Information based on query as of Friday, May 3, 2024.
Permit Information
Permit NumberESC15-01579
StatusFinaled
Name JASON JONES
Site Address 2950 E PARKCENTER BLVD
Project NameArboretum at Barber Station
Customer Number 
ePlanReviewNo
Description
two apartment buildings, with clubhouse, parking and associated site improvements. (The Arboretum at Barber Statio) - Grading permit to pave existing dirt lot, work to include asphalt paving, landscaping, site lighting improvements, & storm water management per engineered plans approved by the Public Works Department. No buildings are to be constructed or installed under this permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/10/201810/10/201810/10/2018PPASS
DetailsAndy J. Long
Site is stabilzed, vegetated, and all temporary BMPs and construction materials have been removed as requested. ESC permit conditions satisfied.
Site Final10/1/201810/2/201810/2/2018ANR
DetailsAndy J. Long
Pile of wattles and silt fence from project left in bushes behind Barber lift station. Final request t remove issued to Brighton Corp.

General Inspection10/1/201810/1/201810/1/2018 CANC
DetailsAndy J. Long
General Inspection9/14/20189/14/20189/14/2018 CANC
DetailsAndy J. Long
General Inspection8/30/20188/30/20188/31/2018 PEND
DetailsAndy J. Long
awaiting final clean up and approval of revegetated area with Parks and Rec
General Inspection8/15/20188/15/20188/15/2018 NR
DetailsMichael Zawacki
Wattle and silt fence still in pile by greenbelt. Revegetation is coming in nicely.
General Inspection7/31/20187/31/20187/31/2018 PEND
DetailsAndy J. Long
Site Final7/11/20187/16/20187/16/2018PNR
DetailsAndy J. Long
Construction and landscaping on site complete. Open area between Greenbelt and Arboretum has been hydroseeded, but vegetation not yet established. Project monitored by Parks n Rec, Brighton/Eagle Landscaping.

No temporary ESC BMPs installed.

Corrections needed:
- remove discarded wattle behind Barber lift station & pump house
- remove SWPPP sign on sidewalk
Site Final7/6/20187/10/20187/11/2018APEND
DetailsAndy J. Long
General Inspection7/4/20187/4/20187/6/2018 CANC
DetailsAndy J. Long
rescheduled for site final inspection.
Site Final6/18/20186/19/20186/20/2018ANR
DetailsAndy J. Long
Corrections needed to get ESC final:

- remove wattles still staged/dumped on site.
- complete landscaping between building and Greenbelt and/or get Boise Parks and Rec sign off.

No Pentalon crew found on site. Parcel hold for C of O until corrections are addressed.
Site Final6/13/20186/14/20186/18/2018PCANC
DetailsAndy J. Long
General Inspection5/29/20185/30/20185/30/2018APASS
DetailsMichael Zawacki
Work nearly completed. Landscapers are now on the south side of project. Area between river and apartments is still all disturbed. Some trash still along greenbelt.
General Inspection5/24/20185/25/20185/29/2018ACANC
DetailsAndy J. Long
General Inspection5/21/20185/21/20185/24/2018 CANC
DetailsAndy J. Long
rescheduled
General Inspection5/2/20185/4/20185/8/2018APEND
DetailsAndy J. Long
perimter trash patrol

landscaping around perimeter in progress. No corrections requested at this time
General Inspection5/1/20185/1/20185/2/2018 PASS
DetailsAndy J. Long
Final landscaping and flood wall construction occuring. No corrections requested. Trash inspection scheduled for Friday.
General Inspection4/16/20184/16/20184/19/2018 PASS
DetailsMichael Zawacki
North side along greenbelt is now all landscaped. All materials have been removed from southern edge of property.
General Inspection3/30/20183/30/20183/30/2018PPART
DetailsAndy J. Long
Only some bits and peices of trash found around Greenbelt and Walling Creek. Stucco is now complete with scaffolding and plastic sheeting gone.

Perimeter sediment controls installed on unfinished landscaped areas.

Correction requests:
- pick up trash across street in employee parking area
- clean up stucco piles below building #3 and that staging area.
General Inspection3/19/20183/20/20183/20/2018APART
DetailsAndy J. Long
Corrections have been made at site to address trash and material containment issues.

