General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 | | PASS |
Michael Zawacki
|
|
|
Development in good shape. 2 lots currently building. No issues.
|
General Inspection | 7/23/2020 | 7/23/2020 | 7/24/2020 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/8/2020 | 7/8/2020 | 7/9/2020 | | PASS |
Michael Zawacki
|
|
|
Neighborhood in good condition. Two homes under construction.
|
General Inspection | 6/23/2020 | 6/23/2020 | 6/24/2020 | | PASS |
Michael Zawacki
|
|
|
Neighborhood in good shape, lots of growth, no issues.
|
General Inspection | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
Michael Zawacki
|
|
|
No issues with site. Individual lots will be dealt with.
|
General Inspection | 5/28/2020 | 5/28/2020 | 5/29/2020 | | PASS |
Michael Zawacki
|
|
|
2 lots disturbed. One has no permits and was issues SWO. Neighborhood has good vegetation and is stable.
|
General Inspection | 5/13/2020 | 5/13/2020 | 5/13/2020 | | PASS |
Michael Zawacki
|
|
|
Site is clean, no issues, no activity.
|
General Inspection | 4/28/2020 | 4/28/2020 | 4/29/2020 | | PEND |
Andy J. Long
|
|
|
No erosion issues observed. No SFH construction, disturbed areas have vegetated.
Request to Rey with Syman to contact client - CGP permit holder Coleman Homes is unresponsive.
Request to remove full sediment bag on the west side of street.
|
General Inspection | 4/13/2020 | 4/13/2020 | 4/14/2020 | | PASS |
Michael Zawacki
|
|
|
No issues at site. Lots of hiker activity on nnew trail head, some missing garbage can.
|
General Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 | | PASS |
Michael Zawacki
|
|
|
Silt fence on bottom lot has been repaired. New wattles on site. DI bags still need maintenance.
|
General Inspection | 3/12/2020 | 3/12/2020 | 3/16/2020 | | FAIL |
Andy J. Long
|
|
|
BMP maintenance needed on sediment bags.
Need to address erosion occuring on lot 3.
Syman doing inspections for Coleman Homes, CGP is not terminated, temporary BMPs still installed. Not all lot vegetated.
No response from Coleman Homes
Here is link to Syman Inspections:
https://drive.google.com/drive/folders/1bx88kw0IpNGE4OXKvzsSqfOQ7rwGtiQ5
|
General Inspection | 2/26/2020 | 2/26/2020 | 2/27/2020 | | PEND |
Andy J. Long
|
|
|
One lot with no soil stabilization with some erosion and sediment runoff to street occuring. Need to determine who owns the lot...
|
General Inspection | 2/11/2020 | 2/11/2020 | 2/11/2020 | | PEND |
Andy J. Long
|
|
|
One open lot with sediment runoff and erosion occuring. Will follow up with subdivision RP or lot owner.
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Michael Zawacki
|
|
|
One small area of runoff at top that has already been cleaned. Site held up well to rain.
|
General Inspection | 1/14/2020 | 1/14/2020 | 1/14/2020 | | DEFR |
Michael Zawacki
|
|
|
Snow covered
|
General Inspection | 12/30/2019 | 12/30/2019 | 12/30/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean, no issues with any of the lots.
|
General Inspection | 12/13/2019 | 12/13/2019 | 12/19/2019 | | PASS |
Andy J. Long
|
|
|
No subdivsion issues observed. BMPs installed. One home under construction, permitted seperately.
|
General Inspection | 11/28/2019 | 11/28/2019 | 12/2/2019 | | PASS |
Michael Zawacki
|
|
|
No workers at site. No trackout or runoff. Around home is gravel.
|
Complaint Inspection | 11/13/2019 | 11/13/2019 | 11/21/2019 | P | PEND |
Andy J. Long
|
|
|
potential fuel spill/unauthorized work reported
work was for geotechnical exploration.
