Permit Information
Permit NumberESC15-00853
StatusIssued
Name RON BECKMAN
Site Address 2350 W HILL RD
Project NameNorth Hill Subdivision
Customer Number 
ePlanReviewNo
Description
Retaining walls and site grading 18,000 cubic yards for new subdiviaion (GRD15-00055 & BLD15-02278)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/11/20208/11/20208/12/2020 PASS
DetailsMichael Zawacki
WIP on final units. May have sinkhole forming in road. They are going to camera it.
General Inspection7/27/20207/27/20207/28/2020 PASS
DetailsMichael Zawacki
Last two units framed. Very little disturbed area remaining.
General Inspection7/10/20207/10/20207/10/2020 PASS
DetailsMichael Zawacki
WIP on last units
General Inspection6/25/20206/25/20206/25/2020 PASS
DetailsMichael Zawacki
WIP on exterior framing of last unit. No more bare ground at site. Trash is kept contained, dumpster at site. At some point something was leaking fluid.
General Inspection6/10/20206/10/20206/10/2020 PASS
DetailsMichael Zawacki
Work has begun on framing last building. Onsite dumpster is full. Area is clean.
General Inspection5/26/20205/26/20205/26/2020 PASS
DetailsMichael Zawacki
WIP on one building. Dumpster on site, some trash around site.
Second building has foundation completed, no vertical work.
General Inspection5/11/20205/11/20205/13/2020 CANC
DetailsAndy J. Long
BMP Violation4/21/20204/24/20204/24/2020APASS
DetailsMichael Zawacki
Trash has been cleaned. Leasing company responsible for lift
General Inspection4/21/20204/21/20204/21/2020 FAIL
DetailsMichael Zawacki
Met with foreman on site.
Trash starting to accumulate, piles on grass between site and sidewalk, lots of small trash on ground.
Hydralic leak on lift, repair is scheduled with leasing company, oil will need to be cleaned up.
Follow up scheduled.
General Inspection4/6/20204/6/20204/6/2020 PASS
DetailsAndy J. Long
No trackout or discharges from sub. WIP on west end foundations
General Inspection3/20/20203/20/20203/24/2020 PART
DetailsAndy J. Long
No trackout to Hill Road.

Correction request to sweep the west end of Hill Terrace and do maintenance on storm drain sediment bag.

