General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Michael Zawacki
|
|
|
Will monitor storm drains under permit esc15-00857
|
General Inspection | 1/17/2019 | 1/17/2019 | 1/17/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/3/2019 | | PART |
Andy J. Long
|
|
|
3 SFHs in progress on Eyrie Way. Perimeter sediment control wattles and slope interuption wattles on hillsides are installed properly. No discharges or sediment runoff observed.
Lined concrete washout is installed at Arrow Villa and Winter Camp.
Correction request for next inspection (2 weeks) - pick up and remove discarded BMPs and materials laying around on the parcel on Arrow Villa across from Goshawk, the former location of the concrete washout for phase 8 homes.
|
General Inspection | 12/18/2018 | 12/18/2018 | 12/19/2018 | | PASS |
Michael Zawacki
|
|
|
All homes completed, washout removed. Inlet protection still installed since uphill phase has begun.
|
General Inspection | 12/3/2018 | 12/3/2018 | 12/3/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/16/2018 | 11/16/2018 | 11/19/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/17/2018 | 10/17/2018 | 10/17/2018 | | PASS |
Michael Zawacki
|
|
|
All homes completed. Area landscaped. Old washout has been excavated, area still disturbed. Inlet protection still in place while up hill work going on.
|
General Inspection | 10/2/2018 | 10/2/2018 | 10/3/2018 | | PASS |
Andy J. Long
|
|
|
WIP on HOA hillside path. All parcels on Goshawk are now occupied. Cement washout has been removed and cleaned up, storm drains stilll have sediment filter bags installed.
|
General Inspection | 9/17/2018 | 9/17/2018 | 9/17/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/31/2018 | 8/31/2018 | 8/31/2018 | | PASS |
Michael Zawacki
|
|
|
Homes complete. Will final after washout is cleaned and regraded.
|
General Inspection | 8/16/2018 | 8/16/2018 | 8/16/2018 | | PASS |
Michael Zawacki
|
|
|
All homes in phase completed. Old washout can be removed, community areas completed with landscaping, and general walk through and trash picked up. Permit can be closed once all completed. Inlet protection should stay in due to new phase and construction uphill.
|
General Inspection | 8/1/2018 | 8/1/2018 | 8/1/2018 | | PASS |
Andy J. Long
|
|
|
No new activity for subdivision. No ESC corrections requested.
|
Random Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/12/2018 | 7/12/2018 | 7/12/2018 | | PASS |
Michael Zawacki
|
|
|
Last 2 homes nearing completion.
|
General Inspection | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Andy J. Long
|
|
|
No new subdivsion work occuring. Two SFHs in progress. BMPs installed. No violations
|
General Inspection | 6/15/2018 | 6/15/2018 | 6/15/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on last two homes. Neighborhood BMPs in place. Site will need blown trash picked up, has accumulated in retention pond area.
|
Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PART |
Michael Zawacki
|
|
|
Post Rain Inspection. No runoff or BMP failure on site.
|
General Inspection | 5/23/2018 | 5/23/2018 | 5/23/2018 | | PASS |
Michael Zawacki
|
|
|
2 homes under construction. Site is clean, no ESC issues.
|
General Inspection | 5/8/2018 | 5/8/2018 | 5/8/2018 | | PASS |
Andy J. Long
|
|
|
Inspected 5/7 PM. 2 SFHs in progress on Goshawk. Subdivision BMPs installed. No violations observed.
|
General Inspection | 4/23/2018 | 4/23/2018 | 4/23/2018 | | PASS |
Michael Zawacki
|
|
|
Working on two final homes. No issues on site.
|
General Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | | PASS |
Michael Zawacki
|
|
|
Site is free from trackout and runoff. DIs at bottom of hill are clean.
|
General Inspection | 3/22/2018 | 3/22/2018 | 3/22/2018 | | PASS |
Michael Zawacki
|
|
|
Inspected 3/21. Spoke to builder about trackout.
|
General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 | | PART |
Michael Zawacki
|
|
|
Trackout from new home construction. Some trackout around concrete washout.
