New duplex in the foothills on steep narrow lot; site access is off Shaw Mountain Road and construction entrance/tracking control is required. BMPs down slope will be sediment control wattle and preservation of existing vegetation as much as possible. Rooftop drainage to discharge into rock flow spreader/dissipator with discharge to vegetation below. Water line extension and connection off of Logan. BMP installation and site preparation inspection required. Call 608-7070 or 794-8996 to shedule ESC Inspector
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final3/2/20203/2/20203/2/2020PDONE
DetailsAndy J. Long
Site stormwater, landscaping, and construction of home on city parcel are complete. BLD permit has been finaled with conditions of the hillside drainage/stabilization bond satisfied PW.

ESC Responsible Person/GC will notify homeowner requirement to remove all temporary BMPs installed offsite (in Logan alley).this includes black silt fence and gator guard wattle. If the homeowner and neighbors choose to leave them through Spring, that is at their discretion. No further requests or ESC inspections

*BMPs installed for the Logan alley sewer project (orange/wire back silt fence and straw wattle) should remain unltil alley issues are resolved by ACHD and Boise Public Works, which have been notified. ESC division does not have authority of the Logan alley ROW..
DOC - Permit Finaled3/2/20203/2/20203/2/2020PPASS
DetailsAndy J. Long
General Inspection2/6/20202/6/20202/12/2020 PEND
DetailsAndy J. Long
Site is vegetated and has stormwater drainage complete. No evidence on new runoff from site to the Logan alley.

Logan alley still has erosion issues. Temporary BMPs installed are preventing alley runoff from flowing to neighbors yards. To close permit, need to remove the temporary BMPs but permit holder does not want to be responsible for runoff from the alley if it causes issues.

Conferring with builder, ACHD, and Boise PW Sewer.

General Inspection1/22/20201/22/20201/23/2020 PEND
DetailsAndy J. Long
Home is complete. Permit open to monitor spring runoff and alley and maintenance of the temporary controls currently installed.
General Inspection1/7/20201/7/20201/8/2020 PASS
DetailsMichael Zawacki
Site clean and stable. Silt fence installed on ACHD ROW.
General Inspection12/23/201912/23/201912/24/2019 PASS
DetailsAndy J. Long
General Inspection12/6/201912/6/201912/6/2019 PASS
DetailsMichael Zawacki
Home is completed and landscaped. Silt fence still on and along ACHD ROW.
General Inspection11/21/201911/21/201911/21/2019 PASS
DetailsAndy J. Long
No recent precipitation. No issues. Silt fences still installed on alley.
General Inspection11/6/201911/6/201911/6/2019 PASS
DetailsAndy J. Long
Monitoring revegetation and alley. HOme is occupied. No issues observed. No changes to alley or silt fences installed.
General Inspection10/22/201910/22/201910/22/2019 PEND
DetailsAndy J. Long
Home complete. Case open to check with resolution on the orange silt fence installed during work on the alley.
General Inspection10/4/201910/7/201910/7/2019PPASS
DetailsAndy J. Long
Noon w/ Dave

Disturbed area is now stablized/landscaped. Onsite drainage swale and lined channel installed. Homeowner has a revegetation bond issued.

RP to remove construction materials located at bottom of lot. Logan alley BMPs (silt fence/gatorguards) will remian till further resolution resolution on Logan alley and Shaw Mtn runoff.
General Inspection9/30/20199/30/201910/4/2019 PEND
DetailsAndy J. Long
landscaping and onsite drainage installed.