Check next inspection, notified RP Ron
General Inspection3/5/20203/5/20203/5/2020 PART
DetailsMichael Zawacki
Site is contained, nothing making it to hill road.
Washout was removed for new foundations, forms being placed, will need new washout before pour.
Lots of dirt within site, trash needs to be picked up, mostly empty bottles, cans, wrappers, etc.
General Inspection2/19/20202/19/20202/19/2020 PASS
DetailsMichael Zawacki
WIP on units on western end of phase. Hauling out some backfill, apron is clean, no tracking onto hill.
Tracking Control1/31/20202/4/20202/4/2020PPASS
DetailsMichael Zawacki
No trackout, area dry today.
Tracking Control1/30/20201/31/20201/31/2020APEND
DetailsAndy J. Long
No new trackout, no discharges. HIll Terrace on the west end needs to be swept. Follow up scheduled
General Inspection1/28/20201/28/20201/30/2020 FAIL
DetailsMichael Zawacki
WiP on one duplex. Lots of mud on road, some tracking to hill. Picture sent to Ron. Follow up scheduled.
General Inspection1/13/20201/13/20201/13/2020 PASS
DetailsMichael Zawacki
Western most buildings have begun. Has washout, no tracking to hill
General Inspection12/27/201912/27/201912/30/2019 CANC
DetailsMichael Zawacki
General Inspection12/12/201912/12/201912/12/2019 PART
DetailsMichael Zawacki
Lots of dirt on street within project, no tracking to Hill.
General Inspection11/27/201911/27/201911/27/2019 FAIL
DetailsMichael Zawacki
Concrete washout is not lined. Lots of dirt on road.
Message sent to RP.
General Inspection11/12/201911/12/201911/12/2019 PART
DetailsMichael Zawacki
Started excavation for new units, backfill is on road. Needs to be removed.
General Inspection10/28/201910/28/201910/28/2019 PASS
DetailsMichael Zawacki
Dirtwork on western edge has begun, backfill still on site. Dumpster at site, pretty full, will need to watch for trash blowing away.
General Inspection10/11/201910/11/201910/11/2019 PASS
DetailsAndy J. Long
General Inspection9/23/20199/26/20199/26/2019APASS
DetailsMichael Zawacki
ROad has been swept.
General Inspection9/23/20199/23/20199/23/2019 PART
DetailsMichael Zawacki
Lots of dirt and rocks on lower end, no trackout to hill.
Message sent to Ron, follow up scheduled.
General Inspection9/6/20199/6/20199/6/2019 PASS
DetailsMichael Zawacki
No muddy runoff, road clean. Large dumpster on site, trash cleaned up. Onsite materials relocated to west end, looks like they are getting ready for next phase of townhomes.
General Inspection8/22/20198/22/20198/22/2019 PASS
DetailsMichael Zawacki
No work on lower section. Lined concrete washout installed. Some dirt on interior road, no trackout.
General Inspection8/7/20198/7/20198/7/2019 DONE
DetailsMichael Zawacki
entry error
General Inspection7/23/20197/23/20197/23/2019 PASS
DetailsMichael Zawacki
WIP on one unit.
Site is clean, materials being stored om bottom lots, no dirt on road
General Inspection7/8/20197/8/20197/8/2019 PASS
DetailsMichael Zawacki
WIP on framing one unit, area contained.
Bottom of project is being used for staging and storage. No trackout or ESC issues.
General Inspection6/21/20196/21/20196/21/2019 PASS
DetailsAndy J. Long
No discharges or track-out. No corrections requested at this time.
General Inspection6/6/20196/6/20196/6/2019 PASS
DetailsMichael Zawacki
Prepping for final build faze. Moving some materials around site. Some dirt on inner road, none making it onto Hill.
General Inspection5/22/20195/22/20195/22/2019 PEND
DetailsMichael Zawacki
Lots of trackout inside of site. Concrete washout has been flooded. Workers setting forms for next foundation.
General Inspection5/7/20195/7/20195/7/2019 PASS
DetailsAndy J. Long
General Inspection4/22/20194/22/20194/22/2019 PASS
DetailsMichael Zawacki
Backfill has been removed from lot between completed duplexes. No ESC issues.
General Inspection4/5/20194/5/20194/8/2019 PASS
DetailsAndy J. Long
General Inspection3/21/20193/21/20193/21/2019 PASS
DetailsMichael Zawacki
Landscaping not completed, common drive not finished, still go through dirt to make it to home.
General Inspection3/6/20193/6/20193/6/2019 PASS
DetailsMichael Zawacki
General Inspection2/19/20192/19/20192/26/2019 PASS
DetailsMichael Zawacki
All work interior, new phases haven't begun
General Inspection2/4/20192/4/20192/4/2019 PASS
DetailsMichael Zawacki
No work on new units, all current work inside.
General Inspection1/18/20191/18/20191/18/2019 PASS
DetailsMichael Zawacki
Some mud from unloading and lift running in mud. Met with Ron and he will get it cleaned.
General Inspection1/3/20191/3/20191/3/2019 PASS
DetailsAndy J. Long
General Inspection12/19/201812/19/201812/19/2018 PASS
DetailsMichael Zawacki
No excavation activity, road is clean.
General Inspection12/4/201812/4/201812/4/2018 PASS
DetailsMichael Zawacki
One worker on site cleaning, no earthwork activity.
General Inspection11/19/201811/19/201811/19/2018 PASS
DetailsAndy J. Long
General Inspection11/2/201811/2/201811/2/2018 PASS
DetailsAndy J. Long
WIP on 4 units at North HIll Townhomes/Hill Terrace. Storm drains have sediment protection, trash contained, crew onsite sweeping up some trackout onto Hill Terrace.