|
General Inspection | 2/20/2018 | 2/20/2018 | 2/20/2018 | | PASS |
Michael Zawacki
|
|
|
Talked to owner, they will replace liner in washout when truck with it gets back to site. 2 lots under construction.
|
General Inspection | 2/5/2018 | 2/5/2018 | 2/5/2018 | | PASS |
Michael Zawacki
|
|
|
Lower DIs are protected. Work on one lot with another to begin soon. No trackout from active site, washout has new rocks.
|
General Inspection | 1/19/2018 | 1/19/2018 | 1/19/2018 | | PART |
Michael Zawacki
|
|
|
2 lots remain, one under construction. Lots of mud at end of cul-de-sac from concrete company. Dirt running down and some dirt falling out at inlets. Some ttrackout from concrete washout. There isn't a stabalized entrance, just sand that has deep tracks in it.
|
General Inspection | 1/4/2018 | 1/4/2018 | 1/4/2018 | | PASS |
Michael Zawacki
|
|
|
2 remaining home sites, one is under review, other work is on hold. Neighborhood BMPs still in place. Area of concrete washout needs to be cleaned, old concrete haulded away.
|
General Inspection | 12/20/2017 | 12/20/2017 | 12/20/2017 | | PASS |
Andy J. Long
|
|
|
Storm drains have sediment protection, lined concrete washout onsite, and slopes around Goshawk are well vegetated. No activity of SFHs at time of inspection.
No violations observed.
|
General Inspection | 12/5/2017 | 12/5/2017 | 12/5/2017 | | PASS |
Michael Zawacki
|
|
|
Neighborhood BMPs in place. About half of homes completed, still a few lots vacant.
|
General Inspection | 11/20/2017 | 11/20/2017 | 11/24/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/3/2017 | 11/3/2017 | 11/7/2017 | | PASS |
Michael Zawacki
|
|
|
WIP on SFH. Community BMPs in place.
|
General Inspection | 10/19/2017 | 10/19/2017 | 10/19/2017 | | PASS |
Michael Zawacki
|
|
|
WIP on SFH. Perimeter controls in place, DIs protected. Washout built and being used.
|
General Inspection | 9/26/2017 | 9/26/2017 | 10/4/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
Andy J. Long
|
|
|
WIP on 3 SFHs on Goshawk by Canyon Crest, trash contained at each site.
Storm drains have maintained sediment filter bags installed and a lined concrete washout provided.
No trackout or dust issues observed at time of inspection. One of two lots at end of culdesac should soon be under construction. No corrections requested at this time.
|
General Inspection | 9/11/2017 | 9/11/2017 | 9/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/25/2017 | 8/25/2017 | 8/25/2017 | P | PASS |
Andy J. Long
|
|
|
BMPs installed.
Working with SFHs on trash removal at corner of Goshawk and Arrow Villa so silt fence may be maintained or removed.
If stockpiles of dirt are to remain on open lot or lots will not be built upon this season, they will need stabilization. Wind blown dust has become an issue in culdesac. Also working with Canyon Crest and Tradewinds to suppress dust and limit exposed areas and stockpiles.
|
General Inspection | 8/16/2017 | 8/16/2017 | 8/16/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/1/2017 | 8/1/2017 | 8/4/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/17/2017 | 7/17/2017 | 7/20/2017 | P | PASS |
Andy J. Long
|
|
|
Storm drain sediment protection has been maintained. No sediment or other materials accumulated in gutters or impervious areas. Individual SFHs have BMPs installed.
New concrete washout has been provided and is ready for use. May require construction rock if trackout becomes an issue, but is currently in compliance.
No violations observed, no corrections requested.
|
General Inspection | 7/4/2017 | 7/4/2017 | 7/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2017 | 6/19/2017 | 6/19/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on Goshawk. Concrete washout is in use and lined. No new drainage or erosion issues.
|
General Inspection | 6/2/2017 | 6/2/2017 | 6/2/2017 | | PASS |
Melissa Jannusch
|
|
|
No immediate correction to address.