-Dumpster now has tarp to cover during nights and weekends when site is inactive.
- Straw wattles have been installed around perimeter that is disturbed and in process of being landscaped.

Correction request:
- pick up staging area below south building around muddy tracks and stockpile.

General Inspection3/15/20183/15/20183/19/2018PPEND
DetailsAndy J. Long
General Inspection3/8/20183/8/20183/8/2018AFAIL
DetailsAndy J. Long
Site walk around inspection conducted:

- loose construction trash visible around perimeter of site in vegetation along Walling Creek. Some foam board pieces observed in creek.
- loose trash blown under Parkcenter Bridge in MA Williams Park.
- signifcant amout of dog poop along pathway (presumably from new Arboretum tennants). Will give notice to facility managment.
- trash log sheet that was required due to previous issues at site had not been signed since the week of Feb. 11-17th

No trackout or runoff observed from site.

Verbal Correction to project manager Sean and Pentalon crew member Jeff to immediately have trash pick up walk around the site and along the banks and to remember to complete trash log sign off sheet.

General Inspection2/27/20183/1/20183/5/2018PPART
DetailsMichael Zawacki
Greenbelt on N/NW has dirt on it, BMPs need to be removed and area stabalized or be replaced. Some loose trash around site, some styrofoam and plastic sheeting still in trees across creek.
General Inspection2/26/20182/26/20182/27/2018 CANC
DetailsAndy J. Long
General Inspection2/9/20182/9/20182/9/2018PPASS
DetailsAndy J. Long
Trash control plan implmented for this week. Landscaping around the perimeter and stormwater pond will be active next week.

I warned that with the windy conditions the site will need to be vigilant on pick up.
General Inspection2/2/20182/6/20182/7/2018APEND
DetailsAndy J. Long
landscaping crews will be onsite this week to do landscaping behind the completed building and Greenbelt. Notified project manager that no stockpiling allowed on Greenbelt path. Landscaping crews will rake and clean shoulders to remove white foam bits.

Trash protocol still in effect.
General Inspection1/30/20182/2/20182/2/2018APASS
DetailsAndy J. Long
Week of trash control has continued to improve site. No loose trash or wrapping around perimter and along path.

Discussed how next week crews will either rake and sweep up white foam bits along the shoulder of Greenbelt. May try lawnmower with bag or leaf blower that can have suction.

NO trackout, spills, or other issues. Will check back next week.
General Inspection1/26/20181/30/20181/30/2018APEND
DetailsAndy J. Long
8:45 attend safety meeting to go over trash rules with sub-contractors and site employees.

Review City and EPA permit conditions regarding trash control and housekeeping.

Perimeter in good condition in regards to larger wind blown trash.

Request to pick up trash along Parkcenter across the street from project where workers have been parking. Request to pick up trash within the fence in between the two buildings where trash channels.

Site to rent or acquire lawn mower with bag suction to collect the little foam balls and bits stuck in the grass. Will notify BPR.



BMP Violation1/26/20181/26/20181/26/2018PPEND
DetailsAndy J. Long
follow up trash inspection

Site has conducted daily trash pick up daily this week and worked on consolidating materials in staging area.

Corrections completed:
- trash control plan submitted. To be checked for compliance weekly by ESC Inspectors
- no large trash observed loose around perimeter or within site. Litter and chunks of material around stormwater swale inside site has been picked up.
- permit signs now posted around site.

Next week corrective actions must continue:
- get equipment to get hanging plastic sheeting hanging in thorn bushes (two pieces unable to be pulled loose)
- Shoulder of greenbelt will be cleaned and swept to remove the small debris trapped in mud and grass.
- ESC Inspector will attend site safety meeting to issue trash warning and instructions to all sub-contractor teams.

Additional plans submitted  1/26/2018 DONE
DetailsAndy J. Long
Pentalon Construction has submitted requested Trash Control Plan. This is uploaded in the ESC document section
BMP Violation1/24/20181/25/20181/25/2018APEND
DetailsAndy J. Long
Corrective actions in progress:

-ESC permit signs now posted around site at entrance and in locations along Greenbelt path

- designated trash crew has been established, significantly less trash around perimeter of site, but continued daily clean up is required.

corrections remaining, due Friday 1/26 PM:

- complete trash pick up on interior of site, trash in stormwater swale and in perimeter fence.
- continue exterior trash walks along Walling Creek and Greenbelt
- submit written Trash Control program to ESC division for review
- cover dumpsters and temporary containments

- conduct employee trash pick up training each week, require subcontractor pick up end of each day

- enforce designated smoking area.