Temp BMPs in Logan alley still installed. Orange is installed by sewer crew. Need to fix water bar wattles to keep directing water to the retention pond
General Inspection9/13/20199/13/20199/16/2019 PASS
DetailsMichael Zawacki
Landscaping mostly done. Water is being directed down armored area into onsite retention.
General Inspection8/29/20198/29/20198/29/2019 PASS
DetailsMichael Zawacki
Upper area near shaw now has grass, broken sandbags are gone. Silt fence still installed on ACHD right of way. Will monitor.
General Inspection8/14/20198/14/20198/14/2019 PART
DetailsMichael Zawacki
Almost all sandbags along shaw mountain have been destroyed, just piles of sand now. No vegetation at all on lot. A few rows of gatorguard and section of silt fence on upper end, new lined channel made on site. Silt fence still installed on ACHD right of way.
General Inspection7/30/20197/30/20197/31/2019 PASS
DetailsAndy J. Long
Landscaping still in progress. Downslope silt fence system is still installed.
General Inspection7/15/20197/15/20197/15/2019 PASS
DetailsAndy J. Long
Landscaping and onsite drainage still in progress. Silt fence downslope protection installed.
General Inspection6/28/20196/28/20196/28/2019 PASS
DetailsAndy J. Long
Landscaping and onsite drainage project is not complete. No new issues. BMPs installed.
General Inspection6/13/20196/13/20196/14/2019 PASS
DetailsAndy J. Long
Some landscaping has occured but is not yet complete. BMPs still installed to control flow of water from Shaw Mtn road, Logan alley, and from site.. No corrections requested.
General Inspection5/29/20195/29/20195/30/2019PPASS
DetailsAndy J. Long
Sheet flow from road has not passed through site. BMPs are installed include sand bag barrier, sand bag check dams, wire back silt fence, and and a silt fence across alley directing runoff to a temporary sediment basin.
Conference5/23/20195/23/20195/23/2019PDONE
DetailsAndy J. Long
RP-GC added additional sand bags along Shaw Mtn Road, installed wire back silt fence in two locations as well as the gator guard wattle that were dislodged by the concentrated flow. Homeowner had the St. Francis Woods apartment's parking lot cleaned.

Onsite confernece with ACHD stormwater quantity team to looks the runoff from the road. No final decision or solution was reached, more investigation needed.

Public Works will come to remove the lower section of orange silt fence and wattle once the yard is landscaped and has all onsite drainage swales constructed.

For temporary prevention of more flooding, a wire -backed silt fence will be installed across of Logan alley to direct runoff onto the lower section of parcel. Additional storage space will be added in this area to prevent flooding and continued flow to the south side of the alley.
General Inspection5/21/20195/21/20195/21/2019PFAIL
DetailsAndy J. Long
Runoff from Shaw Mtn Road and the yard passed through sand bags, wattles, and silt fence and has eroded Logan alley road base into neighboring lots that had silt fence sediment barriers.

Case pending
General Inspection5/15/20195/15/20195/17/2019 PASS
DetailsAndy J. Long
ESC BMPs installed properly and working. No muddy runoff to neighboring lots observed after rain event. No trackout. HOme is now occupied, but has not been landscaped/stabilized.

No corrections requested.
General Inspection4/30/20194/30/20195/3/2019 PASS
DetailsAndy J. Long
Driveway now has asphalt. House is occupied. Bond issued for revegetation and landscaping. Tempory BMPs and silt fence are installed and will need to be removed once stabilization and Logan alley road situation is resolved.

No issues observed.
General Inspection4/15/20194/15/20194/18/2019 PART
DetailsAndy J. Long
No new discharges or breaches of perimter controls.

Correction request to install concrete washout for a cement work. And to repair wattles that current crew is in process of destroying.
General Inspection3/29/20193/29/20193/29/2019PPASS
DetailsAndy J. Long
Corrective actions to address the runoff from Shaw Mountain have been completed.
- new sand bag diverision to prevent water from cutting over disturbed slope.
- two rows of slope interupting wattles.
- silt fence catchment between driveway wall and tree where runoff was traveling.
- cleaned up and removed silt fence parallel to alley, replaced with new silt fence.

These are temporary controls until landscaping, driveway, and additional site grading can be completed. Working with ACHD and Boise PW on status of the Logan alley .
Conference3/28/20193/29/20193/29/2019PPEND
DetailsAndy J. Long
Sheet flow from Shaw Mtn crossing over disturbed area has caused issues.

