DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/10/20208/10/20208/10/2020 CANC
DetailsAndy J. Long
General Inspection8/10/20208/10/20208/10/2020PPASS
DetailsAndy J. Long
Subdivision infrastructue and grading complete. Stabilization/revegeation of common areas occuring. Dry, hot, condition.

BMPs installed include inlet protection, perimeter silt fence, and slope erosion controls along La Cuesta. No wind blown dust observed.

No correcitons requested.
Conference7/23/20207/24/20207/24/2020ADONE
DetailsAndy J. Long
10 AM with home builders

Meeting with Sustainable Homes to review work area. Will set up staging area in center lot above the intersection and landscaped sitting area. Request to install silt fence and/or wattle on the downhill edge of this area

Core has the lots on the west side of sub. Staging area is in back corner. RP was installing initial BMPs.
General Inspection7/15/20207/15/20207/15/2020 PASS
DetailsMichael Zawacki
All hillside BMPs have been repaired. Lots of growth on hydroseeded hillsides, all lots are now also starting to grow.
Sidewalk along Warm SPrings and Teresa completed. Check dams in ditch, some armoring where storm drains come from under road.
Private street Boven has been graded with pit run, roads have been patched. No current work on site.
General Inspection6/30/20206/30/20206/30/2020PFAIL
DetailsMichael Zawacki
post rainfall inspection
Utility crew working on Warm Springs and Boven.
Boven is a muddy mess and is tracking onto Teresa.
Silt fence has been repaired and new wattle installed at La Cuesta. Largest rill was lined with poly to stop erosion. No blow outs or issues up top.
Utility crew down low is causing issues, neighbors have complained about Boven before, is a private road and they need to repair it when done.
General Inspection6/17/20206/17/20206/17/2020PPASS
DetailsAndy J. Long
No signficant BMP failures after rain events. No new hillside erosion or sediment blowouts.

Site will need to maintain DI bags, check silt fences, and wattle installation once site has dried out.

WIP on intersection and utilies at bottom of site. No trackout to Warm Springs
General Inspection6/15/20206/15/20206/15/2020PPART
DetailsMichael Zawacki
post rainfall inspection
Hillside along warm springs is vegetated and held up. Sidewalk is n, disturbed area hydroseeded. Multiple check dams in ditch, they are holding water, no rilling.
Curb crew working at Warm Springs and Teresa, Teresa is gravel by intersection.
Four tiers of silt fence installed at Brian & La Cuesta.
Some rills and undercutting. Spoke with foreman on site and they will repair. No dirt has reached road, some in channel along hill in rip rap.
All lots have been tackified and are in good condition.
General Inspection6/12/20206/12/20206/12/2020PPASS
DetailsAndy J. Long
Compliance inspection for Notice of Violation issued 5/28/2020

SIte is now in compliance with site stabilization requirements. All disturbed areas have had a temporary tacifiier mulch applied to reduce raindrop erosion and prevent windblown dust.

BMPs have been installed to prevent erosion and runoff of sediment to the street and stormwater in locations where previous runoff has occured during rain events.
- Silt fence and wattle installations are done correctly
- Subdivision storm drains have sediment protection
- staging area access has been fenced to control traffic/prevent trackout.
- streets are clean with no loose dirt or material staged on impervious surfaces.

Work in progress by on Teresa & Warm Springs instersection and lift station.

Corrections requests in the NOV are satisfied and issue resolved, no outstanding requests.
General Inspection6/8/20206/8/20206/9/2020PPEND
DetailsAndy J. Long
post rainfall inspection conducted 6/9 @ 2 PM

WIP on Teresa intersection.

