Permit Information
Permit NumberESC17-00954
StatusIssued
Name JOHN CLONINGER
Site Address 3450 N WINSOME RD
Project NameWin Hollow Sub
Customer Number 
ePlanReviewNo
Description
9 Lot Subdivision in designated foothills zone. CGP eNOI filed under IDR1000LG. ESC site plan with narrative sheet submitted. BMPs include staging area with waste and washout facilities, fiber rolls for sediment capture and slope interuption, slope tracking/roughening, and post construction revegetation. Runoff from upland disturbed areas must be retained in temporary sediment basins if the permanent stormwater ponds are not yet constructed. ESC site preparation inspection is REQUIRED post BMP installation and before earth disturbance occurs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/6/20208/6/20208/6/2020 PASS
DetailsMichael Zawacki
No issues with sub.
General Inspection7/22/20207/22/20207/22/2020 CANC
DetailsAndy J. Long
General Inspection7/7/20207/7/20207/9/2020 PASS
DetailsMichael Zawacki
All ots clean and stable, lots of vegetation. No issues at site.
General Inspection6/22/20206/22/20206/22/2020 PASS
DetailsMichael Zawacki
Site has go0od vegetative cover. No issues with any of the lots. All area is clean, nothing coming from access road.
General Inspection6/5/20206/5/20206/5/2020 CANC
DetailsAndy J. Long
General Inspection5/21/20205/21/20205/21/2020 PASS
DetailsMichael Zawacki
Site is clean. Runoff from one lot, will contact builder.
General Inspection5/6/20205/6/20205/6/2020 PASS
DetailsMichael Zawacki
All lots have good growth. No runoff or tracking. RP is on site daily.
General Inspection4/21/20204/21/20204/21/2020 PASS
DetailsMichael Zawacki
Vacant lots are vegetated. Completed homes are now landscaped. No issues at site, rp on site daily.
General Inspection4/6/20204/6/20204/6/2020 PASS
DetailsAndy J. Long
No ESC issues, no corrections requests at this time. Disturbed areas have revegetated, some SFH construction is in progress. No recent excvations. Will need to remove DI bags at Bogust Basin once the Johnson house is complete.
General Inspection3/20/20203/20/20203/20/2020 CANC
DetailsAndy J. Long
General Inspection3/5/20203/5/20203/5/2020PPASS
DetailsMichael Zawacki
All lots without homes are stable with good growth. Nothing coming off road above site. Nobody parked on empty lots.
General Inspection2/26/20202/26/20203/5/2020 CANC
DetailsAndy J. Long
General Inspection2/11/20202/11/20202/11/2020 PASS
DetailsMichael Zawacki
All common area and lots stable. No esc issues. Builder taking reponsibility for their own lots.
General Inspection1/27/20201/27/20201/27/2020PPASS
DetailsMichael Zawacki
No major issues at site. Owneres taking responsibility for own sites.
One vehicles worth of tracking from Zekes house, sent message to John.
General Inspection1/14/20201/14/20201/14/2020 DEFR
DetailsMichael Zawacki
Snow covered
General Inspection12/30/201912/30/201912/30/2019 PASS
DetailsMichael Zawacki
Only issues at one lot, owner has been notified many times.
General Inspection12/13/201912/13/201912/17/2019PPASS
DetailsAndy J. Long
No new erosion issues observed. Open lots have good vegetation establishment and ground cover. SFHs in progress permitted seperately. No corrections requested.
General Inspection12/6/201912/6/201912/9/2019 PASS
DetailsMichael Zawacki
Site held up well to rain, no issues at site.
General Inspection11/21/201911/21/201911/21/2019 PASS
DetailsMichael Zawacki
Subdivision is clean. No issues after walk through with rp.
Conference11/1/201911/6/201911/6/2019APASS
DetailsAndy J. Long
10 AM

Subdivision RP has cleaned up broken gravel bag check dams from gutter, had the street swept, and conducted maintenance on the storm drain controls at Winsome & Bogus Basin.

Stormwater control berms and retention areas do not have any damage, hillside and undisturbed lots have good vegetation.

Site is in compliance, no further corrections requested.

SFHs in progress are permitted separately.
General Inspection10/24/201910/28/201910/28/2019AFAIL
DetailsAndy J. Long
request BMP mainteance (rock bag check dams are broken)
Remove and clean up dirt collected behind gravel check bags.

Clean out collected dirt from storm drain protection measures installed around inlets.