|
General Inspection | 11/7/2019 | 11/7/2019 | 11/8/2019 | | PART |
Michael Zawacki
|
|
|
L3 water truck parked on lower section. Talked to RP for home said someone was on site digging and doing drainage test. They had some tracking they haven't cleaned. I let hillside engineering know they were up here testing.
|
General Inspection | 10/23/2019 | 10/23/2019 | 10/24/2019 | | PASS |
Michael Zawacki
|
|
|
All hillsides are stable, no issues on lots. Some small pieces of trash scattered around site.
|
General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 | | PART |
Michael Zawacki
|
|
|
Silt fence at top and bottom of site can be removed, it is fallen and torn, not doing any good. Landscapers at Lasher site are getting topsoil on the road and will need to sweep when done. Slopes are vegetated.
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean. House still needs landscaping and gutters.
|
General Inspection | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Rainfall inspection. Site is clean, no runoff issues.
|
General Inspection | 9/2/2019 | 9/2/2019 | 9/3/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | | PASS |
Michael Zawacki
|
|
|
No issues with the site. Builders responsible for their own lots.
|
General Inspection | 8/1/2019 | 8/1/2019 | 8/5/2019 | | PASS |
Michael Zawacki
|
|
|
Site is contained. Hillsides are vegetated, roads are clean. 3 site have homes or construction. No blowing dust.
|
General Inspection | 7/17/2019 | 7/17/2019 | 7/17/2019 | | PASS |
Michael Zawacki
|
|
|
Two active homes on site. Will need to watch top lot for dust, foundation has just begun, washout on site, piles of backfill still on site. Road and sidewalks clean. Vegetation has went dormant for summer.
|
General Inspection | 7/2/2019 | 7/2/2019 | 7/2/2019 | | PASS |
Andy J. Long
|
|
|
Subdivision BMPs installed and maintained. No sediment runoff. SFHs permitted seperately,. Disturbed slopes around lots have vegetated.
Permit posted.
|
General Inspection | 6/17/2019 | 6/17/2019 | 6/18/2019 | | PART |
Michael Zawacki
|
|
|
Vegetation has grown in, no issues with site. Builder will need to be responsible for their own areas.
|
BMP Violation | 5/28/2019 | 5/31/2019 | 6/3/2019 | P | PASS |
Andy J. Long
|
|
|
follow up inspection
Silt fence installed along the front of site as requested. No new correction requests at this time.
|
General Inspection | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | FAIL |
Andy J. Long
|
|
|
Silt fences at top of culdesac have not been repaired as previously requested over the last month. Final warning request.
Corrections: - clean up sidewalks - replace silt fence that is damaged at top of culdesac - do maintenance on storm drain sediment bags
|
General Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | | PASS |
Michael Zawacki
|
|
|
All vegetation growing in and areas stable. One home under construction, one finished and still needing landscaping. No ESC issues at site. Silt fence needs few repairs.
|
General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 | | PEND |
Andy J. Long
|
|
|
no clean up or silt fence repair completed as requested. Neighbor notified that road section about sewer manhole has a sink/depression.
|
General Inspection | 4/17/2019 | 4/17/2019 | 4/18/2019 | P | PEND |
Andy J. Long
|
|
|
Correction request to conduct maintenance on the silt fences install at the bottom of the common drive at the top of the culdesac.
|
General Inspection | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Michael Zawacki
|
|
|
Post rain event. No issues at site, no dirt on roads.
|
General Inspection | 4/3/2019 | 4/3/2019 | 4/8/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PART |
Andy J. Long
|
|
|
Lower section of subdivsion has revegetated well. Silt fence containment still installed on west side of Lancaster at bottom of sub. 2 SFHs in progress, permitted seperately.
Correction requests to RP Steve: - fix wattle and silt fence installation along the top common driveway - install additional control along top of driveway, - maintain gravel check bags along the common driveway, scoop out captured sediment, - clean mud off sidwalk at top of culdesace.