Review washout requirements with onsite crew man and RP Ron, Site is currently in good condition.
General Inspection10/18/201810/18/201810/18/2018 PART
DetailsMichael Zawacki
Area in front of current construction needs to be swept.
General Inspection10/3/201810/3/201810/3/2018 PASS
DetailsMichael Zawacki
One lot with some excavation. No dirt leaving lot. New washout will be needed before next foundation.
General Inspection9/18/20189/18/20189/19/2018 PASS
DetailsMichael Zawacki
Currently no dirt work, only work on town homes. Nothing leaving site.
General Inspection9/3/20189/3/20189/4/2018 PASS
DetailsMichael Zawacki
Load of dirt was dumped on road, skid steer currently bringing it to back yards, area will need to be swept. New washout needed before foundations on next units poured.
General Inspection8/17/20188/17/20188/17/2018 PASS
DetailsMichael Zawacki
All contained to site, no issues.
General Inspection8/2/20188/2/20188/2/2018 PASS
DetailsMichael Zawacki
Site is contained, nothing leaving. No ESC issues.
General Inspection7/18/20187/18/20187/18/2018 PASS
DetailsMichael Zawacki
WIP. No dirt leaving site. Trash is contained.
General Inspection7/3/20187/3/20187/3/2018 PASS
DetailsMichael Zawacki
Inspected 7-2
General Inspection6/18/20186/18/20186/19/2018 PASS
DetailsMichael Zawacki
WIP on foundations. Site is contained, no runoff to Hill Rd.
General Inspection6/1/20186/1/20186/1/2018 PASS
DetailsMichael Zawacki
Dumpster on site, area free of trash. No dirt leaving site. Work on foundation for new building and interior on other units.
General Inspection5/17/20185/17/20185/21/2018 PART
DetailsAndy J. Long
Corrections needed:

- backfill should not be stored on the road with out perimeter controls
- need to clearly label concrete washout and secure lining. Leakage is visible.

- empty out DI bag on the east side of entrance.

Verbal correction to RP-developer Ron
General Inspection5/2/20185/2/20185/2/2018 PART
DetailsMichael Zawacki
WIP.
IMC on site, washed out onto ground even though a washout box is down the hill.
Upper witches hats starting to fill up.
General Inspection4/17/20184/17/20184/17/2018 PASS
DetailsMichael Zawacki
WIP on framing on one unit, pouring foundation on another. No dirt leaving site, everything contained.
General Inspection4/2/20184/2/20184/2/2018 PASS
DetailsMichael Zawacki
WIP on new foundation. Stockpile is all on site. No dirt leaving site. Interior roads gets dirty, usually cleaned on Fridays.
General Inspection3/16/20183/16/20183/16/2018 PEND
DetailsMichael Zawacki
Dasco on site. Lots of dirt and mus on road inside area.
General Inspection3/1/20183/1/20183/1/2018 PASS
DetailsMichael Zawacki
Excavation for new unit complete. Pour is planned for Tuesday. Some trackout on interior drive, they said they plan on cleaning it before they leave tomorrow.
General Inspection2/14/20182/14/20182/15/2018 PASS
DetailsMichael Zawacki
Some dirt on road by where workers are parking. DIs clean and nothing leaving site. Scheduled to start excavation fornext buildings within a week.
General Inspection1/30/20181/30/20181/30/2018 PART
DetailsMichael Zawacki
Wattle needs to be replaced. Some runoff onto road. DIs are installed and clean. Dumpster on site and contractors are using it.
General Inspection1/15/20181/15/20181/16/2018 PART
DetailsMichael Zawacki
Raining during inspection. Wattle has been run over to many times and needs to be replaced. Sediment is running off lots and onto road. Some trackout on west side of property.
General Inspection12/29/201712/29/20171/2/2018 PASS
DetailsMichael Zawacki
Most of site is frozen and has snow cover. Unable to tell if old issues have been fixed. Road has some track out.
General Inspection12/14/201712/14/201712/14/2017 FAIL
DetailsMichael Zawacki
Trackout from 11/29 never cleaned up. Washout into empty lot and ran onto Hill Terrace. Wattle has been ran over multiple times and needs to be replaced. Trackout from vacant lot next to current construction.
General Inspection11/29/201711/29/201711/30/2017APASS
DetailsMichael Zawacki
Talked to Ron on site. Garbage truck backed into vacant lot and caused trackout. Will get Curtis out to clean. DIs are filling with leaves, landscapers are cleaning them when they come out.
General Inspection11/9/201711/17/201711/22/2017PPEND
DetailsAndy J. Long
follow up to corrections issued 11/9
General Inspection11/9/201711/9/201711/9/2017 FAIL
DetailsAndy J. Long
WIP on two units. DI bags in good condition. No trackout or discharges from site.