Need to increase maintenance of BMPs or remove them.
General Inspection10/24/201910/24/201910/24/2019 CANC
DetailsAndy J. Long
rescheduled
General Inspection10/8/201910/9/201910/9/2019APASS
DetailsMichael Zawacki
Site is in good condition. Some dirt on road coming from area where all water mains branch off. Individual buiulders responsible for their own lots.
General Inspection9/30/20199/30/20199/30/2019 PASS
DetailsMichael Zawacki
No esc issues at site. Talked to John about removing old destroyed snake bags, he is after builders who ran them over to remove them.
General Inspection9/13/20199/13/20199/13/2019 PASS
DetailsMichael Zawacki
Gravel bags need to be replaced. No major issues at site. ll lots are clean.
General Inspection8/29/20198/29/20198/29/2019 PASS
DetailsMichael Zawacki
Hillsides are all stable, each builder is responsible for their own lot.
Gravek snake bags should be replacd, they've bben ran over so much they are all broken.
General Inspection8/13/20198/14/20198/19/2019PPASS
DetailsAndy J. Long
Vegetation growing well. No wind blown trash around subdivsion, street is clean. No spills or discharges observed. Dry, hot conditions, no dust observed. Multiples SFHs in progress, permitted seperately.

Routine maintenance and cleaning is needed on the rock check bags at entrance to subdivsion.
General Inspection8/6/20198/6/20198/13/2019 CANC
DetailsAndy J. Long
General Inspection7/22/20197/22/20197/22/2019PPASS
DetailsMichael Zawacki
Vegetation has started to go dormant. No new construction. No issues at site
General Inspection7/9/20197/9/20197/9/2019PPASS
DetailsAndy J. Long
No trackout or discharges in subdivision. No sediment runoff from slopes onto sidewalk. Site vegetation has grown. Dry weather conditions.

Site needs to continue to do regular maintenance on gutter sediment check bags and sweep up broken bags as needed.
General Inspection6/25/20196/25/20196/26/2019 PASS
DetailsAndy J. Long
No trackout or discharges. Need to maintain/clean behind gutter bag checks.

Slopes are revegetating well. Slope at end of culdesac on lot 6 between berm and sidewalk pretty sparse.
General Inspection6/7/20196/10/20196/14/2019PPASS
DetailsAndy J. Long
No sediment runoff or other issues observed. Construction entrance at end of culdesac had rock swept back. No new activity occuring.
General Inspection5/29/20195/29/20195/29/2019PPASS
DetailsMichael Zawacki
post rain inspection
ACHD sweeper working on Winsome.
Neighborhood snake bags need sediment cleaned and destroyed ones should be thrown away. First lot on left holding water. Talked to RPs about issues on their own lots.
No major issues with anything in neighborhood.
General Inspection5/17/20195/17/20195/17/2019APART
DetailsMichael Zawacki
Bottom left lot had channel along sidewalk. I directed water to one discharge point and moved snake bags to contain. Water above immediately cleared up.
No major issues or runoff from lots. Lots of vegetation and BMPs installed as reuested.
New owner of first left lot needs to come and get lot up to standard.
General Inspection5/15/20195/15/20195/16/2019 PASS
DetailsAndy J. Long
Subdivsion BMPs installed, hillside vegetation is growing well. Gutter check bags have been maintained. Lot 7 has a new retention berm installed. No corrections requested at this time.
General Inspection4/30/20194/30/20195/3/2019PPASS
DetailsMichael Zawacki
No major issues at site, has been dry. Hillside vegetation growing in. Home with roofs still don't have gutters and may have concentrated flow when it rains. Gravel snake bags ran over and falling apart. Some loose trash blown from house on left into vacant lot.
General Inspection4/24/20194/24/20194/24/2019 PASS
DetailsMichael Zawacki
No major issues after last storm event. Builders are taking responsibility for their own lots. No current runoff or trackout issues from vacant lots. Some sweeping on sidewalks needed, no major issues.
General Inspection4/9/20194/9/20194/9/2019APASS
DetailsMichael Zawacki
post rainfall inspection
Site improvements requested were made and are working.
Ponds are now receiving water. Berms on lots are preventing excessive runoff. Upper lot is discharging to ponds and no longer running to road. No flooding of neighbors driveway, no mud at Bogus Basin Rd.
Rock bags will need some maintenance, people can't resist running them over.
General Inspection3/28/20193/29/20194/3/2019ACANC
DetailsAndy J. Long
General Inspection4/3/20194/3/20194/3/2019PPASS
DetailsAndy J. Long
All corrections listed in NOV and inspection request on 3/14 have been completed to reach compliance. Runoff retention and filtering/diversion has prevented more turbid discharges to lower Winsome.