Syman Crew onsite applying tacifier mulch for site stabilization. This will satisfy a requirement of the Notice of Violation posted 5/28

Observations:
- Silt fence installed on the curve of Brian Way was undercut but did capture a lot of mud behind J hook of fence. (1)
- Runooff from block 1 lot 5 has caused some erosion on the slope above the onsite stormwater pond.(2)
- There is sediment runoff occuring at the corner of La Cuesta & Hakkasan , Block 2 lot 11 (3)
- trackout on Hakkasan and common drive originating from staging area on lots 15-16 of block 2 in the SE corner of sub. (4)

Correction requests:

1. Repair or reinstall section of silt fence. Remove accumulated mud behind J-hook. Clean up loose mud/dirt in area. Consider installing check dams or velocity controls in rill leading to this discharge point.

2. Install top of slope diversion berm or other control to prevent runoff from flowing over slope to cause erosion. Fix or reseed/tacify eroded area. Repair rip rap below stormwater outlet/clean mud out of pond. Consider installing silt fence or wattle between the disturbed revegetating slope and the stormwater pond.

3. Clean up dirt on sidewalk and street. Install perimeter sediment control on low spot of block 2 lot 11 to retain or filter runoff from this area.

4. Clean up trackout from block 2 lot 16 to Hakkasan, install construction entrance or relocate staging area to prevent trackout from this area.

Emailed inspection report to Rhett.

NOV compliance date is this Friday 6/12, but will grant 1 week extension to complete correction requests in NOV and listed above.
Conference5/22/20205/26/20205/28/2020ADONE
DetailsAndy J. Long
send NOV to developer about stabilization/revegetation violations

NOV to be posted online in documents and has been sent to Rhett Collins with Granite and Developer Lee Gientke via email 5/28/2020

Compliance date is June 12, 2020.
General Inspection5/22/20205/22/20205/22/2020PPEND
DetailsAndy J. Long
Clean up of streets is complete. WIP on Teresa connection to Warm Springs. Storm drain sediment bags have been maintained.

Added wattle and silt fence perimter on the section of slope that had erosion and blow out occur. SIlt fence properly installed and J-hooked.

Corrections remaining:
- clean up mud in drainage ditch.
- stabilize all disturbed area that is out of compliance with stabilization deadlines.
BMP Violation5/21/20205/21/20205/21/2020PPEND
DetailsAndy J. Long
Stopped by site @ 12:30. Streets had rocks and mud removed/cleaned. Workers beginning to clean sidewalk, street sweeper ordered, site response has been prompt.

BMPs for eroded area stabilization and new silt fence to be installed Thursday/Friday. Follow up scheduled

Will notify the developer that all disturbed areas must have either temporary or permanent stabilization on all open areas.

General Inspection5/21/20205/21/20205/21/2020PFAIL
DetailsAndy J. Long
post rainfall inspection 5/20 3:45 pm


Failed stormwater controls berms sent muddy water (out of range >1000 NTU)and rocks down to Teresa. Mud and dirty water pooled on Teresa, some mud has affected neighbors driveways. Runoff also carried sediment off the bare home lots.



In addition to the large armount of rain, the erosion has been caused by the bare disturbed slope area, the nearly 1 acre of area has been at grade since end of March with only tracking and stormwater control berms installed, City last notified site to hydroseed/stabilize this area to meet stabilization deadlines on April 15, which were over due at that time

.

Muddy water in stormwater ditch that flows under Warm Springs Road to stormwater retention depression, which was overflowing to undeveloped and rock piles and open area



Correction requests:
- clean up all mud, rocks, and work with neighbors to clean up their driveways.
- do maintenance on sediment bags
- schedule hydroseed/tacifier for common area on slope that had the most erosion
- install silt fence on inside of curve instead of dirt berm. Dirt berms should no longer be put on any slope, only at the top of slopes
- clean mud out of the drainage ditch
General Inspection5/19/20205/19/20205/19/2020 PASS
DetailsMichael Zawacki
No activity on any building lots. Hillside is starting to grow well, berm still located near corner.
Sidewalk along warm springs has been poured.
Crew working on sidewalk excavation along Teresa. Still some heavy equipment, lift station not in.
No issues at site at time of inspection.
Conference5/1/20205/4/20205/6/2020PDONE
DetailsAndy J. Long
Notified RP to provide schedule on hydrosdeeding and request that they hydroseed all lots. Currently only the front slopes have had revegetation implemented.