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | | PASS |
Michael Zawacki
|
|
|
Neighborhood BMPs still in place. Spoke to workers about cleaning up after themselves.
|
General Inspection | 3/4/2019 | 3/4/2019 | 3/4/2019 | | PART |
Michael Zawacki
|
|
|
Some trackout on site. Not from construction activity, looks like someone drove on upper lots.
|
General Inspection | 2/14/2019 | 2/14/2019 | 2/15/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | PASS |
Michael Zawacki
|
|
|
No BMP failures or ESC issues.
|
General Inspection | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | PASS |
Michael Zawacki
|
|
|
Rainfall inspection. No BMP failures or ESC issues. BMPs need general maintenance.
|
General Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | | PEND |
Michael Zawacki
|
|
|
Some sand coming onto road around silt fence around cul-de-sac. BMPs need some cleanup and general maintenance.
|
General Inspection | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Michael Zawacki
|
|
|
No ESC issues.
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PART |
Michael Zawacki
|
|
|
BMPs still in place with no major failures. Still one home under construction. Silt fence needs to be maintained in places. Inlet protection on lower left needs to be cleaned.
|
General Inspection | 1/1/2019 | 1/1/2019 | 1/3/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/14/2018 | 12/14/2018 | 12/17/2018 | | PASS |
Michael Zawacki
|
|
|
No runoff issues from snow melt or rain. BMPs in good condition. No runoff from one home under construction.
|
General Inspection | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Andy J. Long
|
|
|
NO sediment runoff from open parcels. Hillside erosion controls are opeational, and sediment controls at bottom of site (DI bags, silt fence) are in good condition.
One SFH in sub in progress. Corrections issued to that site ESC18-01021
|
General Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 | | PASS |
Michael Zawacki
|
|
|
No home construction has begun. Wattle and hydroseeding completed. Snake bags on road have been ran over a lot and will need to be monitored.
|
General Inspection | 11/1/2018 | 11/1/2018 | 11/2/2018 | | PASS |
Andy J. Long
|
|
|
Subdivision BMPs installed. No discharges or hillside erosion issues installed. One SFH in progress is in compliance as well.
|
General Inspection | 10/17/2018 | 10/17/2018 | 10/17/2018 | | PASS |
Michael Zawacki
|
|
|
Site clean and BMPs still in place. Contractor swept up in front of house they are working on.
|
General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Michael Zawacki
|
|
|
Neighborhood BMPs still in place, will need to be maintained. Will monitor after rainfall.
|
General Inspection | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PEND |
Michael Zawacki
|
|
|
BMPs need to be maintained before rainy season. Some sections of silt fence are down. ESC contractor should come out and repair and replace what is needed.
|
General Inspection | 9/11/2018 | 9/11/2018 | 9/11/2018 | | PASS |
Michael Zawacki
|
|
|
Only one active home site, has cleaned issues from last inspection. Site is stable and idle.
|
General Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 | | PASS |
Michael Zawacki
|
|
|
One home under construction causing mess, called RP. Rest of site is clean and stable. BMPs are holding up.
|
General Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | | PASS |
Michael Zawacki
|
|
|
Site is stable and inactive. No issues.
|
General Inspection | 7/26/2018 | 7/26/2018 | 7/26/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity, SWPPP reports state west side silt fence needs repair. No major ESC issues or concerns.
|
General Inspection | 7/11/2018 | 7/11/2018 | 7/11/2018 | | PASS |
Michael Zawacki
|
|
|
Sidewalk and curbing installed. Syman is on site repairing the jute above retaining wall on upper lot. Water truck and wagon on site, site now has water source. Very little dust coming from equipment. No construction entrance, site road is still below grade of Lancaster.
|
General Inspection | 6/18/2018 | 6/18/2018 | 6/19/2018 | A | PASS |
Michael Zawacki
|
|
|
Hillside growth is good. BMPs in place. No ESC issues.