Corrections/alterations needed in two locations on current plan:
- lot 7 perimeter wattle needs J- hooks or additional wattle up hill from last wattle to prevent water from channelling and running parallel to wattle and discharging near the gravel access road.
- lot 6 needs to install sediment controls on both sides of the construction entrance.

Note: lot 5 and lot 10 permitted seperately also have correction requests.
General Inspection3/26/20193/26/20193/28/2019PPEND
DetailsAndy J. Long
Corrections and report detailing corrective actions received. Inspection of subdivsion during rain event showed that changes were effective.

Full walk through inspeciton scheduled.
General Inspection3/14/20193/22/20193/22/2019PPASS
DetailsMichael Zawacki
Site has been cleaned up. Stockpiles on upper lot (3535%have been reduced, new berm built to divert water into upper pond instaed of flowing all the way down. Berm built on bottom of lot (3535) as well, wattle also between berm and rock channel.
Berm rebuilt on bottom of lot 3477.
Gator guard at lot 3455 has been cleaned.
Conference3/13/20193/14/20193/14/2019ADONE
DetailsAndy J. Long
Site walk through completed with RP John and Boise ESC inspectors on Wednesday 3/13 @ 3:30 - 4:30 PM.

Corrections discussed on each lot

Lot 1: install perimeter wattle along sidewalk and wattle at top of slope as shown on the ESC site map.

Lot 6:
- Repair water bars on private driveway to direct runoff into pond #2
- smooth out tire ruts around the curve around pond #2 that is directing water over the slope. Remove accumulated sediment behind the slope wattles.
- remove full concrete washout; provide new washout for future concrete work
- pick up loose trash in ponds
- make sure construction entrance is 50 ft as noted on ESC site plan

Lot 7-8:
- remove dumped concrete washout (reportedly from driveway work done outside of subdivision)
- make plan for using stockpiles or revegetating/stabilizing/perimeter wattle if they are to remain inactive
- roughen surface, vegetate, and/or add berms (compost?) on long sloped surface to slow down water velocity.
- install row of wattle (trenched and staked every 4-5 ft) midway on the slope between the temporary retention berm and the culdesac & access road. Area does not appear to have any revegetation occuring and will need additional application and monitoring
- at the upper end of parcel, next to pond #1, create water bar berm to make sure no runoff from the upper areas is bypassing the pond for retention.
- make plan to address erosion around the banks and armored channel inflow to pond #1.

Lot 9: make retention berm a uniform height and make sure there are no outlets to lot #10 downhill, but rather a stabilized spillway to the street.

Street:
- remove any remaining damaged gravel bag check dams. (many have already been replaced)
- clean up loose dirt collected around the storm drain and check bags around the drop inlets at Bogus Basin Road.


Operator will work on corrections over the next week. Follow up Friday 3/22.

Once corrections and modifications are made, a new ESC site map shall be submitted to ESC inspectors.

Fines assessed must be paid before 3/22/2019
General Inspection3/12/20193/12/20193/12/2019PPART
DetailsAndy J. Long
Some correction requests issued were completed as conditions allowed. NOV issued 2/13/2019 has been updated based on compliance meeting conducted 3/8, submittal of updated ESC site plan on 3/8, and onsite insepction on 3/11. Correction requests must be address by 3/22.