WIP on sewer pump house and will soon be working on Teresa to change the interection.
General Inspection5/1/20205/1/20205/1/2020PPASS
DetailsAndy J. Long
No siginificant runoff issues or erosion on site from thunderstorm.

Follow up scheduled to discuss revegetation of some upper areas of the subidvsion that are still bare.
General Inspection4/23/20204/23/20204/23/2020PFAIL
DetailsMichael Zawacki
RP on site
Utility work along warm springs. Lots of tracking across street from Boven. Silt fence will need to be repaired along warm springs.
Upper section is clean. No rills or discharged. Hillside have some growth and held up well.
General Inspection4/15/20204/15/20204/15/2020PPASS
DetailsAndy J. Long
WIP by Track Utilities and crews working on concrete for stormwater and lift stations.

No trackout or discahrges. Slopes have vegetation, tops of slopes have diversion berms.

Still need stabilization of areas that are complete and will now be inactive.
General Inspection4/1/20204/1/20204/1/2020PPASS
DetailsMichael Zawacki
No failures on any hillside.
Channel to lower pond has been rock lined, pond is just a hold but is holding water. Large berms breaking up distance at corner of La Cuesta & Brian way.
All lots have been terraced, still a long straight away on eastern edge.
1 track utilities crew on site. No current issues.
General Inspection3/26/20203/26/20203/26/2020PPASS
DetailsMichael Zawacki
New silt fence installed along Teresa and Warm Springs. Hillside got a reapplication of hydroseed.
Road down to Teresa is now paved and completed.
Work on terracing of lots.
Concrete washout located in back sw corner.
No issues.
General Inspection3/16/20203/16/20203/16/2020PPART
DetailsMichael Zawacki
No failures from rain event.
Crew on site trenching for new silt fence along Warm Springs.
Lots of mud tracked on to site in upper area. Crews are installing Basalit retaining walls terraced on lots. Crew at bottom working on entrance area, looks like they are installing sidewalk. Utilities still not clean and completed.
Areas of armored channel along road still full of dirt from utility contractor. Dirt on teresa in low spot by warm springs, look like there may still be an open trench, currently filled with water, can't tell what the depth is.
General Inspection3/4/20203/4/20203/5/2020 PART
DetailsAndy J. Long
Joint trenching around perimeter is still not complete and the silt fence perimeter is not installed/repair.

On the upper portion, crews are installing sidewalk and small retaining walls between lots. New top of slope berms have been installed.

Concrete washout pan is onsite.

Corrections:

- re-install perimeter silt fence ASAP
- install stormwater control berms, perimeter silt fence and implement ground stabilization for the central common area.
General Inspection2/18/20202/18/20202/18/2020PPART
DetailsMichael Zawacki
Some rilling coming from hillside towards warm springs. All dirt is being contained on site, new berms installed.
New gravel checks along road. New berms installed along road up hill in site, still a long open stretch at corner.
Utility crew not finished. Sidewalk crew on site doing prep work. Ecopan on site at end of dirt spur with no rock or type of stabalization.
Entrance at Teresa not completed.
Lots of dirt on road throughout site.
General Inspection2/14/20202/14/20202/14/2020PPEND
DetailsAndy J. Long
Some additional top of slope diversion berms have been installed. Crew working on sidewalk installation, ecopan onsite.

Lots of loose dirt on subivision streets; silt fence repair/re-installation has not yet occurred. Correctios requested are not complete.

Follow up next week.
General Inspection2/10/20202/10/20202/13/2020PPEND
DetailsAndy J. Long
Sidewalk base preparation and placement in progress. Washout pan onsite.

Track Utilities still active, but should be done next week, at which time silt fence and other BMPs will be added.

Crews will be working on rebuilding, extending, and strengthening retention berms.