|
General Inspection | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Michael Zawacki
|
|
|
New trail for ridge to rivers has been cut in. Some dirt on sidewalk, no major ESC issues.
|
General Inspection | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Michael Zawacki
|
|
|
post rainfall inspection No ESC issues on site.
|
General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
Michael Zawacki
|
|
|
post rain inspection Some sediment has made it past wattle and onto sidewalk on upper end of project. Previously requested corrections not yet complete.
|
General Inspection | 5/14/2018 | 5/14/2018 | 5/15/2018 | P | PASS |
Andy J. Long
|
|
|
No new erosion or sediment runoff issues observed post rain event. BMPs in good condition, site was inspected yesterday.
Correction requests for the next week: - clean up damaged sand bags. - install new DI bag on east side of Lancaster.
|
Random Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Michael Zawacki
|
|
|
All updated BMPs in place. Site has been sprayed with seed and tackifier. Few retention areas have been installed at bottom of slopes. No ESC issues at time of inspection.
|
General Inspection | 4/25/2018 | 4/25/2018 | 4/26/2018 | A | PASS |
Andy J. Long
|
|
|
Corrections requested completed.
Addition silt fence installed along west side and at culdesac common drive entrnace. Slopes have been interupted with earthen berms. Two rows of wattle have been installed on the slope above the retaining wall. Site has been hydroseeded.
No activity at time of inspeciton. No new corrections, will check next week after weekend rain.
|
Conference | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | DONE |
Andy J. Long
|
|
|
Site walk through with RP and Syman Company completed @ 2 PM Monday 4/9 to discuss corrective actions to prevent further sediment runoff and slow down runoff velocity. BMPs to be installed Tuesday PM and hydroseed on Wednesday.
|
General Inspection | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | FAIL |
Andy J. Long
|
|
|
Perimeter wattles insufficient to hold sediment on site. Muddy runoff on culdesac, water deposited sediment/mud in neighbors front yard and driveway.
Lower silt fence on west side of street directing water to neighbors backyard.
Corrections: - J hook silt fence on west side, install slope interupting wattles up hill - Insstall silt fence perimter at top of culdesac - install earth berm/diversion channel at top of common driveway at top. - repair erosion caused by flushing - install wattles on slope above retaining wall - site is to be hydroseeded w/ tacifier this week
- clean up loose sediment on road. Address neighbor concerns about dirt on driveway and in landscaping.]
Waterline crews flushing muddy water due to the sediment on street flowed down street during inspection. Flush water is allowed but requested to not direct water over dirty areas. Too much pressure to do on vegetated slopes. Request to remove storm drain sediment bag to prevent flow of water down Lancaster.
|
Conference | 4/4/2018 | 4/6/2018 | 4/6/2018 | A | DONE |
Andy J. Long
|
|
|
10 meeting & walk through
Corrections discussed:
- hydroseeding to occur on Monday - install earthen berm at top of common drive lots to prevent water from rushing down parellel to road - divert water flowing over the recently graded slope to vegetated area on the east side of culdesac - empty out DI bags - repair section of damaged silt fence on the west side of project
These corrections will occur over next week. RP to notify when in process.
|
General Inspection | 3/30/2018 | 4/2/2018 | 4/4/2018 | P | PEND |
Andy J. Long
|
|
|
Inspection conducted Monday 4/2
Recommended corrections to be discussed with developer and ESC installer
- divide drainage area on west side of Lancaster using water bars or earthen berms - install silt fence J hook along the bottom of site in west side to prevent diverting runoff to neighbor. - large rill has developed above the retaining wall. Install slope drain or direct water back to street instead of over slope - Install addition hillside erosion controls at top of culdesac and along shared driveway to the view lots. Prevent water from channelling parallel to driveway and undercutting it. - apply hydroseed with tacifier (reportedly scheduled for Monday 4/9) - repair damaged silt fence along west side drainage area - remove any unused BMPs (plastic for slope drain)
|
General Inspection | 3/29/2018 | 3/29/2018 | 3/29/2018 | P | PART |
Michael Zawacki
|
|
|
New BMPs have been installed. Road, curb, and gutter are complete. Silt fence on bottom of hill on west side is tearing and has lots of sediment in places. Some wattle on top is nearly covered, other areas have sediment going under. Wattle is installed end to end and not overlapping.