o Lot numbers listed on submitted map are incorrect. Please correct and resubmit. See parcel map below for correct lot numbers.
o Lot 1: Fiber rolls are not installed as indicated. Less than 70% vegetation establishment on bank, will need to be scheduled for re-application of approved seed mix. Install fiber rolls per ESC site map.
o Lot 3-4: Please identify ownership and responsibility for maintenance of existing BMPs on these lots.
o Lot 5: owned and permitted separately, see ESC18-01433 for site specific corrections
o Lot 6 (Zeke Johnson residence, see also ESC18-01455):
? full concrete washout next to private driveway needs removal and/or replacement. Placement is not indicated on site specific ESC map nor the subdivision ESC map.
? “Protective Berm” drawn in green is not installed as drawn.
? Upper pond, pond #2 is not shown on map and has some erosion from runoff from the private drive.
? Lower water bar for pond #2 needs to be rebuilt/improved to capture sheet flow from private drive.
? Water bar for pond #3 needs to be rebuilt/improved to capture sheet flow from private drive.
? Runoff from the private drive is running off road at curve around pond #2 and down slope towards the culdesac. Wattle installed mid slope needs maintenance, re-trenching and staking, rill should be raked and tracked. Runoff should be directed into pond #2 as shown on drainage plan.
? Construction entrance should measure 50 ft. in length as listed in ESC site map.
o Lot 7:
? All inactive stockpiles on site need to be stabilized. Located near the lower end of pond #1 and next to the new seepage bed.
? Uncontained washout dumped on lot needs to be cleaned up
? Large disturbed area is compacted, no surface roughening, no vegetation. This area needs implementation of stabilization measures.
? Slope between protective berm does not have 70% vegetation established. Needs to be re-seeded and slope interrupting wattle or fiber roll installed. Armored slope drain or similar alternative should direct berm overflow into the new seepage bed added next to access road
? Erosion occurring on the banks of pond #1 inlet needs to be repaired. Windblown construction trash in pond needs to be picked up.
o Lot 8: Open space. Areas of less than 70% vegetation established observed. Needs further inspection and analysis. More berms or controls to slow runoff velocity should be implemented.
o Lot 9: Berm installed for temporary runoff retention pond needs to have a uniform height and stabilized outfall to the road. The berm has a break in it that directs flow onto the backyard of Lot 10.
o Lot 10: owned and permitted separately, see ESC18-01244 for site specific corrections
o Lot 11: Owned separately, construction plans and permits under review. Lot has a new temporary sediment basin/trench dug for managing upper runoff – who will be inspecting and monitoring this feature?
o Street and gutter: All broken gravel bags should be cleaned up and gravel re-rebagged and installed properly in gutter. Consider additional perimeter controls as alternative to broken gravel bags.
o Street should be swept at a minimum of twice a month by street sweeper.


- Schedule meeting onsite with all home builders and lot owners with the City of Boise ESC inspectors.
General Inspection2/27/20192/27/20192/27/2019PFAIL
DetailsMichael Zawacki
Post rain inspection.
Discharge in gutters exceeds max range of 1000ntus on each side.
Improvements for retention have been made on upper lot.
General Inspection2/25/20192/25/20192/25/2019PFAIL
DetailsMichael Zawacki
For reference left and right refers to sides while driving up road into site.
Rill forming from upper left lot, sediment has filled rock channel and water is on road.
New gravel bags were added to left side of road, old torn ones also still in place. Sediment is being trapped and needs to be cleaned.
Trackout coming from both upper left and right drives.
Storm water leaving in gutter on ledt side of site, tested at 784 NTU at 9:53 AM.
Flow from right side was minimal, was unable to fill a testing vile, no visible plume in trickle of water.
Conference2/13/20192/14/20192/15/2019AFAIL
DetailsAndy J. Long
Inspection and site conference with RP and the two SFH RPs that are in progress conducted at 10:30. Turbidity sampling conducted at site and at outfall to Crane Creek, tributary to the Boise River.


-Significant Violation: Illicit stormwater discharge due to runoff polluted with eroded sediment. On February 14th at 10:30 AM, turbidity samples taken in gutter directly below site on Winsome were above the measurement level of 1000 NTU. Crane Creek outfall discharge at 170 NTU. Visible plume in Crane Creek from outfall observed on February 13th at 4:00 PM.


-Significant Violation: Uncontained concrete washout dumped and never cleaned on lot 11, pH of runoff from was 10.8 on digital pH monitor.


-Routine Violation: Unmaintained/damaged BMPs on site. Notification given of retention berm damage on February 4th provided to Responsible Person, no effective corrective actions were implemented. No crew or RP onsite Wednesday PM during heavy rain to monitor and address issues.

-Routine Violation: ESC BMPs are not installed per the approved ESC plan

Notice of Violation issued to site. Over 2 hours and two ESC inspectors investigating the site for this inspection.
General Inspection2/13/20192/13/20192/13/2019PFAIL
DetailsAndy J. Long
Muddy runoff flowing offsite to sidewalks and gutters. Main source is the access road at end of culdesac that is getting eroded soil from adjacent bank that has a retention berm that has failed.

Water also running down from SFH (ESC18-01433) along construcion entrance and undercutting gator guard wattles.

Water is also channeling parrallel to sidewalk cause erosion and sediment runoff.

Conference needed to discuss BMPs.

Muddy discharge to Crane Creek tracked.
General Inspection2/4/20192/4/20192/4/2019 FAIL
DetailsAndy J. Long
Evidence of muddy runoff and erosion occuring on upper area that discharges to the access road to the common area.