Corrections are not complete, but RP has schedule and plan to get site ready to handle more precipitation. Follow up scheduled
General Inspection2/6/20202/6/20202/7/2020PFAIL
DetailsAndy J. Long
Inspection conducted 2/6. Significant amount of erosion within site and muddy runoff leaving site after rainfall and snowmelt.

DIs and gutter bag check dams were maintained after onsite conference last week. New DI bag installed on east side of Teresa. One new berm was installed along the section of road that had a significant blowout.

Did not complete:
- installation of all diversion berms discussed in conference
- perimeter silt fence repair (Track Utilities not finished with joint trench)
- no other additional BMPs within site.


Lots of muddy water reached the drainage ditch across Teresa and the check dams require maintenance. Concrete washout pit has been flooded and is inaccessible due to mud.

Corrections:
- provide above ground concrete washout containment on 2/7. Crew onsite preping for sidewalk
- clean mud off road and out from behind the gutter bag check dams
- check for any maintenance issues on the chip check dams places on east side of Teresa
- keep employees off of mud.
- make plans to order silt fence and install new diversion berms to prevent slope erosion


RP Rhett stated he will order an ecopan and make a site visit. Follow up inspection scheduled.
Conference1/28/20201/28/20201/28/2020PDONE
DetailsAndy J. Long
Met with Rhett and Jim with Granite.

Reviewed corrections:
- once Track is complete, the entire silt fence perimeter will be reinstalled
- clean/sweep road and remove debris collected in gutter.
- change out/maintain all DI bags, install new sediment bag on east side of Teresa.
- need to install additional berms and controls to prevent muddy flow occuring on the curve of the road .
- install silt fences at the intersection

Will start working on maintenance and clean up issues this week and will provide update on the rest.

Dirty runoff is being captured in an open utility trench, flowing through storm drain pipe to another trench closer to Warm Springs and when trench is full flows under Teresa towards the outlet. No flow observed beyond the first gravel check dam plase east of Teresa in the drainage ditch. Will continue to monitor closely.
General Inspection1/27/20201/27/20201/27/2020PFAIL
DetailsAndy J. Long
Corrections needed:

- clean up captured mud behind gravel gutter check bags
- do maintenance on DI bags
- need to install slope diversion berm on lots above the retention pond along Warm Springs.
- need to repair retention berm that has broke on the inside of the curve. Add addional controls.

Will coordinate onsite meeting with Granite to plan corrections after Track Utilities has completed work at the site.
General Inspection1/24/20201/24/20201/24/2020PFAIL
DetailsMichael Zawacki
Track Utilities on site. Trenching along Warm Springs and Teresa. Dirt ramps made on road to get over curbs, lots of dirt and tracking on site.
Poly has been installed along drain to pond to stop rilling.
Some runon to road at top of hill, BMPs installed have been destroyed by being ran over. Berms above still in place, ditch along road has been filled, using area as road, needs new berms at curve on road.
General Inspection1/16/20201/16/20201/16/2020PPART
DetailsMichael Zawacki
Track Utilities on site. Lots of dirt now frozen to road.
General Inspection1/2/20201/2/20201/2/2020PPASS
DetailsMichael Zawacki
Post rain inspection.
Berms worked on diverting water, no rilling coming down hillsides. No undercutting of curbs.
WIp on curbing and apron at entrance.
Some rilling along pipe to storm water pond. Pond needs to be reengineered, not flowing enough. Area will be dug and riprap scheduled to be installed when fixed. No reason to fix now unless it becomes a slope issue, not flowing off site and scheduled to be rebuilt.
General Inspection12/16/201912/20/201912/20/2019PPASS
DetailsAndy J. Long
follow up inspectiion

Teresa is patched. Entrance not yet complete. Once complete street should be well swept.

Berms have been completed to prevent runoff from going over the disturbed slopes. Front Warm Springs slope has been hydroseeded/tacified.


General Inspection12/16/201912/16/201912/16/2019PPEND
DetailsAndy J. Long
WIP connect sewer and water and preping Teresa and entrance to Finnis Terra for temporary asphalt.