Corrections:
- pick up loose trash
- block off access to bare lots not in use.
- clean up dried uncontained concrete washout

Corrections should be completed by end of next week. Verbal correction to GC Ron.
General Inspection10/25/201710/25/201710/26/2017 PASS
DetailsMichael Zawacki
WIP. Workers moving framing material. Site is generally clean, few of the townhomes are now occupied.
General Inspection10/10/201710/10/201710/10/2017 PASS
DetailsMichael Zawacki
Needs house keeping. Wattles are worn, DI bags need to be removed, emptied, and reinstalled. Some trackout but none is leaving site. Floor coting and roof material buckets were stored next to storm drain. Some loose trash. Site is self contained.
General Inspection9/25/20179/25/20179/26/2017 CANC
DetailsAndy J. Long
General Inspection9/8/20179/8/20179/8/2017 CANC
DetailsAndy J. Long
General Inspection8/22/20178/24/20178/24/2017AFAIL
DetailsAndy J. Long
No trackout, discharges offstie.

Correction request:

- provide lined designated concrete washout for the new foundation work occuring.
General Inspection8/21/20178/21/20178/22/2017 CANC
DetailsAndy J. Long
General Inspection8/4/20178/4/20178/4/2017 PASS
DetailsAndy J. Long
General Inspection7/20/20177/20/20177/20/2017 PASS
DetailsAndy J. Long
WIP on townhomes at entrance. 4 units at east end are complete. BMPs installed (trash containment, inlet protection, perimeter wattles). No trackout or discharges to Hill road.
Site Preparation6/30/20177/5/20177/5/2017PCANC
DetailsAndy J. Long
General Inspection6/30/20176/30/20176/30/2017PPART
DetailsAndy J. Long
WIP on townhomes. No trackout or discharges leaving subdivision to Hill Road. Private storm drains on Hill Terrace has sediment protection.

Trash at each duplex is contained.

Corrections needed:
- stake in wattles so they are secure
- clean gutters in front of DI bags
- need to provide a designated washout facility or pit for upcoming projects.

No immediate corrections, will follow up next week.
General Inspection6/15/20176/16/20176/16/2017APART
DetailsMelissa Jannusch
Dumpster is one site. Wattles are one site. DI bags are clean. Gutters are clean. Trackout still on interior road. Trackout onto Hill road.
Correction: clean trackout on interior and exterior road
RP has sweeper scheduled for Monday.
Conference6/8/20176/9/20176/9/2017APASS
DetailsMelissa Jannusch
9:30 Conference. Met GC Ron on site to discuss corrections. Follow ups for correction compliance scheduled for 6/15/2017
General Inspection6/8/20176/8/20176/8/2017 FAIL
DetailsMelissa Jannusch
Significant trackout and sediment build up on interior street. Wattle or other BMPs will need to be installed along entire disturbed area and street interface.

Corrections:
1) Sweep street while containing dust.
2) Add a wattle along interface of disturbed area and street.
3) Clean gutter along curb
4) Maintenance DI bags
5) Pick up trash at site

Conference with GC scheduled for 6/9/2017 at 9:30AM. Follow up scheduled for next Thursday. Corrections need to be addressed to avoid escalated enforcement.