|
BMP Violation | 3/23/2018 | 3/23/2018 | 3/23/2018 | P | PASS |
Andy J. Long
|
|
|
Corrections completed: - street and sidewalks were cleaned - new perimeter wattle installed on upper portion of Lancaster and culdesac. - new silt fence installed at bottom of hill below portapot and on other side at stormwater retention area. - DI bags changed out.
Hydroseeding-tacifier will occur next week.
Site did well to complete corrective actions promptly.
|
Complaint Inspection | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | FAIL |
Andy J. Long
|
|
|
Muddy runoff from the west side of Lancaster and onto neighbors driveway.
Corrections: - clean up loose dirt on sidewalk, neighbors driveway and road - install silt fence in a J hook at discharges point below the porta pot - construct diversion berms or water bars to direct water to the vegetatated basin to the west of project - empty out DI bags
|
General Inspection | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PEND |
Michael Zawacki
|
|
|
Crew on site installing curbing. Cement truck is driving on pit run causing tracking on site. Some sand on sidewalks. Road to lower section is close to paving.
|
Random Inspection | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PEND |
Andy J. Long
|
|
|
No new installations, no recent activity. No sediment runoff to sidewalks occuring, much of site still snow covered but is melting. Will continue to monitor
|
Conference | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | DONE |
Andy J. Long
|
|
|
Schedule update:
RP to order Syman Co. to install wattles on the left (west) side of road where sediment is running on to the sidewalk.
Next steps are to pave the access roads down into basin and also apply hydroseed on the disturbed slopes.
|
General Inspection | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PART |
Andy J. Long
|
|
|
No activity in subdiision at time of inspection.
Corrections needed:
- install sediment control wattles on the west side Lancaster where dirt has been carried onto sidewalk and gutter - set up schedule to hydroseed cut slopes
- storm drains have sediment filter bags installed.
|
General Inspection | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PART |
Michael Zawacki
|
|
|
Most of site is stable and issue free after rain event. Some rilling on southwest side that is carrying sediment into the adjacent gulley and onto sidewalk. Called listed numbers for RP, one is wrong other doesn't have voicemail set up.
|
General Inspection | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Andy J. Long
|
|
|
Post rainfall inspection.
Two rows of silt fence have been installed at outlet of basin on east side of Lancaster. No silt or sediment bypassed the controls. Street is clean and DIs to onsite retention basin are operational. At top of culdesac, slope interupting sediment control wattle have been installed to slow and treat flows on the unpaved access road. No evidence of sediment blowout.
Site RP did well to be pro-active before the storm
Corrections/general maintenance needed: - remove sandbag and accumulated sand & sediment in the old sections of gutters downhill from the new storm drains. - install wattles in j-hook intervals on west side of Lancaster, directly above porta-pot. A small trench was created to direct water away from the sidewalk, but RP stated he will have wattles installed.
Approved.
|
General Inspection | 1/4/2018 | 1/4/2018 | 1/4/2018 | P | PASS |
Michael Zawacki
|
|
|
No new activity since sidewalks and paving of road.
|
General Inspection | 12/18/2017 | 12/18/2017 | 12/21/2017 | P | PART |
Andy J. Long
|
|
|
Corrections neeeded:
-sweep street - remove sandbag check dam and accumulated material out of gutter just downhill from site - make plan for temporary and/or permanent stabilization and perimeter control wattles.
- access driveway on top of culdesac has potential for erosion and sediment runoff unless additional controls are installed.