Corrections/winterization tasks:
- Fill in missing section of slope diversion berms on top of the steep slope above entrance
- Install slope diversion berm on top of lots along the Warm Springs slope
- Hydroseed/tacify the front Warm Springs slope
- install velocity control rock check dams along the curbing on the long straight strech of road to slow down water and prevent undercutting of the curb
- At the upper end of the rip along the entrance road at bottom of slope, install controls to slow water running down slopes. Suggested silt fence or directing runoff into the riprap channel
- move portapot to location that is not in the mud so that service and workers do not cause additional track out.
- once road and sewer work is complete, sweep Teresa, clean loose dirt and rocks out of the gutter.
- check silt fence perimeter for adequate trenching; area around SWPPP sign and below the rill that formed need trenching and/or addition sediment barriers.

Follow up scheduled for end of week to check on progress.
Conference12/16/201912/16/201912/16/2019PDONE
DetailsAndy J. Long
Onsite meeting with RP to review post rainfall corrections
General Inspection12/12/201912/12/201912/13/2019PFAIL
DetailsAndy J. Long
Slope runon diversion berms not installed along full length of top of slope. Two area of upland runoff have caused formation of a good sized rill.

Additional sediment controls installed on some lots. Muddy runoff flowing into sewer manhole.

Erosion across street has seemed to have increased.

Notified RP to meet on Monday to begin corrective actions.
Tracking Control11/26/201912/6/201912/5/2019ACANC
DetailsAndy J. Long
General Inspection11/27/201911/29/201912/4/2019PPASS
DetailsMichael Zawacki
Site has been paved.
Sewer scheduled to be connected from warm springs up teresa next week. Curbing and paving will be extended all the way to teresa after completion.
Syman is scheduled to finish hydroseeding. One area will have a retaining wall and pump station, waiting for gas company to relocate line so work can begin.
No runoff issues at site, all lots held up. Some trench work on north east of project, installing sewer line.
Sweeper parked on site.
General Inspection11/25/201911/25/201911/27/2019PCANC
DetailsAndy J. Long
General Inspection11/25/201911/25/201911/25/2019PPASS
DetailsMichael Zawacki
Steep hill above entrance has been hydroseeded. Hillside along Teresa started, no spraying done yet along Warm Springs.
General Inspection11/20/201911/20/201911/21/2019PPASS
DetailsMichael Zawacki
Curbing completed at site, did not see any dumped washout. Middle upper section is now surrounded by curbing. Grader on site spreading 3/4 on road bed, hopes to have all done today. Crew will also be on site saturday. Still hoping to pave this year, all is weather dependant.
BVackfill being used to berm lots and above hills. Lots of improvements but not yet completed. Crew on site excavating and repairing some pipes, not sewer. Street was swept, still a bit dirty.
Conference11/13/201911/13/201911/18/2019PDONE
DetailsAndy J. Long
Site walk through and winter stabilization conference conducted. Site is planning to complete paving with curb and gutter before Thanksgiving. Mass grading is complete, slopes have been tracked and top soil spread back on slopes

Action items/correction requests

- repair/re-install perimeter silt fence.
- extend silt fence below disturbed slope next to Teresa (up hill from subdivsion entrance)
- hydroseeding and mulch cover should be applied to all slopes ASAP. Request to order materials and seed mix to be ready
- install slope diversion berm at the top of slopes to prevent runoff from flowing over the slope
- once road is paved, and silt fence re-installed Teresa needs to be swept and the storm drain sediment bag removed to prevent clogging