General Inspection5/24/20175/24/20175/24/2017 PASS
DetailsAndy J. Long
Trash contained. No trackout to Hill Road. No corrections requested. Hill Terrace within subdivision does need regular sweeeping
General Inspection5/9/20175/9/20175/9/2017 PASS
DetailsAndy J. Long
No trackout or discharges within subdivsion on Hill Terrace nor to Hill Road.. Trash containment in good condition. No new corrections.
General Inspection4/21/20174/24/20175/1/2017PPEND
DetailsAndy J. Long
check for sweeping and clean up

Stockpile to be removed at end of week .

Check for rules sign, provide SWPPP sign

Signs were blown down and stockpile is still onsite. No trackout or discharges to Hill Road and all trash is contained. No new corrections.
General Inspection4/21/20174/21/20174/21/2017APART
DetailsAndy J. Long
follow up inspection

Trash containers provided. New inlet protection installed.

Corrections needed:
- sweepng, move or protect stockpile
General Inspection4/17/20174/18/20174/18/2017PPEND
DetailsAndy J. Long
Uncontained trash piles have been hauled to dump, Hill Terrace was swept with vacuum sweeper.

Corrections in progress:
- finish installing trash containers, 1 per building
- DI bag maintenance on Hill Terrace drains - Posting site rules and SWPPP sign

Compliance deadline extended to 4/19 PM
Discussed details with developer Ron.
Site Preparation4/14/20174/17/20174/17/2017ACANC
DetailsAndy J. Long
data entry error, disregard. Follow up inspection scheduled 4/18 PM for pending Corrective Actions
General Inspection4/7/20174/12/20174/14/2017ACANC
DetailsAndy J. Long
General Inspection4/4/20174/6/20174/7/2017PFAIL
DetailsAndy J. Long
Some sweeping was completed, but site is not in compliance.

Onsite meeting with RP-GC Ron:
Corrections requested:
- continue sweep of loose dirt on Hill Terrace and main entrance to Hill Road.
- collect all loose trash and provide trash containers for each town home
- clean out DI bags within subdivsion.

Ron stated sweeping is occuring this weeked, will use skidster to pull out full DI bags. Stated he has ordered improved trash containers.

Will re-inspect Wednesday 4/12
General Inspection4/3/20174/4/20174/4/2017AFAIL
DetailsAndy J. Long
Need to conduct maintenance on sediment filter bags on Hill Terrace. Sweep up North Hill sub entrance aprons. RP stated excess sediment on Hill Terrace due to recently replaced gas line. Crews in process of sweeping and removing loose dirt.

Developer stated excess soil stockpiles from site are to be hauled off next week. Will check back later in weekn
General Inspection3/30/20173/30/20173/31/2017 PASS
DetailsMelissa Jannusch
Sign posted. No trackout to hill rd. project ok.
General Inspection3/15/20173/15/20173/16/2017 PASS
DetailsMelissa Jannusch
Trackout okay.
General Inspection2/28/20172/28/20172/28/2017 FAIL
DetailsMelissa Jannusch
Corrections requested: DI bag maintenance, clean sediment out of gutter. Left message for RP requesting corrections.
Tracking Control2/10/20172/13/20172/13/2017PPASS
DetailsMelissa Jannusch
check that messy access drive has been swept.

if not.
Has been cleaned.
General Inspection2/9/20172/9/20172/9/2017 PASS
DetailsAndy J. Long
No trackout or discharges to Hill Road observed. No corrections at this time.
General Inspection12/26/201612/26/201612/30/2016 CANC
DetailsAndy J. Long
General Inspection12/9/201612/9/201612/12/2016 PEND
DetailsAndy J. Long
Individual permits for townhome 4-plexes & duplexes have been issued. Onsite walk-through inspection for Site Preparation requirements. No trackout to Hill Road, no muddy discharges from site observed

Onsite storm water system is installed, drop inlets on Hill Terrace have sediment bags installed and are in good condition. Workers parking on the pavement to prevent trackout.