Corrections neeeded:

- Fix berm at end of culdesac and install addition perimeter controls as well as slope interupting wattles
- clean up and/or replace all gravel check bags
- check on sediment filter bags to do maintenance once water drains through.
Tracking Control1/18/20191/18/20191/18/2019PPEND
DetailsAndy J. Long
Correction request to RP John to order street sweeper to clean up after SFH covered under ESC18-01244.
General Inspection1/8/20191/8/20191/8/2019PFAIL
DetailsMichael Zawacki
Lots of mud on road.
General Inspection12/26/201812/26/201812/26/2018 PART
DetailsMichael Zawacki
Loader moving lumber to homesite is tracking mud.hout nearly full. Neighborhood BMPs still in place, no failures or issues.
General Inspection12/11/201812/11/201812/11/2018 PASS
DetailsAndy J. Long
Subdivision BMPs installed. Wintery conditions, no runoff occuring yet. Two SFHs in progress, permitted seperately. Will need to work on cleaning road as ice and snow chunks melt.
General Inspection11/26/201811/26/201811/26/2018 PART
DetailsMichael Zawacki
Most gravel snake bags have been ran over and need to be replaced.
One home has foundation work, outpak located across street.
Fence company on site with skid steer boring out post holes.
General Inspection11/9/201811/9/201811/9/2018 PASS
DetailsMichael Zawacki
All neighborhood BMPs in place. Some new trench work for sewers, all contained.
General Inspection10/25/201810/25/201810/26/2018 PASS
DetailsAndy J. Long
Erosion controls including tacifier application and slope interupting wattles are installed. Sediment controls installed are perimeter wattles for sediment barriers, rock bag and weighted check dam bags in gutter to trap sediment. DI bags installed at bottom of Winsome @ Bogus Basin.