BMP Violation1/23/20181/24/20181/24/2018PPEND
DetailsAndy J. Long
Trash pickup still in progress. ESC permit signs are being posted around site. RP is aware of all corrections pending and due this Friday including covered dumpster. Inspection Thursday morning

BMP Violation1/22/20181/23/20181/23/2018PPEND
DetailsAndy J. Long
Majority of exterior trash identified Monday 1-22 has been picked up. Still some small pieces visible in certain locations, directed clean up efforts to under the bridge and around the Barber pumphouse, and requested more walk throughs along Walling Creek banks.

24 hour compliance request extend till tomorrow.

2nd written correction request issued:

- starting 1/24 PM, any significant amount of trash found around the exterior of the site during follow up inspections will result in "special investigation" fees issued to the site

- clean up and consolidate all trash within the work and construction staging area, in particular around the stormwater swale by Friday 1/26.

- submit updated trash and ESC inspection protocol for site that will continue until completion.

- construction dumpsters must be covered at end of the day and on weekends.

Complaint Inspection1/22/20181/22/20181/22/2018AFAIL
DetailsAndy J. Long
Written correction notice issued to on-site supervisor Shaun:

-24 hour compliance request to pick up all visible loose trash and construction debris along pathway and vegetation and inside of project fencing. Net out any floatables seen in water. If fail, potential SWO or other enforcement.

- 48 hours compliance deadline to pick up all loose debris and litter within site staging area.

- designate a smoking area with trash can, pick up all butts around site
General Inspection1/19/20181/19/20181/19/2018PPART
DetailsAndy J. Long
No trackout or discharges observed.

Corrections:
- pick up trash around perimter, in particular in area south of buildings and along Walling Creek.
- remove DI bags on Parkcenter MS4 inlets now that parking lot is paved/stabilzied.

New project superintendent for Pentalon Construction ###-####
General Inspection1/12/20181/16/20181/18/2018ACANC
DetailsAndy J. Long
General Inspection1/12/20181/12/20181/12/2018 PEND
DetailsAndy J. Long
No trackout or discharges.

Need to advise RP to protect root zones of trees south of project, vehicle and equipment have tracked here.
General Inspection12/28/201712/28/201712/29/2017 CANC
DetailsAndy J. Long
General Inspection12/13/201712/13/201712/13/2017 PASS
DetailsMichael Zawacki
Inspected 12-11
General Inspection11/28/201711/28/201711/28/2017 PASS
DetailsAndy J. Long
Building 3 is now complete with ESC permit finaled. Parking lot for Arboretum now paved and stormwater facilities connected. Concrete washout onsite for remaining work occuring on building 1 and 2. No trackout or discharges. Inspected 11/27 PM. 3 open ESC permits at Arboretum (site, bldg 1, bldg 2)
General Inspection11/13/201711/13/201711/13/2017 CANC
DetailsAndy J. Long
General Inspection10/27/201710/27/201710/31/2017 PASS
DetailsMichael Zawacki
Talked to super, he will take care of loose garbage and the knocked over wash tub.
General Inspection10/10/201710/12/201710/16/2017PPASS
DetailsMichael Zawacki
Perimeter controls intact, no dirt going offsite. Large buffer between path and south side of project. Site maintained and free of trash. Most excavation is done, majority of work is building exterior & interior and landscaping.
General Inspection10/6/201710/6/201710/10/2017 CANC
DetailsAndy J. Long
General Inspection9/19/20179/21/20179/26/2017ACANC
DetailsAndy J. Long
General Inspection9/13/20179/13/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection8/25/20178/29/20178/31/2017PCANC
DetailsAndy J. Long
General Inspection8/23/20178/23/20178/25/2017 CANC
DetailsAndy J. Long
rescheduled for 8/29
General Inspection8/8/20178/8/20178/10/2017 CANC
DetailsAndy J. Long
BMP Violation7/7/20177/24/20177/24/2017PPEND
DetailsAndy J. Long
Landscaping around perimeter in progress. Will check for cleanup once operation is complete.