No WIP. Revegetation is taking place. Drainage channel coming down Arrowvilla that ends where the sidewalk begins has a highly eroded channel running through the middle of the channel. Dirt piles have been placed higher up in the channel in an attempt to slow the water. The combination of heavy duty wattles and hay bales are in place to contain the sediment run off and erosion from the channel. The hay bales and heavy duty wattles appear to be effective at keeping the sediment from entering the road and have a significant amount of sediment build up and will need to be cleaned out soon. The landslide has some revegetation occurring and does not appear to have increased in area.
There is WIP on SFHs on Goshawk. The concrete appears to have been emptied recently. No trackout. Trash is contained. DIs ok.
|
General Inspection | 5/18/2017 | 5/18/2017 | 5/18/2017 | A | PASS |
Andy J. Long
|
|
|
Storm drain inlet bags have been maintained. Perimeter silt fence is installed properly. Lined concrete washout provided for SFHs. Canyon Crest homes on Goshawk have BMPs installed and no trackout or loose dirt leaving site.
Correction request: - provide more rock for entrance to concrete washout pit to prevent trackout and allow trucks to reach the pit.
|
General Inspection | 5/5/2017 | 5/5/2017 | 5/9/2017 | | PASS |
Andy J. Long
|
|
|
SFHs in progress. Trackout reported last week has been swept. DIs have sediment protection and open lots have perimeter controls.
|
General Inspection | 4/20/2017 | 4/20/2017 | 4/28/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 4/5/2017 | 4/5/2017 | 4/6/2017 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed; RP and crew in progress
Trackout and fugitive dust due to speeding dump truck from end of Goshawk to stockpile area in EC #9 needs clean up. Train driver about trackout and speeding
Relocate concrete washout to high ground that does not receive storm water run on from other areas. New pit has storm water pool.
Follow up meeting to be scheduled
|
General Inspection | 3/22/2017 | 3/22/2017 | 3/27/2017 | | PEND |
Melissa Jannusch
|
|
|
The site preparation on Goshawk requires corrections to the concrete washout and cleaning around the DIs on Goshawk and arrow villa. Left a message for developer RP (Jill Jenkins) requesting corrections to the DI bags and the concrete washout. There are no changes to the slide area. The drainage channel is beginning to grow vegetation. There is an eroded channel through the middle of the drainage channel. There is no standing water on flat lots. DI protections are ok. Most require sweeping around the DIs due to sediment capture build up. Corrections requested: 1.Clean sediment around DIs on Goshawk and arrow villa 2.Maintenance to concrete washout and refresh rocked entrance 3.Clean sediment around other DIs in subdivision
|
General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PEND |
Andy J. Long
|
|
|
No discharges, no trackout to streets. Site is currently inactive. Storm drain inlets at Goshawk and Arrow Villa have had new sediment protection installed. Some clean up still remains.
Corrections to be worked on in preparation for spring: - remove discarded BMPs and construction debris from site, including wind blown trash. Straw from wattles could potentially be salvaged for re-use as ground cover mulch for areas with no vegetation - inspect and secure existing silt fence to stakes, remove collected silt and mud from behind fence. - inspect all existing perimeter wattles and repair as necessary. Do not disturb existing vegetative buffers. - prepare for SFH construction in Spring; re-install concrete washout and clean up existing area. Will need stabilized entrance or new location - portable washout containment or offsite disposal options should be considered
|
General Inspection | 3/2/2017 | 3/2/2017 | 3/6/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled 3/7
|
General Inspection | 2/15/2017 | 2/15/2017 | 2/15/2017 | | PEND |
Melissa Jannusch
|
|
|
Inspected the mud slide on 2/10. A trench was dug to prevent water from ponding and draining towards slide. No changes observed today.
|
General Inspection | 1/31/2017 | 1/31/2017 | 2/3/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/30/2016 | 12/30/2016 | 1/5/2017 | | PASS |
Andy J. Long
|
|
|
snow covered and frozen conditions, no snowmelt runoff occuring. No subdivision activity. No trackout or other issues.
note: water company utilizing parcel at end of culdesac for staging for water line project not associated with development of EC#8.
|
General Inspection | 12/15/2016 | 12/15/2016 | 12/15/2016 | A | PASS |
Andy J. Long
|
|
|
No construction activity. BMPs installed on hillside slopes. Snowmelt and runoff from project area is clear . Approved.