Follow up on site after road paving for additional winterization controls
General Inspection10/23/201910/23/201910/24/2019PPASS
DetailsMichael Zawacki
No water or pumping, earlier this week was some stagnant water from new lines.
Still need to run pressure sewer up Teresa and from teresa to highland valley.
General Inspection10/14/201910/17/201910/21/2019AFAIL
DetailsMichael Zawacki
All current work is on seweer on Warem Springs and Teresa. Crew has hose coming from line, oily sheen running down Teresa.
Graded lots on site have no berms. no water bars or checks on any of the roads.
General Inspection10/9/201910/10/201910/14/2019APASS
DetailsAndy J. Long
WIP connecting sewer/water at Warm Springs. No corrections at this time, follow up thursday AM during forecasted rain.
General Inspection10/2/201910/2/201910/9/2019PCANC
DetailsAndy J. Long
General Inspection9/26/20199/26/20199/26/2019PPART
DetailsMichael Zawacki
Water lines are staged throughout site, no workers on site.
Lots were bermed when graded, looks like they have been ran over and are no longer contained. Berm in place above southern facing slope.
Still concerned about water velocity coming down roads, no checks or diversions.
Project is still rough enough water should be slowed in most areas. Will need to follow up on BMPs when water lines installed.
Some trackout right outside entrance, kicking up dust when cars go by.
General Inspection9/17/20199/17/20199/17/2019PPASS
DetailsAndy J. Long
BMPs installed. Earthwork/re-grading and pipe work is in progress. No slope erosion or offsite sediment runoff observed. No significant trackout. No corrections at this time.
General Inspection9/16/20199/16/20199/16/2019PPASS
DetailsMichael Zawacki
Site grading in progress.
Water truck on site.
Western lots have been graded, berms left, should hold their own water.
Sewer trench running through nort eastern section, should act as brake for water.
Still some concern on south facing hill above entrance, no grading or berms done at top of slope. Entrance has been extended with driveway gravel.
General Inspection9/4/20199/10/20199/10/2019PCANC
DetailsMichael Zawacki
General Inspection9/9/20199/9/20199/9/2019PPASS
DetailsMichael Zawacki
Post rain inspection.
Site held all water, no rilling or blowouts.
Grading crew is now active on site. Sewer crew is nearing completion.
General Inspection9/6/20199/6/20199/6/2019PPASS
DetailsMichael Zawacki
Post rainfall inspection.
Looks like storm center missed area. Rain acted as dust control, no issues.
General Inspection9/4/20199/5/20199/5/2019PPASS
DetailsMichael Zawacki
Pipe crew on site finishing line. Grade crew is supposed to be at site today. Still needs berms and erosion controls. Will need to monitor when grade crew comes to site.
Water truck on site spraying, no dust issues.
General Inspection8/29/20198/29/20198/29/2019PPEND
DetailsAndy J. Long
Crews have returned to work on site. Water truck onsite for dust control. No trackout observed. No corrections, dry conditions and forecast. Will conitnue to inspect weekly.
Random Inspection8/23/20198/23/20198/23/2019PDONE
DetailsAndy J. Long
Inspection 8/22 1030 AM

No activity or equipment at site. No significant changes at site. Observed some wind blown dust occuring in upper flat area.
Site Preparation8/19/20198/20/20198/20/2019APASS
DetailsAndy J. Long
Site preparation inspection post-SWO.

Corrections made:
- investigation and re-inspection fee paid
- construction entrance installed
- updated SWPPP/ESC site map provided
- silt fence perimeter controls installed
- stockpiles temporarily tacified
- meeting with Granite Excvation conducted at City Hall 8/19 to discuss construction schedule, BMP implementation as site progresses, and site stabilization.

SWO correction requests have been satisfied, SWO is removed. Construction activity at site is now allowed.


Correction needed:
- check that stakes in wattles installed are at least 3-4" into the ground, holding wattle firmly in place in its trench.
Stop Work Order8/9/20198/9/20198/9/2019PDONE
DetailsAndy J. Long
Stop Work Order issued for non-compliance with ESC plan, BCC 9-17, and CGP 2017

see NOV and the SWO in the attached documents
BMP Violation8/8/20198/8/20198/8/2019PFAIL
DetailsMichael Zawacki
Silt fence placed around perimeter, no J-hooks were installed as asked.
No new construction entrance.
No water bars installed on any roads.
Wattle placed at bottom of slope on east side, no way to break flow down hill.
Few small berms installed on easter terraced lots.
Stock piles have been tackified.
No BMPs or berms on top of steep slopes above road.
Some wattle in middle section that may need to be filled,not a pond or retention.
General Inspection7/31/20198/7/20198/8/2019ACANC
DetailsAndy J. Long
follow up on corrections
Conference8/2/20198/5/20198/6/2019PDONE
DetailsAndy J. Long
Meeting with site stormwater team to plan for corrections.