Verbal correction request to RP to have landscaping tractor slow speed and to have the driving area wetted down. Lots of dust blowing across road.
Site Preparation7/11/20177/13/20177/12/2017ACANC
DetailsMelissa Jannusch
error
General Inspection7/10/20177/11/20177/11/2017ACANC
DetailsMelissa Jannusch
Rescheduled for thrusday.
Conference7/7/20177/10/20177/11/2017APASS
DetailsMelissa Jannusch
Jason Jones RP and Mike West GC meet to go over corrections for site. Theya re hydrovaccing the system tomorrow. RP says the DI bags will be in on wednesday evening along with the reinstallation of the perimeter wattles.
Follow up scheduled for thursday AM.
Site Preparation7/10/20177/11/20177/10/2017ACANC
DetailsMelissa Jannusch
BMP Violation7/7/20177/10/20177/10/2017PFAIL
DetailsMelissa Jannusch
DI bags not installed. Mike West GC back from vacation. He is meeting with Jason Jones RP/ SWPPP contractor on site this afternoon to go over a game plan and timeline for cleaning the site and making all SWPPP and ESC corrections. GC Mike West plans to call this afternoon to go over timeline and plan of for completing corrective actions.
Complaint Inspection7/7/20177/7/20177/7/2017PFAIL
DetailsMelissa Jannusch
Corrections:
Clean curb and gutters and inlets
Install DI bags
Sweep parking lot. Clean oil spill on parking lot.
Use concrete washouts.
Corrections issued to GC on duty.
Follow up set for Monday afternoon
Conference with RP and GCs scheduled for next week to go over more less urgent corrections.
General Inspection6/28/20176/28/20176/28/2017PPASS
DetailsMelissa Jannusch
Complaint Inspection6/22/20176/22/20176/26/2017PPEND
DetailsAndy J. Long
Fence follow up.

Dirt pushing fence out into Greenbelt lane has been removed as requested.

Corrections needed:
- remove and replace damaged sections of chain link fence to stop obstruction of Greenbelt path area.

- need to sweep up in southeast corner of site. Unprotected stockpile should be removed or have a perimeter sediment control installed.
General Inspection6/20/20176/20/20176/21/2017 PART
DetailsMelissa Jannusch
Respond to corrections written in the SWPPP inspection reports. Fix silt fence and construction fence on site. Clean trackout in the entrance. Trash containment has improved. Continue to pick up trash regularly. Flood water is receding. Pick up any construction trash that has floated into wetland area during flooding.
General Inspection6/5/20176/5/20176/6/2017 PART
DetailsMelissa Jannusch
Fence needs repairs still
Windblown trash in pond
Continue sweeping
Dumpster ok
Site needs a trash pick up. Bottles, paint cans and other trash are littered around the site.
Talked with project manager about corrections.
Dewatering has not started yet. Project manager will call for an inspection when dewatering starts.
General Inspection5/19/20175/19/20175/19/2017PPART
DetailsMelissa Jannusch
Silt fence has still not been repaired. No sediment moving offsite. No trackout. Water is rising.
General Inspection5/18/20175/18/20175/19/2017 PART
DetailsMelissa Jannusch
Silt fence has still not been repaired. No sediment moving offsite. No trackout. Water is rising.
General Inspection5/3/20175/3/20175/3/2017 CANC
DetailsMelissa Jannusch
General Inspection4/11/20174/18/20174/20/2017ACANC
DetailsMelissa Jannusch
General Inspection4/10/20174/10/20174/11/2017 PASS
DetailsMelissa Jannusch
WIP. SWPPP inspections are up to date. Water from high river flows is flowing through corner of the site. Ensure no pollutants are entering this area and being discharged into river water. Two concrete washout nearly full third is ok. Uncovered containers with unknown materials and rain water are uncovered. Dispose of properly and potentially cover if any pollutants are contained in barrels.
Corrections requested: Pick up wind blow trash around perimeter fencing. Repair silt fence. Around perimeter. Clean green belt where fence was run into.
General Inspection3/24/20173/24/20173/24/2017 PASS
DetailsMelissa Jannusch
WIP. No trackout, trash contained, concrete washout ok. Water level high on the NE side of the site. No corrections requested.
Tracking Control3/8/20173/9/20173/9/2017PPASS
DetailsMelissa Jannusch
SWPPP is up to date. Trackout has been cleaned up. Small push electric sweeper is on site and used when trackout occurs. Minor corrections are noted in SWPPP and action to fix them underway. Corrections include concrete washout maintenance, slight trackout onto greenbelt, waste containers. Trash around site has been picked up.

