20/2018 PART
DetailsMichael Zawacki
Site is mostly clean. Some builders are doing a poor job on their sites. Some trackout from people cutting through lots.
General Inspection2/1/20182/1/20182/1/2018 PASS
DetailsMichael Zawacki
Hunter Homes has a new washout, didn't see one for Black Eagle or DEV. Homesites have some lumber piles that need to be cleaned. Some dirt on sidewalks, no one driving vehicles onto lots.
BMP Violation1/17/20181/17/20181/17/2018PPASS
DetailsAndy J. Long
Hunter Homes had full washout removed and new washout container provided. Full capacity today. Correction complete, no new violations observed.

Still working the BlackRock Homes on location of their washout for DHE#16
General Inspection1/16/20181/16/20181/16/2018 FAIL
DetailsAndy J. Long
Over flowing concrete washout spill washout mingled with stormwater to gutter. Washout has been ordered by Hunter Homes, but appears is also being used by BlackRock Homes, both active in DHE #16

Immediate request to Hunter RP Kyle to have Treasure Valley washouts empty pan and provide new pan.
General Inspection1/1/20181/1/20181/2/2018 PASS
DetailsMichael Zawacki
Silt fence has been removed and rod iron fence installed along perimeter. Work on foundations has begun. Builders washing out on vacant lot, will address in their permit.
General Inspection12/15/201712/15/201712/15/2017 PEND
DetailsMichael Zawacki
Silt fence protecting wetland is failing, fallen down in lots of places. Lots of trackout on site. Masons working on wall and cutting concrete.
General Inspection11/30/201711/30/201711/30/2017 PASS
DetailsMichael Zawacki
Some wind blown trash along silt fence on east side. Track steer has run over section of silt fence. DIs installed throughout site and are maintained.
General Inspection11/15/201711/15/201711/15/2017 PASS
DetailsMichael Zawacki
Silt fence has been repaired.
Masons and landscapers are causing lots of tracking in the site. None is leaving currently.
General Inspection10/31/201710/31/201710/31/2017 FAIL
DetailsMichael Zawacki
Eastern silt fence along wetlands torn and collapsed in area. Significant trackout through out site. Left message with Clint at Syman to fix fence.
General Inspection10/13/201710/13/201710/16/2017APASS
DetailsMichael Zawacki
Large disturbed area. Grader operating and no dust observed. Landscapers are out planting trees and cleaning as they go. Majority of disturbed area is below grade of roads and water is staying in place. Bog on western side is creeping past silt fence, flooded in areas below grade of hpme sites.. Will need to keep eye out as weather comes in and water rises.No trackout from site.
General Inspection9/15/20179/15/20179/19/2017 CANC
DetailsAndy J. Long
BMP Violation7/24/20177/24/20177/24/2017AFAIL
DetailsAndy J. Long
No dust control for screening and hauling operation occuring at DHE #16. Lots of wind blwon and equipment generated dust.

Verbal correction request to provide immediate dust control.
General Inspection7/17/20177/18/20177/19/2017PPASS
DetailsMelissa Jannusch
Water truck on site today.
General Inspection7/17/20177/17/20177/17/2017PPASS
DetailsMelissa Jannusch

WIP on grading for roads, creating fill dirt, and leveling stockpiles. The drainage to the East of the site along Eckert road is revegetating.
Perimeter silt fence is in place and ok.

No dust control on site no fugitive dust during time of inspection. Will inform RP to have dust control ready.

No more dewatering is anticipated. The check dams and any other dewatering BMPs should be removed from the land west of the site.