|
General Inspection | 12/8/2016 | 12/8/2016 | 12/15/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/23/2016 | 11/23/2016 | 11/25/2016 | | PASS |
Ben Livingston
|
|
|
no new activity, site looks good
|
General Inspection | 11/8/2016 | 11/8/2016 | 11/9/2016 | | PASS |
Andy J. Long
|
|
|
No new subdivision activity or SFHs in progress. DI sediment bags recently maintained and reinstalled. No sediment runoff issues or hillside erosion rills observed. Concrete washout for EC #7 homes is in compliance with lined pit.
|
General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/7/2016 | 10/7/2016 | 10/7/2016 | | PASS |
Andy J. Long
|
|
|
No SFHs in progress yet. Silt fence at Arrow Villa and Goshawk is in good condition. NO trackout, no sediment runoff or hillside erosion issues observed. Concrete washout for #7 SFHs has been cleaned up. No corrections needed at this time.
|
General Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 | | PASS |
Andy J. Long
|
|
|
No SFH or subdivision acitivitiy. BMPs (wattles, silt fence, and DI bags) are currently in decent operating condition. No corrections at this time.
|
General Inspection | 9/7/2016 | 9/7/2016 | 9/9/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2016 | 8/23/2016 | 8/24/2016 | P | PASS |
Andy J. Long
|
|
|
DI bags in good condition, SWPPP info and City permit posted. No new SFH construction yet. Water truck for phase #9 is causing some minor trackout. Trackout has been swept up in past weeks and Superior will sweep up at end of week. No corrections requested
|
General Inspection | 8/10/2016 | 8/10/2016 | 8/10/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/26/2016 | 7/26/2016 | 7/26/2016 | | PART |
Andy J. Long
|
|
|
No activity. No sediment coming off graded parcels. Hillside surrounding culdesac is vegetated.
Correction request: - sweep up around inlets on Goshawk and Arrow Villa.
- clean up litter around concrete washout. Will issue request regarding litter to Canyon Crest Homes
|
General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 | | PART |
Andy J. Long
|
|
|
No activity. No hillside erosion or damaged BMPs.
Correction: - sweep up trapped sediment around the wattles protecting storm drains.
|
General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 | | PASS |
Andy J. Long
|
|
|
No recent changes or activity. BMPs installed, lots have been regraded. No SFH construction yet. No corrections at this time. Hillsides above lots have vegetated well over 70%
|
General Inspection | 6/9/2016 | 6/9/2016 | 6/9/2016 | P | PASS |
Andy J. Long
|
|
|
No activity in EC #8. All DIs on Goshawk and Arrow Villa have been cleaned this week. Hillside vegetation and silt fence perimeter at runoff point are in good condtion and should contain sediment onsite. Lots that were under water have been re-graded and SFH construction should begin soon.
No corrections, site is in compliance. Permit and SWPPP info onsite.
|
General Inspection | 6/3/2016 | 6/6/2016 | 6/6/2016 | A | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/3/2016 | 6/3/2016 | 6/3/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for 6/5
|
General Inspection | 5/3/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Andy J. Long
|
|
|
No construction activity. Appears precipitation was very light in this area compared to the others. No significant sources of sediment runoff. Storm drain inlet protection is in good condtion and lined concrete washout provided for SFHs active in phase 7.
Lots in phase 8 to be re-graded before final plat per RP Jill. No violations observed. Hillside vegetating very well.
|
General Inspection | 5/3/2016 | 5/3/2016 | 5/3/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 4/15/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Andy J. Long
|
|
|
No activity or recent changes at site. Slopes of phase 8 and 9 that were hydroseeded are growing well.
Developer still needs to obtain ESC permit for any construction related activity that occurs at the parcel at Eyrie Way and Villa Ridge as requested and agreed upon in March.
|
General Inspection | 4/15/2016 | 4/15/2016 | 4/15/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for Monday 4/18
|
General Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | | PASS |
Andy J. Long
|
|
|
BMPs installed. No significant acitivity. Lots to be re-graded where damaged and tested for proper compaction per PW hillside. Retention & diversion berms are to remain.
|
Site Preparation | 3/16/2016 | 3/16/2016 | 3/16/2016 | A | CANC |
Andy J. Long
|
|
|
SWO correction requests for Eyrie Canyon phase #8 have been addressed by developer. ] Walk through inspection to lift SWO conducted with Connell Development stormwater team.