Tracking Control3/8/20173/8/20173/8/2017AFAIL
DetailsJames Ady
No track out control observed
General Inspection2/23/20172/23/20172/23/2017 FAIL
DetailsMelissa Jannusch
Windblown trash. Silt fence needs repairs. Corrections requested: fix fence, clean trash Spoke with Jason (RP) will call when fixed
General Inspection2/8/20172/8/20172/8/2017 PASS
DetailsMelissa Jannusch
Silt fence looks to be recently fixed. Still a few minor holes but okay for now. Green belt is cleaned. No track out or discharge. Trash is mostly contained. Okay for now keep an eye on this for future inspections. Staging area has been cleaned up. Liner is placed under mixer. Okay to pass.
General Inspection1/23/20171/24/20171/24/2017PPART
DetailsMelissa Jannusch
Follow up with dewatering operation. dewatering onsite drainage has eliminated need for dewatering operation. Spoke with Jason of J.E.C and Mike RP about perimeter control fixes, cleaning dirt on greenbelt, stagging area with pollution pervention measures in place, and continued trash clean up/ good house keeping. No track out observed, no offsite discharges.
General Inspection1/19/20171/19/20171/23/2017 PEND
DetailsMelissa Jannusch
Flooding due to Suez water leak. Site SW infiltration system not yet complete. Areas of the site are under standing water. Working on dewatering plan and containing the sediment from runoff. Currently no water is discharging to the River or walling creek. Water is ponding in grassy area near greenbelt and in onsite swale which is currently overtopping. Check in on mixer contaiment and ecopan clean up (full of water).
General Inspection1/4/20171/4/20171/5/2017 CANC
DetailsAndy J. Long
General Inspection12/19/201612/20/201612/21/2016PCANC
DetailsAndy J. Long
General Inspection12/7/201612/12/201612/19/2016PCANC
DetailsAndy J. Long
check for trash clean up and installation of wattles or new silt fence....
General Inspection12/7/201612/7/201612/7/2016 PART
DetailsAndy J. Long
Trash not adequately picked up as requested 11/23.

Need to repair damaged silt fence sections or install alternate perimeter sediment control.
General Inspection11/22/201611/22/201611/23/2016 PART
DetailsAndy J. Long
WIP. No trackout from site, no sediment runoff or dirt outside of silt fence perimeter. Permit sign and SWPPP info onsite.

Correction requests:
- remove damaged section of silt fence on west boundary of fence (< 100 yards)
- remove sagging fence sections in grass. Do not disturbe vegetation, will be adequate vegetative buffer.
- need to pick up windblown trash around the site and perimter, as well as the parking lot across the street. Increase # of trash receptacles and train employees on proper disposal
General Inspection11/7/201611/7/201611/8/2016 PASS
DetailsAndy J. Long
WIP. BMPs installed. No trackout, discharges, or fugivitive dust observed at time of inspection.
Tracking Control10/21/201610/21/201610/21/2016PPEND
DetailsAndy J. Long
RP called to notify that they have ordered a street sweeper to clean up the trackout to Parkcenter. DI bags have filter bags installed and were in good condition on 10/20

Will check conditions on Monday.
General Inspection10/20/201610/20/201610/20/2016PPASS
DetailsAndy J. Long
Vertical construction in progress at Arboretum project. 3 seperate buildings with 3 ESC permits, and the main site ESC permit issued for grading and utilitiy installation. See ESC16-00435, 436, 437.

Silt fence perimeter is in tact, no breaches or sediment runoff to Greenbelt path. No trackout from site, designated parking for the 60+ employees is across street to limit traffic. MS4 inlets on both sides of road have filter bags installed with good capacity remaining. Trash and materials contained on site. Concrete washout bins in several locations provided.

Observed pollution prevention on site with secondary containment storage for concrete form oils, diesal gas containers, and spill pans under neath porta-pots.