No trackout and trash is contained.
General Inspection5/22/20175/22/20175/24/2017PPASS
DetailsMelissa Jannusch
Called RP Cody to request dust control. Eckert road is now paved. Water is still flowing through drainage ditch across Eckert road into wetland by the river.
General Inspection5/4/20175/4/20175/4/2017PPEND
DetailsMelissa Jannusch
De-watering in progress. Water is being pumped from the surface of the stormwater ponds into the wetland to lower the pond water elevation. Water from dewatering on the east end of the project is then pumped into the storm water pond. Where there is retention time for settling.
Dewatering on the west end: The rubber filter bag was ineffective. A pond liner has been placed under the outlet pipe to prevent scour. The water sheet flowing through the wetlands into the creek on the west end and into the wetlands on the south side of the green belt. The check dams that were previously providing filtering are no longer effective due to the high waters. The main filtering method is the stormwater ponds which provide sufficient storage time to settle particiles from the dewatering on the east end of the site.
The water being discharge has low turbidity. Water entering the creek has no visible plume. The river is backing up into the wetland so no water from these discharges are reaching the river.
RP Cody continues to take turbidity measurement and sampels. The NTU readings have not exceeded regulatory limits.
Eckert Road: the water flow has decreased through the ditch on the new Eckert road since last inspection and the NTU reading have not exceeded regulatory limits

General Inspection5/1/20175/1/20175/3/2017PPEND
DetailsAndy J. Long
Inspection 5/1 PM

De-watering into stormwater pond from excavation wellpoints. Hi-grade and Sunroc crews onsite. Stormwater pond is being dewatered with water flowing through hose west of Warm Springs Creek and into drainage basin with ditch that flows towards Walling Creek.

Eckert Road is not yet paved and a new ditch to transport Council Springs has been dug. There is no ditch lining or check dams. Water appeared muddy and flows into a grassy wetland area adjacent from River. No plume visible in river. Silt fence installed to slow water entering the meadow area - unable to see if there is any effective treatment.

RP is going to have crews install check dams of washed rock. Will inspect to review BMP options.
General Inspection4/7/20174/19/20174/20/2017APASS
DetailsMelissa Jannusch
WIP. Pond is very full. Silt fence ok. No corrections.
General Inspection4/10/20174/10/20174/10/2017PPASS
DetailsMelissa Jannusch
General Inspection4/7/20174/7/20174/7/2017PPASS
DetailsMelissa Jannusch
Stormwater pond excavation is complete. WIP on grading roads and digging utilities for site and Eckert rd. sections of the greenbelt have been removed for construction activity. Some trackout on to greenbelt. No trackout onto surrounding streets.
SWPPP inspections are up to date and preformed after the rain event. Notes that repairs are needed for silt fence.
Dewatering occurring for utilities occurring on Eckert. All water is discharged on site into the stormwater ponds and land application to site.
Clean up is still needed for the original dewatering operation on the west site of the site. There is some sediment build up that should be cleaned. The is material and gravel that should be removed. The gravel check dams need to be removed from adjacent site. Ensure this is complete before grading is complete.
No immediate corrections.
Activity fees hold still due.
General Inspection3/9/20173/9/20173/9/2017PPASS
DetailsMelissa Jannusch
Dewatering operation complete for current phase of construction. There is sediment piled where the perforated pipe was discharging water. Clean up of sediment is currently underway. Check back for progress. There may be a need to lower pond elevation again to complete work in the pond. Ensure dewatering BMPs are properly reinstalled before pumping from pond begins.
General Inspection3/6/20173/6/20173/6/2017PPASS
DetailsAndy J. Long
Dewatering system for installation of stormwater ponds is now turned off. Remaining water draining into Walling Creek is clear. WIP by Higrade, who is dewatering into stormwater ponds with no offsite discharge. No violations observed, no corrections requested at this time.
General Inspection3/3/20173/3/20173/3/2017PPASS
DetailsAndy J. Long
Turbidity sampling of dewatering operation conducted concurrently with CA Paving John M.

Samples of the discharge from ditch into Walling Creek wetland area were between 47-53 NTU on the City meter. Background turbidity upstream in wetland was 2-3 NTU.

In upstream drainage ditch north of Warm Springs bypass had reading of 5-7 NTU. Samples from water from the end of pipe with sediment sack were 60-63 NTU.