RP-GC has crew on way to do maintenance on silt fence, repair rills/channels on slope of Shaw Mtn, install slope interupting wattles, and additial silt fence between driveway wall and tree/alley.

Will follow up to check on work. Will need to clean up any dirt that passed over wattles and silt fence.

PW investigating alley construction as well as ACHD.

General Inspection3/28/20193/28/20193/28/2019PFAIL
DetailsAndy J. Long
Post rainfall inspection.

Lack of erosion BMPs on cut slope caused significant erosion. Too much water from Shaw Mtn allowed to come across disturbed areas of lot. Silt fence installed saved site from flooding neighbors home again.

Call placed to RP-GC to schedule onsite meeting to review corrective actions needed.
General Inspection3/27/20193/27/20193/27/2019 PASS
DetailsMichael Zawacki
No runoff coming from ACHD right of way. Driveway still not completed, no trackout.
General Inspection3/12/20193/12/20193/12/2019PPASS
DetailsMichael Zawacki
No dirt leaving site.
General Inspection2/28/20192/28/20192/28/2019 PASS
DetailsMichael Zawacki
No runoff from site.
General Inspection2/12/20192/13/20192/19/2019PCANC
DetailsAndy J. Long
General Inspection2/6/20192/6/20192/12/2019 CANC
DetailsAndy J. Long
rescheduled
General Inspection1/22/20191/22/20191/22/2019 PASS
DetailsMichael Zawacki
Fill brought in for driveway up top.
Site is muddy and contained. BMPs held up and worked during rain event.
General Inspection1/7/20191/7/20191/7/2019 PART
DetailsMichael Zawacki
Wattle along Logan extension have been removed in places and need to be replaced. Prep for driveway at top. Site was frozen at time of inspection.
General Inspection12/14/201812/21/201812/24/2018ACANC
DetailsAndy J. Long
Conference12/13/201812/14/201812/14/2018ADONE
DetailsAndy J. Long
1130 AM

Meeting with Boise PW, ACHD, and GC- RP Dave.

Temporary controls on downhill side of Logan will remain installed till Spring. Road grade and stormwater mgmt for alley way runoff will be re-assessed at that time.

Roof top storm drains and driveway drain that connects to infiltration trech/swale will reduce stormwater volume as well as landscaping on uphill side of Logan alley.

For temporary ESC, RP will install silt fence along the lower corner to direct runoff to the flat pullout access at bottom of lot. Water will infiltrate here as well as run to the grassy areas.

Follow up next week.
Conference12/12/201812/12/201812/12/2018PDONE
DetailsAndy J. Long
Meeting with ACHD, public works, and neighbor to discuss issues with new road base of Logan alley as well as runoff from site.

Site needs to reinstall perimeter controls until landscaping and stabilization can occur.

Temporary silt fences will also need to be removed at end of project.

Meeting with RP-GC and ACHD will be scheduled.
General Inspection12/10/201812/10/201812/10/2018 PEND
DetailsAndy J. Long
road mix layed placed on Logan Alley row. Sandy material covers mud, but causing some sandy trackout. Need to check if this is permitted surface and additional controls to retain runoff on site and check sediment controls.
General Inspection11/23/201811/23/201811/26/2018 PASS
DetailsMichael Zawacki
New wattles were installed after ACHD completed their work. Walls have been poured up top for rtention for driveway, water shouldn't flow across site any more. No ESC issues,most work is now all inside.
General Inspection11/8/201811/8/201811/8/2018 PASS
DetailsMichael Zawacki
ACHD project Logan St sewer extension currently running through project. No ESC issues with duplex.
General Inspection10/24/201810/24/201810/25/2018 PASS
DetailsMichael Zawacki
All BMPs in place. Lower gator guard is starting to tear and lose filling.
Sewer contractor on road in front of home, using lower area for storage. Road is currently closed and torn up. Public Works is on site.
General Inspection10/9/201810/9/201810/9/2018PPART
DetailsAndy J. Long
Hillside wattles and gator guard diversion on Logan alley ROW worked to trap sediment and divert flows to areas onsite instead of at bottom of hill.