Approved.
General Inspection10/10/201610/10/201610/10/2016 PASS
DetailsAndy J. Long
Silt fence perimeter is installed. No trackout to Parkcenter. No spills or dischareges observed. Trash and materials contained. Permit & SWPPP information posted at entrance. Approved.
General Inspection9/23/20169/23/20169/23/2016 PASS
DetailsAndy J. Long
No trackout. BMPs installed.
General Inspection9/8/20169/8/20169/8/2016 PASS
DetailsAndy J. Long
Silt fence perimeter is in good condition and surrounds entire site. No trackout or discharges to Parkcenter, MS4 inlets have sediment control. Onsite permanent storm water facilities have been installed and site retains own storm water now. Workers are parking across street, no issues. Property owner is co-developer of project.
General Inspection8/24/20168/24/20168/24/2016 PASS
DetailsEvan Jenkins
General Inspection8/9/20168/9/20168/10/2016 PASS
DetailsAndy J. Long
Foundation footprint is now complete, WIP on first level of parking. No trackout from site, workers parking across street on stabilized areas. MS4 inlets on both sides of entrance on Parkcenter have protection. Silt fence perimeter in good condition. No fugitive dust observed at site, no complaints/issues reported by Greenbelt users.
General Inspection6/29/20166/29/20166/29/2016PPASS
DetailsAndy J. Long
WIP. No trackout from construction entrance. Inlet filter bags installed on MS4. No sediment or other material crossing silt fence perimeter & Greenbelt. No fugitive dust at time of inspection, water truck on site.

No immediate corrections issued but will request that straw wattle utilized in dewatering operation along Walling Creek bank area east of lift station should be removed.
General Inspection6/6/20166/6/20166/6/2016PPASS
DetailsAndy J. Long
WIP. No trackout, no fugitive dust. No surface water on site or discharges. Silt fence perimter in good condition.
General Inspection5/11/20165/11/20165/11/2016PPASS
DetailsAndy J. Long
WIP on installing stormwater retention pit underground. No pumping of groundwater has been observed at time of inspection and surface water has now re-infiltrated into the ground.

Sediment bags were changed out as requested and rock construction entrance installed. No discharges from site and perimeter has been cleaned of all mud. Grass seems to recovered well from the dewatering operation, will check with Parks n Rec to see if their conditions were satisfied.

No corrections issued at this time, WIP.
Conference5/3/20165/3/20165/3/2016PPART
DetailsAndy J. Long
Groundwater discharge offsite has now stopped. Main sewer connection is complete, completing line within site. Project coordinator states that there is only 15' of work remaining and dewatering will be completed.

Yesterday the site's RP took turbidity samples up and downstream of site and found discharge to be within allowable turbidity limits.

Today, ESC coordinator, ESC inspector, Brighton Corp, and Pentalon construction inspected site for final corrections:

- sample red clay-like discharge residue to determine if it is a pollutant of concern. Speculating that it is red clay or tannins.
- remove hose and dewatering equipment
- sweep gutter in front of site and change out DI bags
- clean up stretch of Greenbelt within site perimeter
- log information in SWPPP
- schedule meeting with Boise Parks and Rec to inspect potential damage and work out details or repair/cost recovery.
BMP Violation5/2/20165/2/20165/2/2016PPEND
DetailsAndy J. Long
Dewatering still in progress. Water discharging into designated area per plan. No observable impact to water quality in Walling Creek. No visible plume in Boise River where Walling Creek enters.

Flow at outlet is clear and free of any odors. Water flowing through vegetated buffer zone with some force dissipation.

Crew hopes to complete work and dewatering today.

Corrections requested while onsite:
- sweep up gutter at entrance and do maintenance the two MS4 filter bags that received discharge from the operation.
- take turbidity samples up and downstream of discharge for records
- repair rip in sediment bag on the hose if dewatering is to continue tomorrow.
Conference4/29/20164/29/20164/29/2016PPEND
DetailsAndy J. Long
check dewatering plan setup

Dewatering plan not set up per approved plan. Site is still under water in many areas due to slower than expeceted infiltration rates.

Approved to dewatering existing surface water using low volume pump skimming water from top and discharging through hose to sediment filter bag and grassy vegetated buffer between the sewer lift station and Parkcenter.

