Permit Information
Permit NumberESC16-01561
StatusFinaled
Name ZACHARY MEYERS
Site Address 3302 E BARBER VALLEY DR
Project NameBarber Valley Townhomes 4/5
Customer Number 
ePlanReviewNo
Description
ESC permit issued to cover current staging and construction related activity for Park Place at Barber Station. The same parcel and area of disturbance will soon be the next phase. This permit will cover grading and utilility work and attached to GRD permit. Sediment control wattle to be installed between construction area and Walling Creek pathway. Vegetation along bank to be undisturbed. Trackout controls, concrete washout contaiment, and regular inspection required. Note: no NOI information at time of submittal, submittal for City of Boise requirements only
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/12/20199/12/20199/12/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled9/12/20199/12/20199/12/2019PPASS
DetailsMichael Zawacki
General Inspection8/28/20198/28/20198/29/2019 PEND
DetailsAndy J. Long
Storm drains to have sedimet bags remain installed as pretreatment and shall be maintained by HOA.

Still need to do final sweeep up and construciton material clean up, porta pot removal, and clean up parking area along Homestretch, walk creek path for any loose construction trash observed.
Site Final8/8/20198/13/20198/14/2019ACANC
DetailsAndy J. Long
General Inspection8/8/20198/8/20198/8/2019 CANC
DetailsAndy J. Long
rescheduled for site final. RP to call to notify when all temporary BMPs are removed.
General Inspection7/24/20197/24/20197/24/2019 PEND
DetailsAndy J. Long
construction complete. See site final corrections needed.
Site Final7/24/20197/24/20197/24/2019PNR
DetailsAndy J. Long
Corrections needed to get ESC site final:
- remove all temporary storm drain bags installed on Exacta, Trifecta, and Homestead.
- sweep and clean up dirt and debris in gutter at Walling Creek end of Homestead.
- remove portapots and any other construction materials.
Site Final7/8/20197/9/20197/9/2019PNR
DetailsMichael Zawacki
Landscapers on site finishing up. Inlet protection still installed at site.
General Inspection7/8/20197/8/20197/8/2019 CANC
DetailsAndy J. Long
General Inspection6/21/20196/21/20196/21/2019 CANC
DetailsAndy J. Long
General Inspection6/6/20196/6/20196/6/2019 CANC
DetailsAndy J. Long
General Inspection5/22/20195/22/20195/22/2019 CANC
DetailsAndy J. Long
General Inspection5/7/20195/7/20195/7/2019 PASS
DetailsMichael Zawacki
Work on last few townhomes. All trash contained and majority of area landscaped.
General Inspection4/22/20194/22/20194/22/2019 PASS
DetailsAndy J. Long
Project near completion. Finishing up units along Barber Valley Drive.

Temporary BMPs still installed will need to be removed upon completion in addition to a Walling Creek trash search and pickup:
- silt fence barrier along Walling Creek
- DI bags withing phases 4-5
- remove and clean up area where concrete washout bin was located in the staging area down the street.