Some muddy water still making it to bottom of Logan, should install and checks below final gatorguard.
General Inspection10/9/201810/9/201810/9/2018PPASS
DetailsMichael Zawacki
Rainfall inspection.
BMPs were repaired, no runoff issues, everything contained.
General Inspection10/4/201810/4/201810/4/2018APASS
DetailsAndy J. Long
Rainfall inspection.

No runoff from site to Logan. BMPs installed, no trackout.
General Inspection10/2/201810/2/201810/2/2018PPEND
DetailsMichael Zawacki
BMPs still all in place, some are a bit damaged and beat up. RP should determine if they are ok with condition and make needed changes before rain event.
General Inspection9/25/20189/25/20189/25/2018 PASS
DetailsMichael Zawacki
All BMPs still in place. Gator guard on driveway has been ran over and flattened, still will work but needs to be watched. All work today is on interior.
General Inspection9/10/20189/10/20189/10/2018 PASS
DetailsMichael Zawacki
All BMPS still in place. Work is on interior of home. No ESC issues.
General Inspection8/24/20188/24/20188/27/2018 PART
DetailsAndy J. Long
WIP on interior. Hilliside BMPs installed, some section of wattles need stakes re-installed due to movement by sub contractors. Trash around site contained. Silt fence barrier to protect neighbor's yard is installed. Lower section needs maintenance.

No driveway or roof gutters installed yet. Logan alley ROW has two gator guard water bars that channel water to the lower landing area onsite.

Corrections needed:
- resecure damaged or relocated wattles on slope between home and Logan alley.
- re-install silt fence at bottom of installation so that it J-hooks to trap sediment and not allow water to flow off alley to yard below.
- plan to have gutters installed in September or ASAP to prevent runoff flowing over disturbed slopes.
General Inspection8/9/20188/9/20188/9/2018 PASS
DetailsMichael Zawacki
Gator guard across driveway, wattle on hillside by home, sand bags above home. Neighbors yard has silt fence running along perimeter, Site clean no ESC issues.
General Inspection7/24/20187/25/20187/26/2018APASS
DetailsAndy J. Long
WIP on interior; framing and roofing complete. No gutter or down spouts installed yet.

Trash around site is picked up; permit sign is posted. Two gator gaurd wattles are installed across Logan ROW to direct water to north side of road away from homes on Floral.

Hillside wattles are staked, one section around the trash bin access should be re-staked and trenched at any time of inactivity or forecasted rain, RP-GC notified. No discharges or new erosion. Dry conditions.
General Inspection7/19/20187/19/20187/24/2018PCANC
DetailsAndy J. Long
rescheduled
General Inspection7/6/20187/6/20187/6/2018 PASS
DetailsAndy J. Long
General Inspection6/19/20186/21/20186/22/2018APASS
DetailsAndy J. Long
follow up inspection

Wattles re-trenched where failures occured, some sections re-positioned.

Two gator guard wattles installed across road to divert flows away from neighboring properties. Upper section diverts water to a retention area (lower staging area) .

No new corrections.

Conference6/19/20186/19/20186/19/2018PFAIL
DetailsAndy J. Long
Stormwater runoff from construction site and additional flows from Shaw Mtn. Road flowed down the Logan alley ROW and deposited some eroded sediment onto property at 1010 Floral

Correction request:
- begin clean and removal of sediment on grass and scrape bottom of Logan. Refresh construction entrance rock.
- street sweeping on Logan and Floral after mud dries
- install more durable wattle (gatorguard) that can be installed across Logan to direct any flow away from 1010 Floral to the grass area by Shaw Mtn Apartments.
- at lowest terraced staging area, a sandbag or other diversion/conveyance barrier will capture flow from above and send to the leveled area rather than down Logan.
- repair and re-install wattles where water passed under. Remove captured sediment.
- install tempory roof gutter system to send water to the seepage bed rather than flowing off roof to ground.