No spills, discharges, or loose trash laying around site.
|
Complaint Inspection | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | FAIL |
Michael Zawacki
|
|
|
Complaint about concrete washout. Was dumped up top between lots 6 & 7, no washout was used. Also appears truck was hosed of in gutter at entrance to site. Excessive trackout also in the work area.
|
Random Inspection | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PASS |
Michael Zawacki
|
|
|
Main road paved up to cul-de-sac. Lower retaining wall complete. Pile of trash in bottom.
|
General Inspection | 11/21/2017 | 11/28/2017 | 11/28/2017 | P | PASS |
Michael Zawacki
|
|
|
Nampa Paving is prepping road for paving later this week. Excavator with vibrator parked on road, looks like there may be a slight hydraulic leak.
|
General Inspection | 11/22/2017 | 11/22/2017 | 11/22/2017 | A | PASS |
Michael Zawacki
|
|
|
check on hydraulic oil spill cleanup. Concrete washout service truck leaked oil when servicing the bin. First response provided 11/21 PM,
. 11/22 No sign of oil spill. Sweeper has came anf cleaned road.
|
Complaint Inspection | 11/21/2017 | 11/21/2017 | 11/21/2017 | A | PART |
Andy J. Long
|
|
|
No significant evidence of excessive trackout or muddy discharge. No mud in gutters in front of homes as reported. Some sandy trackout does extend through the center of the road and around the concrete washout bin.
Corrections: - street sweeper to visit Lancaster today or tomorrow. - have crew with shovels and brooms clean up in the gutters where the new gutter will meet up with the old gutter. (due next week) - empty concrete washout (due next week)
|
General Inspection | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PEND |
Michael Zawacki
|
|
|
Sidewalk have been installed. Concrete washout on site. Part of sidewalk needed to be removed for installation of DI. There is no rock entrance and trackout is in the road.
|
General Inspection | 11/16/2017 | 11/16/2017 | 11/16/2017 | A | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 11/14/2017 | 11/14/2017 | 11/14/2017 | P | PART |
Andy J. Long
|
|
|
post rainfall inspection.
WIP on curbing. Large concrete washout leak proof bin provided. Will need to make sure that water level does not get to high due to the bin being on a slope.
Some sandy trackout from the road mix is on the road and can be swept after paving. Trash and debris pile has been removed.
Correction:
- clean up both gutters to remove gravel and sand in the existing gutters at the site entrance.
- install a sediment control on the west shoulder behind the curbing. An earthen berm, wattles, or silt fence would work if install above where portapot is.
|
General Inspection | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Michael Zawacki
|
|
|
Site prepped for road and sidewalk installation. Workers placing forms for retaining wall. Big hole in drainage area has been filled in.
|
Tracking Control | 11/6/2017 | 11/7/2017 | 11/8/2017 | A | PART |
Andy J. Long
|
|
|
Street sweeping has been conducted at end of day during the hauling operation. All roadmix material appears to be in place.
Correction request: - crews need to work down Lancaster and clean up all silt/sediment left in gutters , Clean up loose material in the existing gutters at entrance.
|
General Inspection | 11/2/2017 | 11/3/2017 | 11/6/2017 | A | PART |
Andy J. Long
|
|
|
Nampa Paving onsite preping road for paving and curbing. Crews also working on retaining wall, stormwater and sewer installations within the basin on east side of site.
Some evidence of muddy runoff at the entrance, in particular on the west side. Water pooled in area before discharging to gutter. Much of the sediment appears to have been trapped by leaves in gutter. New material has been put down for the road work to prevent water from runnig off in this area.
Sweeper truck has been scheduled this afternoon due to trucks bringing in material to site.
Will follow up tomorrow.
|
General Inspection | 10/31/2017 | 10/31/2017 | 11/2/2017 | P | PEND |
Andy J. Long
|
|
|
NO construction entrance or onsite stormwater retention system in place. Site at considerable ESC risk.