No violations observed.
-
General Inspection4/5/20194/5/20194/8/2019 PART
DetailsMichael Zawacki
Working on last set of townhomes, some loose trash. Landscapers on site, only about a third of area has been landscaped. Silt fence still along rear perimeter by creek.
General Inspection3/21/20193/21/20193/25/2019 CANC
DetailsAndy J. Long
General Inspection3/6/20193/6/20193/6/2019 PASS
DetailsMichael Zawacki
WIP on last two units. ARea still needs landscaping completed.
General Inspection2/19/20192/19/20192/26/2019 CANC
DetailsMichael Zawacki
General Inspection2/4/20192/4/20192/6/2019 PASS
DetailsMichael Zawacki
WIP on framing on two units. Trash pickup needed for wood scraps.
General Inspection1/18/20191/18/20191/18/2019 PASS
DetailsMichael Zawacki
WIP on framing building, one has foundation completed and no other work. Some material stored on sidewalk. No dirt leaving site, no ESC issues.
General Inspection12/31/201812/31/201812/31/2018 PASS
DetailsMichael Zawacki
WIP on foundation of unit next to road. Silt fence still along greenbelt, all rear construction complete. Site is clean.
General Inspection12/14/201812/14/201812/14/2018 PEND
DetailsMichael Zawacki
Front loader loading backfill into truck, will need to be swept when completed.
New foundation installed, currently covered in blankets. Most work on existing buildings is all inside, exterior work minor.
General Inspection11/27/201811/29/201811/29/2018APASS
DetailsMichael Zawacki
Work along greenbelt and creek done, silt fence can be removed at any time.
Few units still under construction in middle of development, area is clean.
General Inspection11/21/201811/21/201811/27/2018 CANC
DetailsAndy J. Long
General Inspection11/6/201811/6/201811/6/2018 PASS
DetailsMichael Zawacki
Silt fence still along creek. Workers are parked on vacant lot in site, will need to watch for trackout when weather arrives. Lots of units are sold, site being kept clean. No wind blown trash.
General Inspection10/22/201810/22/201810/22/2018 PASS
DetailsMichael Zawacki
Construction complete on units by creek. Silt fence still in place and creek side of path needs landscaping. Most work is interior, area is clean. No longer any large stockpiles of building material, no stucco littering site.
General Inspection10/5/201810/5/201810/5/2018 CANC
DetailsAndy J. Long
General Inspection9/20/20189/20/20189/20/2018 PASS
DetailsMichael Zawacki
Masons are finishing last home on creek and greenbelt side, landscapers have started working at other end. Trash removal company was on site.
Will need to continue with daily cleanups. Nothing was leaving site at time of inspection.
Random Inspection9/5/20189/5/20189/5/2018PPASS
DetailsAndy J. Long
Need to continue daily trash pick up.

Silt fence has been installed along Walling Creek. Area will be revegetated and re-sodded once work is complete and landscaping is complete. No significant amounts of trash found along path & creekside.
Complaint Inspection8/23/20188/23/20188/24/2018PPASS
DetailsAndy J. Long
trash complaint along Walling Creek

Minor amount of trash picked up during perimter walk. RP on duty, reported daily trash pick up is occuring. No trackout or discharges from site.

Request to RP to make sure crew sweeps sidewalk path where stucco is being applied.
General Inspection8/15/20188/15/20188/15/2018 PASS
DetailsMichael Zawacki
Still using greenbelt area. They are aware of the parks concern and are going to clean and resod when finished. Site produces lots of trash, clean as they go, will be massive site cleanup before landscaping. Most building waste is in or around bins. Nothing leaving work area.
General Inspection7/31/20187/31/20188/1/2018 PEND
DetailsMichael Zawacki
Lots of small loose trash around site. Cherry picker being used on sidewalk along creek, grass will need to be repaired. Talked with RP while on site, said trash boxes are emptied weekly, trash is picked up by laborers everyday. will monitor.
Random Inspection7/16/20187/16/20187/16/2018PPASS
DetailsAndy J. Long
Perimeter trash inspection. No large items or significant amounts of loose trash along the Walling Creeek path. Need to continue trash pick up everyday between units and during installation of foam siding material.

No discharges. Old wattles have been removed. RP on duty.
General Inspection7/13/20187/13/20187/13/2018 PASS
DetailsMichael Zawacki
Met with RP while on site. Some trash and dirt in site and along green belt. RP says they do a walkthrough and cleanup at end of work days.
General Inspection6/20/20186/28/20186/28/2018PPASS
DetailsMichael Zawacki
No blowing trash. Few lots have lots of building waste on site. Concrete washouts will soon need to be emptied.
General Inspection6/18/20186/18/20186/20/2018 PART
DetailsAndy J. Long
Trash mostly picked up. ESC permit signs posted. No fugitive dust, discharges or trackout to Barber Valley.

corrections needed:
- direct trash crew to pick up any loose/lightweight trash between buildings along the Walling Creek corridor.
- empty the overflowing bin at NW corner of site(remove items and put in the bins with capacity)
- remove & clean up wattles that have been driven over and no longer useable

Correction request issued to Braxton with Brighton. Will follow up next week 6/28.
Complaint Inspection6/1/20186/1/20186/1/2018PPASS
DetailsAndy J. Long
trash complaint