RP-GC onsite. Syman Company and other corrections must be started today. Notified ACHD that there is evidence of more flow from Shaw Mtn on the Logan ROW section.


Conference6/15/20186/15/20186/15/2018PDONE
DetailsAndy J. Long
Onsite meeting with RP/GC Dave and Syman Company wattle installation crew.

Reviewed placement and installation specifications on wattle. 2" minimum trench,and backfill compaction, Stakes center of wattle, 5 ft spacing and firmly anchored into ground. Tightly butted wattles will be allowed for this project.

Wattles have been relocated in areas so that crews can still access sides of home without driving over wattle. Relocated top wattle to make a settling area for potential run-on and to spread flows to lower wattles and to Logan ROW north side.

Requested that RP monitor subcontractors that remove any sections of wattle for access that they properly re-install wattles.
General Inspection6/11/20186/12/20186/13/2018AFAIL
DetailsAndy J. Long
No new erosion or sediment runoff observed.

Wattles are still not staked in areas, no changes to run on area from road.

Loose trash around lower dumpster area has been picked up.

Syman Co. to return to site to re-install sections of wattles that are not staked or trenched.
General Inspection6/8/20186/8/20186/11/2018PPEND
DetailsAndy J. Long
General Inspection6/6/20186/6/20186/6/2018PPEND
DetailsAndy J. Long
Co-inspection with ACHD ESC Inspector.

Corrections still in progress. Remaining corrections needed:

- re-install wattles properly. See ESC plan/IDEQ BMPs for construction details.

- if subcontractors need to access an area above the wattle, they must remove the wattle and then re-install rather than driving over them.

- pick up all loose lumber and trash around lower staging area.

- extend wattle sections in areas where runoff from the site could still flow to Logan in order to act as a perimeter sediment control, alternatively divert runoff to the onsite seepage bed if possible.

- excavator to dig retention area and or earthen berm along upper section or alternative solution to slow/divert runoff

- Recommendation to fill and compact the large gully off Shaw Mtn Rd. that directs water to site through the vegetated section by the tree. Block runoff access and install wattles or sand bags to direct water down the shoulder in less of a concentrated flow through the exposed area on your site.

Follow up Friday 6/8 PM
BMP Violation6/4/20186/4/20186/4/2018PPART
DetailsAndy J. Long
Sediment runoff at bottom of Logan @ Floral has been swept.

Additional slope interupting and perimeter wattles have been installed. Sand bag check dams have been placed in channel behind home to slow runoff. Silt fence installed along neighbors fence with hook to direct runoff away from landscaped yard back to Logan.

No activity at time of inspection.

Corrections remaining:
- re-install wattles at top of hill to be trenched in and staked properly. Still not trenched along the full length.
- finish street and bottom of hill sediment accumulation clean up.
- pick up loose trash and unused lumber.
Conference6/1/20186/1/20186/1/2018PPEND
DetailsAndy J. Long
2 PM 6/1

Onsite follow up inspection with GC-RP.

Street sweeper to come this evening for cleaning up dried mud at bottom of hill @ Logan and Floral.

Syman crew has not yet arrived but is scheduled today to install more wattle and re-trench/backfill wattles. Additional sand bag check dams will be installed on the channel between home and Shaw Mountain.
General Inspection5/31/20185/31/20186/1/2018PPEND
DetailsAndy J. Long
Inspection follow up 4:30 PM 5/31. Syman crew onsite installing wattles. Trash box moved onto parcel and out of the Logan ROW.

Crew to return tomorrow to complete silt fence installation. Requested that watttles be trenched in and secured with stakes at minimum of every 4ft.

Working with ACHD to address ROW concerns and sheet flow from Shaw Mountain Rd. that came through the site.
Conference5/31/20185/31/20185/31/2018APEND
DetailsAndy J. Long
1030

runoff from site deposited mud in neighbors yard. RP-GC Dave reported it.

Rain from recently installed roof, Shaw Mtn Road sheet flow ran off site carrying mud into neighbors yard. GC working with homeowner to repair (landscaping is visiting site tomorrow).