Requested that if dewatering occurs over weekend, it should be monitored regularly to check that discharge is in compliance with visible standards ( no visible plume)

Will check back on Monday
Permit Ready to Issue  4/29/2016 DONE
PLEASE do not re issue
Telephone call  4/29/2016 DONE
called Jason to let know plan mod permit is ready and that they need a site prep inspection and that there are fees due
Change Status (ISS)  4/29/2016 DONE
all requirments met
Additional plans submitted  4/28/2016 DONE
received (2) sets of de-watering plan
Routing - Erosion and Sediment4/28/2016 4/28/2016 PASS
DetailsAndy J. Long
Dewatering plan is satisfactory with pump rates, settling basin volume, and filter bag specification provided in detail. Portable 700 GPM pump will be used pump water at excavation point into trench used for settling and to transport water away from excavation. Water in this trench is to overflow into grassy area and infiltrate.

Two stationary 1000 GPM, 4 " pumps will be utilized to lower groundwater away from active work in trench. The groundwater will first be put into a purge basin to capture the more sediment laden water associated with starting the process. Once water has cleared/purge pond is full water will be pumped to the grassy area between the the sewer lift station and Parkcenter, being treated by dewatering bags and then passing through grassy area until flowing through bank vegetation.

ESC inspector to be onsite prior to starting pumping to check that plan has been implemented as stated in the plan.

This plan does not waive requirements of CGP or City of Boise ESC permit conditions.
PLANS/APPL TAKEN TO FRONT DESK  4/28/2016 DONE
BMP Violation4/27/20164/27/20164/27/2016APEND
DetailsAndy J. Long
check for corrective actions on dewatering failure at site. Check that Greenbelt has been cleaned up

Greenbelt path between site and Walling Creek has been scraped and cleaned up as requested. Water no longer flowing over Greenbelt or under Parkcenter Bridge to M. Willimans Park pond. Some water still ponding on grass and path between road and project that connects the sidewalk to the Greenbelt.

Project management decided to cease groundwater pumping and sewer/water line work until a plan to come into compliance is formulated and approved.

Project is in coordination with Boise Parks & Recreation to repair damage to grass and park property.

Requested that site submit ESC variance/modification documenting dewatering plan, treatment methods, and paperwork documenting agreement to repair damages incurred to the City property.
BMP Violation4/26/20164/26/20164/26/2016PFAIL
DetailsAndy J. Long
Muddy discharge outside of site perimeter in two locations.

Inadequate dewatering and onsite retention for amount of dewatering occuring.

Corrections:
- stop discharge on north side of the project to Walling Creek buffer vegetation. Clean up mud on Greenbelt this afternoon. Users are riding/walking on the grass causing damage.

- water flowing towards M.A. Williams Park swale is not treated. Need to stop flow or install a sediment control

Will inspect in the morning for corrections at site..
General Inspection4/14/20164/14/20164/14/2016PPASS
DetailsAndy J. Long
Dewatering for sewer installation is in progress. Water from initial pumping has stayed on site within the bermed area and appears to be infiltrating at a decent rate.

There is a slight flow through vegetated strip, silt fence, and across the Greenbelt path. The water looks clear and does not appeart to be reaching Walling Creek. I recommended that water be directed instead to the large grassy area to the south of the site in between project and River. Jim with Cougar agreed and will work on that.
Complaint Inspection4/12/20164/12/20164/12/2016PPEND
DetailsAndy J. Long
report of dewatering, check for dewatering plan and setup...

dewatering in progress to place the first sewer connection. RP Jason was not aware of dewatering so requested he make sure that the contractor has a plan and is aware of the discharge water quality standards.

Currently a single pump is drawing water out of ground and discharging into a channel built within site. Water flow to the rest of the site that has a earthen berm perimeter. Plan is to allow water to re-infiltrate rather than disharge. Berm currently retaining water, some water is seeping through and going to the grassy park area.

Issued warning about not pumping or allowing untreated water into the Walling Creek tributary to the Boise River. Will continue to monitor. Onsite contact Kyle stated that after today, dewatering will stop for several days until plans are confirmed.
Site Preparation4/5/20164/5/20164/5/2016PPASS
DetailsAndy J. Long
Jason Phone #: ###-####

Permit sign posted. Construction entrance installed (though may need to be widened). Sturdy perimeter silt fence has been installed. MS4 drop inlets on Parkcenter have new sediment filter bags installed.

Approved for construction. Rough grading and grubbing in progress.
Issue & PRINT permit COM  4/4/2016 DONE
Application received  12/14/2015 DONE
Application submitted via PDS Online on Dec 14 2015 9:24AM