Walked perimeter of site. Only a few items of trash discovered, appears pick up crew has been checking the area regularly. Trash bins have been emptied. No trackout or discharges. Wattle along Greenbelt has been unstaked for equipment access, will need to be re-installed next week.
General Inspection5/30/20185/30/20185/30/2018 PART
DetailsMichael Zawacki
Wattle has been installed on east end protecting wetlands. Still lots of trash scattered around building sites. Some trackout onto interior roads. Homes on western edge have lots of lumber waste and are storing material all over grounds. Hunter home washouts are nearly full, washout on north side of project is almost full.
General Inspection5/10/20185/15/20185/14/2018APART
DetailsAndy J. Long
Trash still an issue. Daily pick up around perimeter is required. No new accumulations or issues, but still many loose items around site. Boxes have been emptied on Friday.

Need new SWPPP sign for Barber Valley phase 4/5 NPDES #IDR10007S located at entrance of site.
General Inspection5/8/20185/10/20185/10/2018APEND
DetailsAndy J. Long
trash follow up

Some trash still found along perimeter of site in vegetation of Walling Creek during inspection. Windy conditions making trash control difficult. Full bins are to have pallets or boards placed over them to prevent wind from blowing out items. Bins are to be emptied tomorrow. Walked site with RP, ordered that trash pick up crew should pass by Walling Creek at a minimum of once per day..

Trash crew (2 workers, 1 full time, 1 part time ) covers Park Place each day and also picks up in River Heights.
Complaint Inspection5/8/20185/8/20185/8/2018PFAIL
DetailsAndy J. Long
Corrections needed. Notice issued to RP Zach with Brighton Corp and Braxton with Brighton Homes.

- pick up trash along Walling Creek. Enact daily or other day trash collection around perimeter, in particular along the wetland area.
- provide additional trash box for next set of units on Exacta
- post new SWPPP signage in clear and visible spot next to project
General Inspection5/2/20185/2/20185/2/2018 PASS
DetailsAndy J. Long
WIP on townhomes in phase. Trash contained and picked up around site. No trackout or fugitive dust observed. No discharges. Concrete washout pans located in open area across BV Drive. No corrections
General Inspection4/17/20184/17/20184/17/2018 PASS
DetailsMichael Zawacki
Staging area clean. Phase 2 of townhomes needs some trash pickup, few boxes full.
General Inspection4/2/20184/2/20184/5/2018 PASS
DetailsAndy J. Long
General Inspection3/16/20183/16/20183/20/2018 PART
DetailsAndy J. Long
No trackout or uncontained washouts around site. Storm drains have sediment filter bags installed that have remaining capacity.

No significant amount of trash along Walling Creek, lots of wind blown trash from full dumpsters along Barber Valley Drive.

Corrections request to Brighton Homes trash crew to perfom pick up along sidewalk and road and to have full dumpsters emptied asap.
General Inspection3/1/20183/1/20183/5/2018 PART
DetailsMichael Zawacki
WIP on new phase. Site is clean, can use some lumber scrap cleanup. No BMPs between site and greenbelt, old wattle is rotted away.
General Inspection2/14/20182/14/20182/15/2018 PASS
DetailsMichael Zawacki
Track utilities on site doing horizontal boring. Still in use as a staging and storage area.
General Inspection1/30/20181/30/20181/30/2018AFAIL
DetailsAndy J. Long
Loose trash, full trash containers, and debris all over west side of BV townhomes phase 3 and around all active work areas.

Two wood and plastic dump piles in staging aree need to be hauled away with trash pick this week. Brighton Homes clean up employee will need to address this area.
General Inspection1/30/20181/30/20181/30/2018APART
DetailsAndy J. Long
WIP on BV townhomes phase 4/5. No trackout or discharges observed. Trash containers onsite. Lots of dirt in gutters. Sediment bags installed on drains.

RP for Brighton Homes onsite. Notified that this week a new employee will be hired to focus on trash pick up, gutter sweeping, and BMP maintenance full time at the BV townhome projects.