Corrections in progress:
- sweeping 12/13
- install sediment trench along edge of pavement and between lots to capture dirt and water . This is alternate for wattles at at this time.
- provide trash containment bin(s) now that framing has started.
- make plan to have frequent sweeping and clean up along Hill Terrace.

Note: 8 site preps entered for the active units that are now permitted.

Developer to have landscape crew sweep subdivision apron, bike lane and sidewalk in front of site to do clean up after last week's landscaping.
General Inspection11/24/201611/24/201611/25/2016 CANC
DetailsAndy J. Long
General Inspection11/9/201611/9/201611/9/2016 PASS
DetailsAndy J. Long
Road was swept and DI bags installed. Awaiting new permits to be issued for further corrections to be acccomplished. No discharges or trackout.
Conference10/25/201610/25/201610/25/2016ADONE
DetailsAndy J. Long
Onsite meeting and walk-through with project developer (RP out of town)

Corrections:
- provide inlet protection on subdivision stormwater system
- sweep up remaining track and loose dirt on north side of access road
- address spill with absorbent on the east end of road

Developer will begin corrections today, compliance extended to Friday AM. Note: first 4-plex work/excavation is tentatively scheduled for next week.

BMP Violation10/25/201610/25/201610/25/2016AFAIL
DetailsAndy J. Long
No response from RP or Developer

Trackout was not swept, no DI bags on the new storm drains. No construction entrance or perimeter control.

Correction Notice via phone and email. Next escalation will be SWO.
General Inspection10/19/201610/19/201610/20/2016 FAIL
DetailsAndy J. Long
No BMPs installed currently. Some track out from site has occured. Corrections needed.

Verbal correction for conference with RP Angela and developer Ron ###-#### called to have on site meeting to address correctons and BMPs for SFH construction.
General Inspection10/4/201610/4/201610/6/2016 CANC
DetailsAndy J. Long
General Inspection9/16/20169/19/20169/19/2016PPART
DetailsAndy J. Long
Need to install sediment protection on the newly installed storm drains within North Hill sub access road.

Correction request:
- sweep up gutter on HIll between MS4 inlet and install sediment filter fabric over inlet.

Verbal request to RP Angie and Extreme Excavation.
General Inspection9/15/20169/16/20169/16/2016ACANC
DetailsAndy J. Long
rescheduled 9/18
General Inspection9/15/20169/15/20169/15/2016 CANC
DetailsAndy J. Long
General Inspection8/31/20168/31/20168/31/2016 PASS
DetailsEvan Jenkins
work in progress on paving prep, and also new sidewalk along Hill Rd. no ESC issues observed at time of insection
General Inspection8/16/20168/16/20168/16/2016 PASS
DetailsEvan Jenkins
Majority of curb has been poured and being prepped for paving internal road. Retaining wall is complete. Very minimal dust. WIll inspect site again this afternoon when temperatures rise to check on dust control
General Inspection8/1/20168/1/20168/1/2016 PASS
DetailsAndy J. Long
No activity at time of inspection. Site has been prepped for access road paving.

DI on Hill has sandbags and wattles. No filter bag because has small trough inlets.
General Inspection7/15/20167/15/20167/18/2016 PASS
DetailsEvan Jenkins
No issues observed. Work in Progress
General Inspection6/30/20166/30/20166/30/2016 PASS
DetailsEvan Jenkins
Retaining wall installed. Fully graded. No Activity occuring at time of inspection.
No ESC issues observed
General Inspection6/15/20166/15/20166/15/2016 PART
DetailsAndy J. Long
WIP on installing subsurface stormwater infrastructure. Site is clean with trash/debris consolidated for removal, no trackout, and no non-stormwater discharges.


Corrections needed:
- need to re-organize inspection reports in chronological order and make sure frequency matches that pre-scribed in the SWPPP.
General Inspection5/31/20165/31/20165/31/2016 PASS
DetailsAndy J. Long
WIP on grading/compaction above the recently installed rock retaining wall (lower section). Minor trackout to Hill Road will need to be swept at end of day.