More corrections and inspections scheduled. Inspected 11/1 by MPZ. No discharges or fugitive dust noted. Crews working on permanent stormwater pond/infiltration basin.
|
General Inspection | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PART |
Michael Zawacki
|
|
|
Track utilities currently working on Lancaster road. Site has no construction entrance, trackout onto Lancaster. Perimeter BMPs intact. No muddy runoff going downhill.
|
General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | PART |
Andy J. Long
|
|
|
corrections requested: - sweep up sand on street at site entrance - pick up loose trash; provide trash containment or require contractors to "pack in, pack out" - contact Syman to reconnect the slope drain conveyance to the sediment basin.
Verbal corrections issued to RP Steve.
|
General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 9/19/2017 | 9/19/2017 | 9/21/2017 | P | PEND |
Andy J. Long
|
|
|
Currently there is a large open utility trench at entrance to site. Once work in this area is complete and construction entrance must be installed with 2-3 angular rock.
Syman Co. and RP Steve have been inspecting site. The slope drain is now installed and verbal request to make sure the inlet to the drain does not get under cut by water in the catchment area..
Will install wattle & diversion trench on west side of entrance and dig down to increase sediment retention pond volume.
|
Site Preparation | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 9/6/2017 | 9/11/2017 | 9/11/2017 | A | PEND |
Andy J. Long
|
|
|
10:30 walk through conference developer CMG, ACHD ESC, Syman Co. site ESC contractor
Plan to manage runoff from graded/disturebed road areas to prevent any turbid discharge down Lancaster to exisiting MS4
Syman Co. to construct lined channel and slope drain to temporary sediment basin on the north east existing drainage basin. Will dig to accomodate runoff volume from road, water will initial be received in depression in construction entrance area.
other corrective actions: - increase length of construction entrance - sweeping is scheduled to occur 2x weekly during sewer/water/joint trenching operations.
|
Tracking Control | 8/29/2017 | 8/31/2017 | 8/31/2017 | A | FAIL |
Andy J. Long
|
|
|
check for track out clean up; reassess grading once L3 is offsite
Trackout has been swept, though some still remains and additional sweeping is necessary.
No extra rock installed as requested. Grading is complete. Next phase is retaining wall.
|
Tracking Control | 8/24/2017 | 8/28/2017 | 8/29/2017 | A | FAIL |
Andy J. Long
|
|
|
Trackout on Lancaster is significant, silt fence on west clearing limit has been overtopped by dirt and needs repair or relocation. Construction entrance is not full 50 feet:
Corrections needed: - sweep street before Wednesday PM - schedule meeting for post grading stabilization strategy.
|
General Inspection | 8/9/2017 | 8/24/2017 | 8/24/2017 | A | PART |
Andy J. Long
|
|
|
Permit sign and SWPPP info onsite. Site has inspection report from 8/23. Sediment controls installed at east drainage. Construction entrance installed; water truck doing good job controlling dust from grading activities. Will request an evening crust application to prevent excessive wind blown dust in the evening.
Correction: - sweep street end of day tomorrow - prepare runoff diversion to the vegetated and retention areas tor prevent runoff from flowing down Lancaster.
Follow up inspection scheduled Monday 8/28
|
Site Preparation | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PASS |
Andy J. Long
|
|
|
11 AM requested
ESC permit sign and SWPPP posted on site. RP and developer attended walk through with the BMP installation foreman.
Silt fence installed along the west perimeter of to protect drainage area and contain sediment. On the southwest corner of site where there is a natural flow line/drainage into the existing residential homes, a J-hooked silt fence will be installed as well as wattles coming down slope to the right of the site entrance. L3 is to bring construction entrance rock when they begin grading tomorrow or Friday.
Approved for construction. Post grading inspection scheduled to check on additional BMPs or potential issues once land has been disturbed.
|
Conference | 8/4/2017 | 8/4/2017 | 8/4/2017 | A | FAIL |
Andy J. Long
|
|
|
site not ready for construction. BMPs installed improperly
|