Will check next week for improved trash pickup. No trash along Walling Creek, but within site lots of potential for wind blown litter.

With full time clean up person, will waive request to install fencing unless trash in creek banks becomes issue.
General Inspection1/26/20181/26/20181/29/2018 CANC
DetailsAndy J. Long
BMP Violation1/10/20181/11/20181/12/2018APASS
DetailsAndy J. Long
Trash picked up throughout subdivision. No fencing or other changes observed. No discharges.

WIP on utiility trenching along Barber Valley Dr. Moving stockpiles around site. Trackout to BV drve will need sweep at end of operation.
BMP Violation1/5/20181/9/20181/10/2018ACANC
DetailsAndy J. Long
General Inspection1/5/20181/5/20181/5/2018 FAIL
DetailsAndy J. Long
Corrections needed:

- trash pick up
- provide trash containment
- clean mud and dirt out of gutters in front of active projects

No trackout to Barber Valley, DIs within sub have sediment protection. No dirt or runoff crossing Greenbelt towards Walling Creek.

Follow up inspection Tuesday Jan 9th

Verbal corrections issued to Zach with Brighton Corp and Erbie with Brighton Homes.
General Inspection12/21/201712/21/201712/21/2017 PASS
DetailsMichael Zawacki
No issues. No trash or track out.
General Inspection12/6/201712/6/201712/6/2017 PASS
DetailsMichael Zawacki
No dirt leaving staging storage area. Free from trash.
General Inspection11/21/201711/21/201711/22/2017 PASS
DetailsMichael Zawacki
Staging area. No new disturbances. No trackout or fugitive dust/dirt.
General Inspection11/3/201711/6/201711/6/2017APASS
DetailsMichael Zawacki
No new disturbing activities
General Inspection11/3/201711/3/201711/3/2017 CANC
DetailsAndy J. Long
General Inspection10/19/201710/19/201710/24/2017 PASS
DetailsMichael Zawacki
No new activities or disturbance.
General Inspection10/4/201710/4/201710/4/2017 CANC
DetailsAndy J. Long
General Inspection9/19/20179/19/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection9/1/20179/1/20179/5/2017 CANC
DetailsAndy J. Long
Site Final8/15/20178/17/20178/17/2017PCANC
DetailsAndy J. Long
intended to be a PW drainage inspection
General Inspection8/2/20178/2/20178/2/2017 CANC
DetailsAndy J. Long
General Inspection7/17/20177/17/20177/17/2017PPASS
DetailsMelissa Jannusch
Grading is complete. curb and street are installed. No dust, no trackout, trash contained. No corrections requested.
General Inspection7/13/20177/13/20177/13/2017PPASS
DetailsAndy J. Long
No activity. New streets and stormwater infrastructure installed. DI's fitted with sediment bags. Wattles and vegetation preserved next to Walling Creek pathway
General Inspection6/28/20176/28/20176/28/2017APASS
DetailsMelissa Jannusch
Next section of townhomes has begun. No trackout, trash is contained. No ESC issues observed.
General Inspection5/30/20175/30/20175/30/2017PPASS
DetailsAndy J. Long
WIP on interior access road and gutter. Subsurface utility work complete. Sediment control wattle properly installed at edge of sidewalk path along Walling Creek. No fugitive dust occuring.