1. BMPs re-installed, including DI sediment filter bags, perimter sediment controls installed properly around Goshawk culdesac (wattles & silt fence) 2. Sidewalks and gutters are clean with no loose sediment or dirty runoff evident. 3. Temporary retention ponds and earthen berms have been installed on the lots on north side of Goshawk 4. Graded hilliside between phase 8 & 9 was hydroseeded last November and grass is showing signs of establishing well. 4. No significant erosion rills or gullies observed due to recent rain events. No BMP failures observed. 5.Special Investigation fees paid.
Eyrie Canyon # 8 now approved for construction activity and proceeding with plat process prior to SFH construction.
|
Complaint Inspection | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | DONE |
Andy J. Long
|
|
|
Hydro-seeeding subcontractor was approved to be onsite to apply seed to the slopes and shoulder areas in phase 8 & 9. Prior to VSI (seeding company) coming on site, the developer filled in some gullies in the slopes and bermed some lots to control runoff locations. This recent grading work has not been formerly reviewed or detailed in a grading or SWPPP plan.
Requested that all work completed this week be documented on the new SWPPP map that is required to be submitted in order to remove the SWO.
No other work not related to repairing erosion or installing BMPs (this includes the hydroseeding) is to be allowed until SWO is formerly lifted.
It was observed that water is being pumped out of Stewart Gulch creek for use in hydroseeding truck. It is unclear if this is a common or prohibited practice. There was no damage in the creek area observed, the truck is parking on the street and filling up with a hose & pump system.
|
General Inspection | 2/26/2016 | 2/26/2016 | 2/26/2016 | | CANC |
Evan Jenkins
|
|
|
|
Conference | 2/10/2016 | 2/11/2016 | 2/11/2016 | P | DONE |
Andy J. Long
|
|
|
2 PM Developer to explain new ESC plan for EC phases. Site walk through requested.
Plan is to allow dewatering off lots in EC #8 to allow for them to dry and be re-worked. Water will discharge into the new EC#8 pond. This pond is to be cleaned out and re-approved by ACHD (bond issued) so any sediment in the water will be caputured in the permanent stormwater facilities and then cleaned.
Once dewatered, perimeter BMPs will be installed correctly. Other corrections and actions are pending.
|
General Inspection | 2/8/2016 | 2/8/2016 | 2/10/2016 | | CANC |
Andy J. Long
|
|
|
meeting scheduled for Thursday
|
General Inspection | 1/20/2016 | 1/22/2016 | 1/22/2016 | P | PEND |
Andy J. Long
|
|
|
SWO still posted. No activity on site at time of inspection. Roadways and gutters have been cleaned. Inlet bag at Wintercamp and Arrow Villa has been maintained.
Sediment sludge visible in outlet pipe to pond and Arrow Villa and Winter Camp. Next week stormwater infrastructure is to be cleaned out by contractor per ACHD.
Observed that the aforementioned pond outlet is at the same grade or even lower that the outlet so there is very little settling time for heavy events.
No new issues observed. SWO still issued until re-inspection requested by contractor.
|
General Inspection | 1/20/2016 | 1/20/2016 | 1/20/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 | | CANC |
Andy J. Long
|
|
|
SWO still issued for Eyrie Canyon phases. Case under review and to be inspected later this week
|
Stop Work Order | 12/21/2015 | 12/21/2015 | 12/21/2015 | A | FAIL |
Evan Jenkins
|
|
|
Multiple BMP violations, issues continue
Direct Illicit Discharge currently taking place into Crane Creek. Took Photos and a video for proof. All 3 ponds are connected via MS4 Piping from top pond located on Phase 8 to bottom pond.