BMPs installed at site, SWPPP inspections conducted weekly, binder located in office.. No fugitive dust or discharges leaving site. No complaints received by ESC division through duration of project.
General Inspection5/16/20165/16/20165/16/2016 PASS
DetailsEvan Jenkins
Work Continues: no ESC issues observed at this time
Random Inspection4/29/20164/29/20164/29/2016PPASS
DetailsAndy J. Long
WIP on retaining wall. RP on site, no trackout, no discharges. No corrections requested at this time.
General Inspection4/20/20164/20/20164/20/2016 PASS
DetailsEvan Jenkins
Retaining wall being constructed. No discharged leaving site
Complaint Inspection4/4/20164/4/20164/4/2016PPASS
DetailsEvan Jenkins
Tracking and dirt everywhere

Andy inspected site earlier in the morning. Corrections have been made.
Random Inspection4/4/20164/4/20164/4/2016APASS
DetailsAndy J. Long
WIP on removing soil from site to make room for the front retaining wall. The first wall at back of site is complete. Stockpile and trackout management has been in compliance with no violations observed or reported.

Permit sign posted in window with SWPPP available. Sweeping unit attachment stored on site for clean up activities.

Requested that construction trackout pad be refreshed and to consider perimeter control around the stockpile of sandy clay if it is to remain in current position.
General Inspection3/31/20163/31/20163/31/2016 PASS
DetailsAndy J. Long
WIP. No trackout or discharges. BMPs are installed, permit sign posted. Very clean site with good stockpile management.

No corrections at this time.
General Inspection3/16/20163/16/20163/16/2016 PASS
DetailsAndy J. Long
Retaining wall work and dirt removal/off haul in progress at North Hill sub. Existing pavement/asphalt has been preserved and a rock construction entrance/loading pad has been installed within site. No trackout or polluted runoff observed flowing from site to Hill Road. MS4 on Hill has sediment bags and gravel bag check dams.

Stockpile area at east end of site is contained by straw wattle weighed down by sandbag to trap any loose dirt that makes it to the pavement. No issues observed.

Approved, site is in ESC compliance.
General Inspection2/22/20162/22/20162/22/2016 PASS
DetailsAndy J. Long
WIP on retaining wall for townhome subdivision. Construction entrance installed within site at border of existing concrete and loading area. Wattles weighed secured around stockpile area at east end of project. Permits posted inside old nursery building window.

No trackout, no discharges, no other violations observed. Approved.
General Inspection2/5/20162/5/20162/5/2016 CANC
DetailsEvan Jenkins
Parcel Tag per Jason Taylor to pull a bond
Site Preparation1/4/20161/4/20161/4/2016PPASS
DetailsAndy J. Long
Site walk through for BMP installations for first phase 2 PM

Area of disturbance will be at back of property against the upper hill. Parking lot asphalt and stormwater drainage will remain unchanged. DI bag installed on the private drain in front of nursery building.

No inlet installed at the Hill Road MS4 due to icy conditions and multiple "mini-inlets" . Will observed conditions and install sandbag/gravel checkdam bags in gutter on both sides of the basin inlet.

Rock tracking pad will be installed within property on access road connecting the upper and lower terraces. Lower terrace to remain paved as long as possible. Rock is onsite and will be spread as soon as equipment is onsite.

Permit sign, EPA tracking # and site info will be posted inside the window of the nursery building.

Approved to start first phase of construction. Rock Placing Co. hopes to finish work before end of February and will be done simultaneously with excavation.
Site Preparation12/23/201512/24/201512/24/2015APASS
DetailsAndy J. Long
Ron Phone #: ###-#### or Angie ###-####

Pre-construction meeting with project developer, engineers, and operators. Reviewed ESC permit conditions and site specific BMPs.

BMP installation will occur next week and inspection shall be requested by Angie, the site SWPPP inspector.

ESC site map is approved and was available for review. First phase will be installation of rear retaining wall.
General Inspection1/25/20171/25/2017   
DetailsAndy J. Long
General Inspection1/10/20171/10/2017   
DetailsAndy J. Long