No corrections requested at this time.
General Inspection10/9/201810/9/201810/9/2018PPASS
DetailsMichael Zawacki
rainfall inspection
RP on site. No turbid runoff at time of inspection, all BMPs working.
General Inspection10/4/201810/4/201810/4/2018PPASS
DetailsMichael Zawacki
No runoff from any of the lots. Hydroseeding scheduled for end of month.
General Inspection9/28/20189/28/20189/28/2018 PASS
DetailsMichael Zawacki
Neighborhood BMPs installed, area is clean. No homes have begun.
General Inspection9/13/20189/13/20189/13/2018PPASS
DetailsMichael Zawacki
All lots are bermed. Check dams in place on long driveways, gravel snake bags in road. 2 pallets of wattle on site, none installed above sidewalks and below berms.
General Inspection9/12/20189/12/20189/13/2018 PASS
DetailsMichael Zawacki
General Inspection8/28/20188/28/20188/28/2018 PASS
DetailsMichael Zawacki
Gravel snake bags acting as checks along gutter. Most of site is now stabalized. Wattle on hillsides, rock check dams where new driveways will be. No ESC issues.
General Inspection8/10/20188/10/20188/10/2018 PASS
DetailsMichael Zawacki
No workers on site. Some new riprap channels in place. Some small areas of dirt creeping onto sidewalks. Wattle along some exposed hillsides.
General Inspection7/26/20187/26/20187/26/2018 PASS
DetailsMichael Zawacki
Road now paves, curb and gutters completed. Drive way to upper lot has been prepped but not paved. New rock channel replaced rill from upper lot. Rock check dams are across future driveways on hillside.
No blowing dust at site.
General Inspection7/11/20187/11/20187/11/2018 PASS
DetailsMichael Zawacki
No new activity.
Some areas of silt fence are torn and need maintenance. Hydroseeded hillsides have good coverage, lots have sporadic weeds.
No ESC issues
General Inspection6/26/20186/26/20186/26/2018APASS
DetailsMichael Zawacki
Pusher is on site setting pins in prep for sidewalk, pour is anticipated for Monday. Knife River swept street around entrance. Water wagon and water truck on site. No wash out currently on site.
Random Inspection6/19/20186/19/20186/19/2018PPASS
DetailsMichael Zawacki
Post Rain Inspection.
Some trackout, entrance has been removed. Road bed was graded lower than incoming existing road, creating a channell onto Winsome was avoided. Neighbors driveway that flooded before was clean.
Trackout will need to be addressed if rock entrance isn't rebuilt.
General Inspection6/18/20186/18/20186/18/2018PPEND
DetailsMichael Zawacki
Some trackout. Knife river on site running graders. Construction entrance has been grased out, will need to be rebuilt. Temporary storm water containment ponds near entrance have been removed.
No runoff or mud in neighbors yard after rain event.
General Inspection6/11/20186/11/20186/11/2018PPASS
DetailsMichael Zawacki
Light weekend rain had no effect on site. Track utilities on site working on gas lines. Knife River on site working on water mains.
Random Inspection5/31/20185/31/20185/31/2018PPART
DetailsMichael Zawacki
Post Rain Inspection.
No runoff from site.'
Water is going around rip rap channel leading into upper western retention pond. Severe rilling coming from top north lot leading into retention pond.
General Inspection5/29/20185/29/20185/29/2018PPASS
DetailsMichael Zawacki
post rainfall
No runoff down road or signs of sediment in neighbors driveway. Looks like all water was caught and retained on site.
General Inspection5/17/20185/17/20185/18/2018PCANC
DetailsAndy J. Long
Random Inspection5/17/20185/17/20185/17/2018PPASS
DetailsMichael Zawacki
Post rain inpsection.
No runoff from site. No issues on site.
Random Inspection5/16/20185/16/20185/16/2018PPASS
DetailsMichael Zawacki
Post rain inspection. Site is free from runoff or erosion issues. Knife River currently on site doing sewer/water work.
Random Inspection5/14/20185/14/20185/14/2018PPASS
DetailsMichael Zawacki
Post rain inspection.
Site is dry, none of the onsite retention has water, no ESC issues. Winsome looks like it has been swept.
Random Inspection5/7/20185/7/20185/7/2018PPASS
DetailsMichael Zawacki
Wattle has been brought in and placed on some hillsides and lower perimeter. Rock channels have been constructed along flow lines running into retention ponds. Road constructed along nort west perimeter on upper end of project. New water pipe has been welded and is on site, horizontal drilling hasn't begun.
Random Inspection4/24/20184/24/20184/24/2018PPASS
DetailsMichael Zawacki
Knife River on site prepping water line. Horizontal drill rig isn't on site.Well rig is on top lot. Left new permit sign, load of wattle is on order for site.
Random Inspection4/17/20184/17/20184/17/2018PPASS
DetailsMichael Zawacki
BMPs all repaired and improved. RPC is off site.
General Inspection4/9/20184/11/20184/11/2018APASS
DetailsMichael Zawacki
Check BMP repairs.
Cleaning out areas that were full of sediment. RPC is working on wall at top, when they finish new check dams will be built on road. Area on lower lot that blew out has been repaired. DI on bottom of hill has been replaced, still dirt in gutters going down hill.
General Inspection4/9/20184/9/20184/9/2018PCANC
DetailsMichael Zawacki
Check BMP repairs.
General Inspection4/9/20184/9/20184/9/2018APART
DetailsMichael Zawacki
post rainfall inspection
Retention ponds received water as changed after last storm. Check dams on dam caught sediment and slowed down runoff. Checkdams will be designed to go across road during repairs. All check and diversion dams will be cleaned and rebuilt. Berms on upper lots kept rain water in place, one failed where rock wall was recently installed, rills will be fixed and berm repaired. Retaing wall above 3401 will get sand or gravel bags to act as dam until grass can be grown to act as an overflow preventative. New retention pond on old road held up and contained lots of water. Some mud around entrance from storm water overflowing on top of rock entrance. Mud and debris on bottom of road at intersection with bogus. Gutter needs to cleaned and witched hats replaced. Blocksome may be used. Will return on 4-11 to check status of repairs.
General Inspection4/4/20184/4/20184/4/2018PPEND
DetailsAndy J. Long
Site walk through inspection conducted Monday 4/2 11:15 AM

Crews have completed earth work and check dam installation onsite to reduce amount of water and runoff velocity that will reach the temporary retaining pond at bottom of site.

Heavy duty construction entrance installed.

Rock Placing Company installing retaining walls between terraced parcels.

Correction request:

- plan for hydroseeding to limit fugitve dust
- finish clean up around Winsome and BB Road storm drains.

General Inspection3/28/20183/28/20183/29/2018PPASS
DetailsMichael Zawacki
follow up inspeciton
WIP on site improvements. Upper pond can now receive runoff from upper road. Rills are being removed, bottoms of lots now have berms to contain and control runoff. Truck loads of rock delivered for check dams. RPC on site for rock work. Road bed area has been cleaned, sediment removed and rilling repaired. Lower sediment pond is still full of muck and is to wet to clean out.
Conference3/28/20183/28/20183/28/2018PDONE
DetailsAndy J. Long
Neighbor at 3317 Winsome below the subdivsion notified ESC Inspectors he would hold the City liable if his basement is flooded due to runoff from this site.