Silt fence and wattle installation to occur Wednesday. Awaiting new site map and other corrective actions detailed in the NOV.
Complaint Inspection7/31/20198/1/20198/1/2019AFAIL
DetailsAndy J. Long
Multiple violations at site:

- inadequate perimeter control installation
- no construction entrance
- no implementation of stabilization measures other than some horizontal tracking.
- no controls to slow the velocity of runoff or diversion berms to direct sheet flow away from slope.
- no sediment protection installed on the drainage inlet on site at the corner near SWPPP box
- dirt encrusted in road and gutter on Teresa


Site has been inactive for over 2 weeks and is in violation of stabilization requirements in addition to many other violations.

NOV to be sent to all stakeholders.
General Inspection7/24/20197/29/20197/29/2019APASS
DetailsMichael Zawacki
Went over site map with RP. Granite will be responsible until utilities completed. Syman will probably be doing BMP installation.
Conference7/18/20197/23/20197/24/2019PCANC
DetailsAndy J. Long
General Inspection7/24/20197/24/20197/24/2019PFAIL
DetailsAndy J. Long
Corrections needed and onsite inspection with Granite SWPPP inspector scheduled for next week.

- clean up gutter on Teresa, replace storm drain sediment bag
- provide schedule of next phase of construction.
- extend existing perimter controls along Teresa to have barrier along entire frontage. Recommend silt fence.
- slope interupting wattle placment should also be determined.

Notified James with Granite. Follow up scheduled.
General Inspection7/18/20197/18/20197/18/2019ADONE
DetailsAndy J. Long
Rough grading complete. Some onsite stormwater retention ponds have been installed. Some slopes have been tracked, but others have not had erosion controls implemented. follow up conference scheduled to discuss slope stabilization and next phases.
General Inspection7/11/20197/16/20197/16/2019PPASS
DetailsAndy J. Long
General Inspection7/3/20197/3/20197/3/2019PPASS
DetailsMichael Zawacki
Hillside frontage around warmsprings is tracked and retention pond dug. Wattle installed along Teresa.
Dust blowing from one dozer, no dust on exposed area without activity. Site has water truck, entire site except one slope has been watered.
No trackout from site.
General Inspection6/13/20196/25/20196/25/2019PPART
DetailsMichael Zawacki
Trackout and mud from site, running sweeper and working to keep tracking from warm springs. Wetting road to prevent dust.
Site is free from blowing dust,area is watered.
General Inspection6/11/20196/13/20196/13/2019PPASS
DetailsMichael Zawacki
Wattle along warm springs, one section has been damaged. Excavator loding trucks and fill being used to lift lower area and make road. Water tank on top of site, water truck spraying site, no dust. Fuel station is in secondary containment. Rock entrance at bottom, only trackout will be from workers.
Site Preparation5/30/20195/31/20196/3/2019APASS
DetailsAndy J. Long
check for construction entrance


Construction entrance is installed per installation details. Crew is in progress rough grading, water truck arrived on site for dust control at time of inspection. Access road is source of dust and was dried out.

Front slope to the right of the entrance is now disturbed. Site needs to install a silt fence at toe of slope along the entrance to prevent runoff at the entrance.

Verbal request to Granite project manager Terrel 2083152350
Site Preparation5/29/20195/29/20195/29/2019PPEND
DetailsAndy J. Long
Pre-construction conference. Project manager Tyrell with Granite is to notify for inspection of completed construction entrance.

Water tank is onsite for grading and dust control,filled by well onsite.