No immediate corrections needed, but will need to remove dewatering phase outlet materials along the west end of Walling Creek. Regularly inspect creek area for loose constuction materials and litter. Suggest installing fence during the vertical construciton of townhomes.
General Inspection5/19/20175/19/20175/19/2017PPASS
DetailsMelissa Jannusch
Water from walling creek is flooding marine Williams park parking lot and flowing into the road. Water is entering the DI on the south side of the road by the completed town homes. Called RP and told him to remove DI bags on N side of the road if water begins flowing over the meridian.
General Inspection4/11/20174/14/20174/18/2017APASS
DetailsMelissa Jannusch
Water still ponded in auxiliary parking area. Water is clean and discharging into Walling Creek. Once dewatering is complete for this phase a cleanup of the wetland and creek area will be necessary.
Site Preparation4/11/20174/14/20174/13/2017ACANC
DetailsMelissa Jannusch
General Inspection4/10/20174/11/20174/11/2017APASS
DetailsMelissa Jannusch
Water is sheet flowing into walling creek. The first discharge point is slowly releasing water into the creek and providing filtering. The second discharge point is not providing filtering but the water entering the creek is clean. The rest of the water is sheet flowing into the creek. No plume detected.
General Inspection4/10/20174/10/20174/10/2017APASS
DetailsMelissa Jannusch
Dewatering occurring for last phases of utilities. Water is spilling into walling creek.
Random Inspection3/13/20173/13/20173/13/2017PPASS
DetailsMelissa Jannusch
Dewatering operation is ongoing. There is no visible plume entering walling creek or the wetland. The discharge is too great for the spillways and the second spillways BMPs are no longer providing residence time or filtration. At the end of the site the water is sheet flowing through the riparian area into walling creek. This discharge appears clean.
General Inspection3/9/20173/9/20173/9/2017PPASS
DetailsMelissa Jannusch
Checked on dewatering operation. Discharge is clean. No corrections. Discharge rate has been reduced from yesterdays flow rate.
General Inspection3/6/20173/7/20173/7/2017APASS
DetailsMelissa Jannusch
RP is conducting turbidity testing on discharge points. The channel length through the site has been increased. Additional BMPs have been added to the first discharge point. Overflows are occurring on the North portion of the site near the bridge. The water is overflowing the berms sheet flowing through the vegetation and into the creek. All discharges appear clean. No plume is visible currently. Requested RP ensure the SWPPP is kept up to date and contains the turbidity measurement. Dewatering operation is currently okay.
General Inspection3/6/20173/6/20173/6/2017PFAIL
DetailsAndy J. Long
Dewatering check up...

Dewatering stopped over weekend and has resumed today. Extra water onsite continues to overwhelm the land application & infliltration area. 3 discharges points occuring, the discharge outlet closest to construction area and away from Parkcenter Bridge has a turbid discharge with visible flume in Walling Creek wetland.

Notified RP to come onsite to superivise corrections. Notified Brown Consruction foreman of issue and requested to close off this outlet with issues and/or install extra filtering & damming BMPs . Brown stated turbidity samples were taken this morning...

Investigation and corrective actions in progress.
Random Inspection3/2/20173/2/20173/2/2017PPASS
DetailsMelissa Jannusch
Dewatering operation update: Water has filled the site designated for sheet flow and infiltration of the dewatering water as well as the contingency settling site. Two overflow spill ways have been installed that are discharging water into the creek adjacent to the site.

The first over flow spill way is comprised of a dirt berm channel with three wattles to slow water flow and catch sediment. The discharge appears clean with no plume in the creek visible.

The other overflow set up is comprised of a wattle slowing discharge from the site. The water then enters a pipe. The outlet to the pipe has plastic sheeting underneath it to prevent scour/erosion at the outlet. There is another wattle placed at the bottom of the plastic sheet to slow the water and catch the sediment before the discharge enters the stream. The water appears clean with no plume visible.

The RP should update the SWPPP to reflect changes to the dewatering plan. At the end of the dewatering operation ensure the BMPs are cleaned up so they do not enter the stream. Left message with RP.
General Inspection2/27/20172/27/20172/28/2017PPART
DetailsAndy J. Long
check on dewatering that started this morning

Dewatering from sewer installation in progress and started yesterday. The water is remaining within bermed areas for land application with infiltration. No flow to Walling Creek observed. Water is not flowing turbid. Approved.

Correction request:

During walk through, observed windblown trash and wrappings in Walling Creek wetland area from Barber Valley townhomes. Need to have crew fish out and collect trash this week.
General Inspection2/23/20172/23/20172/23/2017PPASS
DetailsMelissa Jannusch
Site Preparation2/16/20172/21/20172/21/2017APASS
DetailsMelissa Jannusch
Site BMPs are in place. Dewatering plan: sheet flow water over site. no discharge into stream. Stockpiles on adjacent lot okay. Perimeter BMPs are in place. Met with Zach (RP) on site. He will post sign and SWPPP at site.
Okay to start.