Discharges is currently with compliance limits. It should also be noted that meter used by CA had differing measurements but were also within compliance. They will be sampling 3x daily until operation is complete. Work will occur Saturday, no work Sunday and is scheduled to complete on Monday.

No new corrections requested. Will check in on Monday

General Inspection3/3/20173/3/20173/3/2017PPASS
DetailsMelissa Jannusch
Preformed turbidity testing with John from Sunrock. John will test water daily to ensure compliance with regulations.
Site Preparation3/3/20173/3/20173/3/2017PCANC
DetailsMelissa Jannusch
error
Random Inspection3/1/20173/1/20173/1/2017PPASS
DetailsMelissa Jannusch
Dewatering operation. Water entering wetland is clear. Backflow prevention added to filter bag.
General Inspection3/1/20173/1/20173/1/2017ACANC
DetailsMelissa Jannusch
General Inspection2/28/20172/28/20172/28/2017APASS
DetailsMelissa Jannusch
Discharge is clean. Water is filtering through field then entering wetland. The rock check dam is providing adequate setting time for water before it enters wetland.
BMP Violation2/27/20172/27/20172/28/2017PPEND
DetailsAndy J. Long
check on corrections to dewatering setup

Follow up inspection conducted at 3:30 PM on 2/27. Two earthen dams were constructed to isolate the excavation activity from the well boring for the dewatering pump. The length of pipe of the dewatering hose was extended to place pipe in more vegetation as well two section of ribbed perforated pipe wrapped in geotextile fabric to treat water at end of pipe.

The water in the ditch to the west of the site was turbid but water coming out of the end of the pump system is now clear. Running through additional vegetation should also help with sediment removal.

Will re-inspect in the 2/28 AM to check on conditions.
BMP Violation2/27/20172/27/20172/27/2017PFAIL
DetailsAndy J. Long
Dewatering activity not in compliance. No treatment or settling occuring. End of pipe sediment sock not installed properly, drawing water from muddy area next to excavation and equipment traffic. Discharge flows into existing drainagge ditch along Warm Spring bypass and then flows in Walling Creek wetland area. Turbid water observed in wetland but plume had not yet joined the stream flow heading towards Boise River.

Corrections requests issued:
- install check dams in drainage ditch to slow flow of water and provide some settling and sediment capture
- isolate area where pump is pulling water so that less turbid water is pulled into pump
- turn off pump to re-install end of pipe treatment BMP

CA Paving responded to initial correction requests and is working to improve the dewatering setup and add more controls.

Approximately 2 hours spent at site requesting corrections and notifying on-site coordinator. Non-compliant discharge of turbid water from construction actitivity into creek. Special investigation fee issued.

Dewatering plan that was not submitted was not implemented or inspected once flowing.
General Inspection2/17/20172/17/20172/17/2017PPASS
DetailsMelissa Jannusch
Added additional rocks to slow flow and add some retention time. No plume visible
Site Preparation2/17/20172/17/20172/17/2017PCANC
DetailsMelissa Jannusch
General Inspection2/17/20172/17/20172/17/2017PFAIL
DetailsMelissa Jannusch
Correction requested: add additional filtering BMP to dewatering. Small plume appearing in warm springs creek due to work occur close to pump. Spoke with RP Cody he is adding filtering BMP to dewatering hose.
General Inspection2/7/20172/7/20172/10/2017PPASS
DetailsMelissa Jannusch
Perimeter silt fence is in tack. WIP. No muddy discharges. No trackout observed.
No corrections
General Inspection2/3/20172/3/20172/7/2017PPASS
DetailsAndy J. Long
WIP. Pre-construction meeting conducted on 1/30 and site inspection on 2/3.

Perimeter silt fence installed on east side of project along Eckert greenbelt path, existing old road base of old Eckert road being used for staging and access from north and south of site. No surface waters though project area, but need to be aware of Council Springs and Warm Springs Creek on both sides of project. Permit sign and SWPPP information is posted.

General Inspection7/29/20207/29/2020   