|
Random Inspection | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | FAIL |
Evan Jenkins
|
|
|
Significant Amount of sediment discharging off lots, onto sidewalks, curbs, gutters and drop inlets. Need BMP Maintenance ASAP
|
Stop Work Order | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | FAIL |
Evan Jenkins
|
|
|
SWO Issued
--No work to occur until additional BMP's are installed per manufacture spec, BMP's maintained, major cleaup of entire area and become back into compliance with BCC 8-17
|
General Inspection | 12/1/2015 | 12/1/2015 | 12/1/2015 | | PASS |
Andy J. Long
|
|
|
SFHs in progress. No hillside erosion rills or gullies observed. No sediment runoff or other discharges occuring. Minimal earth work occurring currently. No corrections at this time.
|
General Inspection | 11/16/2015 | 11/16/2015 | 11/16/2015 | | PASS |
Andy J. Long
|
|
|
SFHs in progress on Bent Bow in Eyrie Canyon #8. Permit signs posted, trash contained, and no trackout or discharges observed.
Hillside seeding and revegetation around culdesac is established and no erosion rills or gullies observed on cut hillsides. Recnently installed water line connection behind home on Bent Bow will need to be stabilized. BMPs down slope are installed to contain sediment.
Active construction/grading is occuring in EC #9, and no issues were observed. Approved.
|
General Inspection | 10/30/2015 | 10/30/2015 | 10/30/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/14/2015 | 10/14/2015 | 10/14/2015 | | PASS |
Andy J. Long
|
|
|
SFHs in progress. No subdivision work occuring on this phase. Permit sign posted. No ESC issues at this time.
|
General Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 | | PEND |
Evan Jenkins
|
|
|
No activity at time of inspection
|
Complaint Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 | P | CANC |
Daryl DeGrange
|
|
|
Training session
|
General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. Stormwater features have been cleaned and temp BMPs reinstalled after large rain event earlier this summer. No corrections issued. Project is not yet complete.
|
General Inspection | 8/28/2015 | 8/28/2015 | 8/28/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/13/2015 | 8/13/2015 | 8/13/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 | | PART |
Andy J. Long
|
|
|
Work still needs to be done to clean up Bent Bow. All inlets need to be emptied, only about 50% were serviced. WIP on corrections. No new corrections.
|
BMP Violation | 7/10/2015 | 7/10/2015 | 7/10/2015 | P | PART |
Evan Jenkins
|
|
|
Still a significant amount of sediment in the ROW. Continue cleanup (sweep, shovel, empty witches hats etc). More turbid discharge came from last nights heavy rains.
|
Complaint Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 | A | FAIL |
Evan Jenkins
|
|
|
Significant Discharge or Sediment, Gravel leaving the site, entering all stormdrains and ACHD's Stormwater Pond.
Corrections: 1.) Sweep intersection of Bent Bow and Arrow Villa. 2.) Sweep Intersection of Arrow Villa and and road down below. 3.) Sweep Entire Arrow Villa Road 4.) Replace ALL Drop Inlet Bags 5.) Place BMP's along entrance of Phase 8 and Arrow Villa
|
General Inspection | 7/2/2015 | 7/2/2015 | 7/2/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/17/2015 | 6/17/2015 | 6/17/2015 | | PASS |
Evan Jenkins
|
|
|
No activity at time of inspection. No ESC issues at this time
|
General Inspection | 5/29/2015 | 5/29/2015 | 5/29/2015 | | PASS |
Evan Jenkins
|
|
|
Grading appears complete Individual SFH lots have been prepped No ESC issues at this time No discharges leaving the site
|
General Inspection | 5/8/2015 | 5/8/2015 | 5/8/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: mass grading is occuring prepping for individual lots. Permit posted along with SWPPP onsite. No esc issues at this time
|
Site Preparation | 4/1/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Evan Jenkins
|
|
|
Permit and SWPPP Posted Next to Construction Entrance and Concrete Washout. Most perimeter controls are installed. Waiting for adjacent Canyon Crest Homes to get his lot surveyed so conctractor can finish installing BMP's. Construction is anticipated to begin next monday. Approved to begin construction
|
General Inspection | 1/16/2017 | 1/16/2017 | | | |
Andy J. Long
|
|
|
|