Follow up ESC inspection schedule to make sure RSCI is continuing work on site to increase retention of water on site, slow down runoff velocity, and allow settling to discharge clean water to gutter and not neighboring properties.
Conference3/27/20183/27/20183/27/2018PPEND
DetailsAndy J. Long
On site compliance conference and site walk through with RSCI project RP John.
Clean up efforts and earthwork for new erosion and sediment controls in progress.

Corrections discussed with project RP:

- continue to work with neighbor on clean up of mud and repair of front yard affected by silt and drying of crawl space.
- reshaping and removal of dirt above retaining wall is in progress. A interception diversion trench will direct water to the temporary holding pond.
- bottom temporary holding pond containment berm is being lined with geotextile and increased in height
- change out DI bags installed @ Winsome and Bogus Basin. Clean up around drains.
- install larger rock check dams on the road to slow down runoff. Must runoff water causing issues is from the roadway.
- dig trench to upper pond to reduce amount of water going to lower temporary pond


- a meeting is to be scheduled April 2-6 with Public Works Hillside & Drainage and neighbors to discuss the permanent drainage plan and controls to prevent further flooding.

Complaint Inspection3/23/20183/23/20183/23/2018PPEND
DetailsMichael Zawacki
Complaint received describing muddy offsite discharge to home and to gutter.

Met with homeowner. Developer has already sent crews to clean up mess. New retaining wall is causing draining into his driveway and yard. They have pictures and videos that will be sent to me. Spoke with PW Hillside Engineer Melissa and she is going to look at wall plans.
There is some dirt in gutters down to Bogus Basin Rd. that will need to be cleaned/swept. Follow up onsite conference to be conducted 3/27
General Inspection2/26/20182/26/20182/26/2018PPEND
DetailsAndy J. Long
Rock entrance has been widened and improved. Road was swept. Sediment filter bags installed at Bogus Basin Road are helping settle and trap sediment. Will need to be inspected for maintenance after draining.
No muddy runoff leaving site to Winsome gutters. Snow still melting on much of the area of disturbance..
Complaint Inspection2/9/20182/9/20182/9/2018PPEND
DetailsAndy J. Long
tony - 208.342.7387

RSCI to have crew work on cleaning gutters below project today & Monday. Will have another street sweeper.

Need to widen and improve construction entrance to allow turn around for emergency vehicles. Boise Fire to also issue request to developer.
Tracking Control2/8/20182/8/20182/8/2018PFAIL
DetailsAndy J. Long
Site needs to sweep Winsome at entrance to remove the sand and dirt that is now dry. Lots of dirt in the gutters in front of neighbors.

Verbal correction to have it swept by Friday PM.
General Inspection1/31/20181/31/20181/31/2018PPART
DetailsMichael Zawacki
Exposed area has been tracked, few retention ponds have been built. Site is currently inactive. Some trackout at entrance.
General Inspection1/19/20181/19/20181/19/2018PPEND
DetailsMichael Zawacki
Street needs to be swept. Rock pad needs more rock at entrance.
No sediment buildup in DIs or behind sand bags.
Tracking Control1/9/20181/10/20181/10/2018APART
DetailsAndy J. Long
Inlet protection has been installed on DIs on Winsome @ Bogus, as well as some sandbag check dams in gutter just above inlets.

Corrections remaining:
- sweep Winsome at entrance to site
- install more construction entrance trackout pad rock.
- block vehicle access to the stormwater retention area just beyond the construction entrance
- set schedule for installing wattles per ESC plan now that mass grading is complete
Tracking Control1/9/20181/9/20181/9/2018PPEND
DetailsAndy J. Long
RP called back stating that crews have started clean up of street and gathering BMPs for installation.
BMP Violation1/9/20181/9/20181/9/2018AFAIL
DetailsAndy J. Long
Turbid discharge occuring after precipitation. Source of muddy water is from rinsing is from trackout on Winsome at site entrance. Site appears to be retaining runoff.

Trackout observed 12/18 does not appear to have been swept. Significant violation, immediate corrections required.