Corrective actions:
- relocate trash box and pile of lumber that divert some flows toward neighbors yard.
- install wattles and/or check dams along channels. Intercept and slow roadway run-on, capture flow of roof top water, utilize existing ponding spots. Make sure wattles are trenched and backfilled/compacted
- clean up mud accumulated at bottom of hill. After initial mud clean street will need to be swept by end of day tomorrow
- clean up loose material around site.
- excavator to be on site for additional earthen berm and clean up.

GC working on getting crew and BMPs on site to start corrections today
General Inspection5/18/20185/18/20185/18/2018 PASS
DetailsMichael Zawacki
Site contained, no run off issues.
Site will need lumber scrap pickup soon.
General Inspection5/3/20185/3/20185/3/2018 PASS
DetailsMichael Zawacki
Work on vertical construction. Workers parking off site. No dust or trackout.
General Inspection4/18/20184/18/20184/18/2018 PASS
DetailsMichael Zawacki
WIP on framing. Nothing leaving site, long drive and buffer before road.
General Inspection4/3/20184/3/20184/3/2018 PASS
DetailsMichael Zawacki
WIP on vertical. No runoff from site. Garbage will be cleaned daily.
General Inspection3/19/20183/19/20183/21/2018 PASS
DetailsMichael Zawacki
WIP. Framing has just begun. All material stored on site. No ESC issues.
General Inspection3/2/20183/2/20183/2/2018 PASS
DetailsMichael Zawacki
Washout has been cleaned up. No new work on site.
General Inspection2/15/20182/15/20182/15/2018 PART
DetailsMichael Zawacki
Washout needs to be cleaned up.
General Inspection1/31/20181/31/20181/31/2018 FAIL
DetailsMichael Zawacki
Washout was dumped straight onto ground and left, needs to be cleaned and washout installed for future concrete work.
General Inspection1/16/20181/16/20181/16/2018 PASS
DetailsAndy J. Long
WIP on foundation. Site has construction entrance and permit sign is posted. No trackout or muddy runoff observed.
General Inspection1/1/20181/1/20181/2/2018 PASS
DetailsMichael Zawacki
Concrete walls and foundation complete. No workers on site. No issues observed.
General Inspection12/15/201712/15/201712/15/2017 PASS
DetailsMichael Zawacki
Pumping concrete for walls. Area is clean.
General Inspection11/30/201711/30/201711/30/2017 PASS
DetailsMichael Zawacki
Entrance installed and in use. Foundation poured. No erosion issues at this time.
General Inspection11/15/201711/15/201711/15/2017 PEND
DetailsMichael Zawacki
Workers installing forms for foundation. Site will need a washout. A construction entrance will need to be constructed, current drive is becoming wet and trackout likely.
General Inspection10/31/201710/31/201710/31/2017 PASS
DetailsMichael Zawacki
No signs of new work. Permit wasn't posted, I installed one. Everything staying on site.
General Inspection10/12/201710/13/201710/13/2017APASS
DetailsMichael Zawacki
Natural vegetation buffer in use. No sign of runoff or tracking.
General Inspection10/5/201710/9/201710/10/2017PCANC
DetailsAndy J. Long
General Inspection9/22/20179/27/201710/5/2017ACANC
DetailsAndy J. Long
General Inspection8/31/20179/19/20179/22/2017PCANC
DetailsAndy J. Long
Site Preparation8/31/20178/31/20178/31/2017PCANC
DetailsAndy J. Long
duplicate inspection
Site Preparation8/31/20178/31/20178/31/2017PPASS
DetailsAndy J. Long
David ###-####

Current access is off Logan street, which is gravel leading up to site. Excavator is to preserve vegetation below the foundation footprint . Once access to Shaw Mtn is establish a construction entrance will be installed. Excavator to clear flat parking/staging area below site on Logan.

Approved for construciton.
Site Final8/31/20178/31/20178/31/2017PCANC
DetailsAndy J. Long
General Inspection2/21/20202/21/2020   
DetailsAndy J. Long