Corrections:
- sweep up street and scrape mud stuck on road at entrance
- install gutter check dams within 50 m of entrance.
- inlet protection should be installed on the two basin drains on Winsome @ Bogus. Clean up any remaining mud around inlets.
Tracking Control12/18/201712/18/201712/18/2017PPEND
DetailsAndy J. Long
WIP on earth work/mass grading of parcels in Win Hollow. Should be complete this week. Rock entrance has been pushed into mud or removed, only short strip of heavy duty rock remains. Some trackout and mud in street on exit lane from subdivions

Street sweeper should be scheduled. Will check on conditions at end of day tomorrow.
Random Inspection12/13/201712/13/201712/13/2017PFAIL
DetailsMichael Zawacki
Grading in progress. Lots of trackout leaving site.
Random Inspection12/6/201712/6/201712/6/2017PPASS
DetailsMichael Zawacki
Massive grading underway. Water truck on site. Ground has moisture and freezing over night. No dust visible. Some trackout on first 50' of road.
Random Inspection11/21/201711/21/201711/22/2017PPASS
DetailsAndy J. Long
Temporary onsite stormwater retention basins have beeen constructed as requested. Rock entrance is still in good condition. Some minor trackout the first 10-20 yds down Winsome. Will need sweeping this week or early next week.
Random Inspection11/16/201711/16/201711/16/2017PPASS
DetailsMichael Zawacki
Added berm and retention pond like discussed. Both are working.
Conference11/8/201711/13/201711/13/2017PDONE
DetailsAndy J. Long
2:00 PM w/ Zeke


Onsite conference to discuss project schedule and BMPs to contain stormwater onsite.

Developer will build a temporary berm and stormwater retention area for the upper right (north) to contrain runoff from the disturbed area leading up to the premier view lot/terrace area. The south basin will have runoff directed to to a low lying vegetated area. The lower section drainage area will flow to a depression just inside of construction entrance. Will zone off this area with construction fencing to prevent vehicles driving through the mud.

Next 2 weeks will be building retaining walls. Late November and early December the mass grading will be completed. After mass grading site will need to be re-assessed for BMPs and slope stabilization BMPs.
Tracking Control11/8/201711/8/201711/9/2017APASS
DetailsAndy J. Long
check for entrance and clean up

Road sweeping and new rock construction entrance. Rock is angular and a geotextile lining is provided. Permit sign posted.

Conference scheduled for Monday 2 PM to discuss temporary winter stablization and installation of onsite sediment basins.
General Inspection11/6/201711/6/201711/6/2017PFAIL
DetailsMichael Zawacki
Construction entrance destroyed and never repaired. Utility trench never patched. Mud and trackout leaving site and going down the road.
General Inspection10/27/201710/27/201710/27/2017PPEND
DetailsMichael Zawacki
Utility sewer/water installation and trenching in progress. Construction entrance destroyed, looks like work in area done. Mud, water and sludge accumulating at transition to pavement, some on road. Water truck currently spraying, no dust. Will need to monitor entrance and track out.
Conference10/16/201710/16/201710/16/2017PPEND
DetailsAndy J. Long
Construction entrance installed last week. Further earthwork to resume as well as utilities.

Notified RP of stabilization requirements.
General Inspection10/2/201710/3/201710/4/2017PPEND
DetailsAndy J. Long
First phase of grading is complete. Next step will be utility installation. No erosion controls or stabilization measure have been implement, no trackout pad installed at this time (due to upcoming utility installation). Some minor trackout.

Need to meet onsite to discuss disturbed hillside erosion controls and to prohibit access for joyriders and non-essential traffic that is causing trackout.
General Inspection9/28/20179/29/201710/2/2017ACANC
DetailsAndy J. Long
Conference9/22/20179/25/20179/28/2017APEND
DetailsAndy J. Long
call Zeke to set up meeting

2 water trucks now reportedly onsite. Complaint received 9/25 was addressed. Meeting not yet scheduled but RP is on notice. Follow up inspection 9/29
General Inspection9/19/20179/25/20179/26/2017ACANC
DetailsAndy J. Long
General Inspection9/22/20179/22/20179/22/2017PPASS
DetailsAndy J. Long
post rainfall inspection.

No activity. No discharges from site. Will address next phase corrections next week...
General Inspection9/19/20179/19/20179/22/2017PPEND
DetailsAndy J. Long
Inspection on 9/19 , no significant work occuring. Crew building retaining wall at top of Hollow not onsite. Need to have onsite conference with RP about improved construction entrance, more silt fence at bottom of site, and temporary stormwater retention and settling basins onsite.
General Inspection8/14/20178/23/20178/25/2017APASS
DetailsAndy J. Long
No issues, no significant activity or grading has occured yet.
Site Preparation8/9/20178/11/20178/14/2017APASS
DetailsAndy J. Long
Zeke Phone #: ###-####

Preconstruction site meeting completed. SWPPP on site, permit posted, construction entrance installed. Work will begin on rock retaining walls prior to grading operations. Reviewed phasing, leaving a vegetative buffer and requested that once grading is stared, onsite retention/sediment basins should be provided.