Permit Information
Permit NumberESC16-00406
StatusIssued
Name CLAYTON CONNER
Site Address 1200 E HIGHLAND VIEW DR
Project NameHighlands Cove Sub
Customer Number 
ePlanReviewNo
Description
Foothills residential subdivision development on currently undeveloped land around Crane Creek Golf Course connecting Braemere to Highland View Drive. CGP eNOI active July 13, tracking #IDR12AN63. SWPPP submitted with site plan, narrative, and construction schedule. Site preparation inspection/conference & ESC BMP installation must occur prior to grading activity. BMPs include 3 construction entrances, designated staging area off Chardie, down slope perimeter silt fence and fiber wattles installed on cut slopes as marked on ESC plan. Fugitive dust control shall be required. Protect existing and newly installed stormwater facilties for sediment and other pollutants.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/10/20208/10/20208/10/2020 PASS
DetailsMichael Zawacki
Few empty lots left in phase. Area is stable and has no issues.
General Inspection7/24/20207/24/20207/28/2020 PASS
DetailsMichael Zawacki
All homes in phase are clean and contained. No issues with phase.
General Inspection7/7/20207/9/20207/9/2020PPASS
DetailsMichael Zawacki
Few homes under construction. No issues on site. RP and builder always at site keeping an eye on things.
General Inspection7/1/20207/1/20207/7/2020 CANC
DetailsAndy J. Long
General Inspection6/16/20206/16/20206/16/2020PPASS
DetailsMichael Zawacki
No issue with phase. Building lots all in good condition.
General Inspection6/8/20206/8/20206/8/2020PPASS
DetailsMichael Zawacki
Site is clean. No issues with any of the building lots.
General Inspection5/29/20205/29/20205/29/2020 CANC
DetailsAndy J. Long
General Inspection5/14/20205/14/20205/14/2020 PASS
DetailsMichael Zawacki
Site is clean, no issue with any of the building lots.
General Inspection4/29/20204/29/20204/29/2020 PASS
DetailsAndy J. Long
BMPs installed. RP on site daily. DI bags in phase one have all been changed out/maintained as requested. Subdivsion concrete washout facility provided for home construction.

No corrections requested.
General Inspection4/14/20204/14/20204/14/2020PPASS
DetailsMichael Zawacki
All building lots are clean. No blowing trash or trackout.
Street has been cleaned after landslide. No repairs yet made to hillside.
General Inspection4/2/20204/2/20204/6/2020 PART
DetailsAndy J. Long
DI bags on Broadstone have not been maintained/replaced as requests.

No other issues. Provided reminder to RP to have them serviced.
General Inspection3/13/20203/18/20203/18/2020PPASS
DetailsMichael Zawacki
Conners keep site clean and all builders under control. No major ESC issues, some trash on hillside above golf cart path. No more blowouts onto cart path.
Workers parked on street, avoiding dirty lots.
Still only one home under construction on Chardie. No issues.
General Inspection3/13/20203/13/20203/13/2020 CANC
DetailsAndy J. Long
rescheduled
General Inspection2/25/20202/27/20202/27/2020PPART
DetailsAndy J. Long
Corrections needed:

- maintain DI bags on Broadstone
- address erosion on lot 7 by creating containment berm to prevent runoff from flowing down rear slope.
- provide additional concrete washouts. May need to add additional rock to construction entrance.
General Inspection2/20/20202/20/20202/25/2020 CANC
DetailsAndy J. Long
General Inspection1/31/20202/5/20202/6/2020PPART
DetailsMichael Zawacki
2 lots on highland are rilling and starting to let sediment go towars culdesac, will need to be fixed when weather permits. No issues at any of the construction lots. No tracking onto roads.
General Inspection1/28/20201/28/20201/31/2020 CANC
DetailsAndy J. Long
rescheduled
General Inspection1/13/20201/13/20201/13/2020 PASS
DetailsMichael Zawacki
No sc issue with building. Site is snow covered, will inspect after melt for issues.
General Inspection12/27/201912/27/201912/27/2019 PASS
DetailsAndy J. Long
No muddy runoff or trackout in subdivsion. Need to schedule conference with RP regarding some erosion on lots of Highland View down to Broadston. No corrections requested at this time
General Inspection12/12/201912/12/201912/12/2019PPART
DetailsMichael Zawacki
Rilling from upper lots never fixed.
No blowouts to golf course. No ESC issues from rains.
Conference11/27/201912/3/201912/3/2019PFAIL
DetailsMichael Zawacki
Requested corrections not made.
Still has rilling going of back of lot.
General Inspection11/19/201911/19/201911/19/2019 PART
DetailsAndy J. Long
Subdivision BMPs installed.

Correction request to install slope diversion berms on lot 7 block 2 (owned by Conner Construction) due some runoff causing erosion damage around the rock retaining walls installed.
Conference10/31/201911/4/201911/4/2019ADONE
DetailsAndy J. Long
4:30 PM with Gerald ###-####]

Meet with future builder Clarity Dwellings to review ESC regualtions and BMPs that will be needed on his two lots in Highlands Cove phase 1
General Inspection10/17/201910/17/201910/17/2019 PASS
DetailsMichael Zawacki
Neighborhood common aras and empty lots stabalized. Lots with work are responsible for their own BMPs. Site rp is on site.
General Inspection10/2/201910/2/201910/2/2019 PASS
DetailsMichael Zawacki
WIP on multiple homes on phase. No esc issues in area. SIte RP is usually available on site.
General Inspection9/17/20199/17/20199/17/2019 PASS
DetailsMichael Zawacki
Neighborhood in good shape. Individual homes getting inspected. RP notified of any BMP violations.
General Inspection9/2/20199/2/20199/3/2019 CANC
DetailsAndy J. Long
Conference8/15/20198/16/20198/22/2019APEND
DetailsAndy J. Long
notify RP of corrections needed
General Inspection8/14/20198/14/20198/15/2019 FAIL
DetailsAndy J. Long
Corrections needed:

-Concrete washout area needs clean up and additional capacity.
- Post subdivsion ESC sign and SWPPP sign at job trailer
- Clean out full sediment bags within phase 1
General Inspection7/25/20197/30/20198/1/2019AFAIL
DetailsMichael Zawacki
DI bags have never been reinstalled on north side of sandpoint as requested.
DI bags on Broadstone are full.
Common area by 1296 broadstoned still wet, rills on hillside below.
General Inspection7/25/20197/25/20197/25/2019 CANC
DetailsAndy J. Long
General Inspection7/10/20197/10/20197/10/2019PPART
DetailsAndy J. Long
Corrections needed:

- install sediment bags at bottom of Sandpoint on the north side of road.
- continue to fix erosion caused by irrigation on common area next to 1296 Broadstone. Controls installed have failed.
- remove old and now blank sign at entrance on Highland View.
- haul off full concrete washouts so the concrete people don't continue to use full ones. Put sign next to washout with capacity.


Subdivsion is clean, no trackout, dust, or significant windblown trash issues. Concrete washout located next to the Highlands Cove job trailer.

General Inspection7/2/20197/2/20197/2/2019 PASS
DetailsAndy J. Long
No violations observed. Most corrective actions requested previously are complete. No corrections at this time.
General Inspection6/17/20196/17/20196/19/2019 PASS
DetailsMichael Zawacki
No blowing trash or dust at time of inspection. Some concern wth contained trash at first home may come loose.
General Inspection5/22/20195/31/20196/4/2019PPASS
DetailsMichael Zawacki
All work contained, lawn around home. Exterior of addition completed.
General Inspection5/29/20195/29/20195/29/2019PPEND
DetailsMichael Zawacki
Area around inlets needs sediment cleaned. Some runoff onto golf cart path. Specialty Supply on site with new wattles.
General Inspection5/10/20195/23/20195/22/2019PPEND
DetailsAndy J. Long
Sediment runoff and hillside erosion in previously mentioned areas of phase 1 had increased erosion. Crews are now onsite and getting direction for slope repair (excavation/fill, slope tracking, and wattle reinstallation). All DIs are to be changed out and additional permiter controls on lots with runoff issues.

All corrections listed are still in progress. Compliance follow up has been extended to Friday May 31.
General Inspection5/8/20195/8/20195/8/2019PFAIL
DetailsAndy J. Long
Corrections needed:

- empty out/replace or remove full sediment bag on Highland View entrance to phase 1
- remove storm drain bags from the old storm drains on Highland View, no longer needed.
- remove old SWPPP sign and binder holder or relocate to job trailer and concrete washout area. Post new permit signage.
- fix erosion and uncontrolled runoff from lot 7 block 2 along sidewalk and leading down to lot 8
- re-install perimeter controls on lot 8 block 2
- repair eroded slope below lot 8 leading down to Broadstone.
- clean up loose dirt on sidewalk below lot 9 block 2 and fix/replace final row of wattle dirt has ran over.
- pick up windblown trash on slopes behind lots 3 through 6 on block 3. Lots of plasics caught in bushes.
- empty out and replace sediment bags on the storm drains at bottom of Sandpoint.
- address rill erosion and damage slope BMPs in between lot 22 and lot 23 on block 2.
- maintain/replace sediment bags on storm drains on Broadstone, both are full
- remove old washouts that are over 75% full. Clean up dried washout on lot 16 block 3. Provide new washout containment facilities.
- install check dams and or wattles in the drainage way behind lot 2 block 1. Drainway leads to an unprocted storm drain in phase 2.

All corrections must be complete/addressed by Thursday May 23rd.
General Inspection4/26/20194/30/20194/30/2019APEND
DetailsAndy J. Long
RP to schedule onsite conference with ESC inspectors and developer
General Inspection4/24/20194/24/20194/26/2019 PEND
DetailsAndy J. Long
Corrections needed:

- walk through inspection with site stormwater and erosion team is needed. Need to address erosion and runoff from lots 6-7 on block 2 Highland View
- Clean out DI bags on north side of Sandpoint at bottom of hill.

Follow up scheduled.
General Inspection4/9/20194/9/20194/9/2019PFAIL
DetailsMichael Zawacki
post rainfall inspection
Rilling and blowout behind 1284 Broadstone, causing to locations of mud on golf cart path. Water also coming off 1280 but no cases in PDS.
Inlet protection should be cleaned and debris around inlets cleaned up.
General Inspection3/28/20193/28/20193/29/2019PPART
DetailsMichael Zawacki
Some dirt run on onto sidewalk in front of 4026 Sandpoint and above. Some dirt on sidewalk in front of active sites on Broadstoned. Some rills still coming from upper lots onto lower. Golf cart path has been cleaned and no active rills onto cart path
General Inspection3/14/20193/14/20193/15/2019PPEND
DetailsMichael Zawacki
Site walk through completed. Will write up report and share with RP and all builders. No major issues at site.
General Inspection3/1/20193/1/20193/1/2019 PASS
DetailsMichael Zawacki
Met with RP on site on 2/27. Some runoff from one lot that will be fixed.
General Inspection2/14/20192/14/20192/15/2019 CANC
DetailsAndy J. Long
General Inspection1/30/20191/30/20191/30/2019PFAIL
DetailsAndy J. Long
Corrections needed:

- fix erosion and sediment runoff occuring on Sandpoint (lot 9, block 2). Previous inspeciton notes on 12/11 incorrect, no repair of rill/channel. Need to install additional wattles to slow flow of water and retain on lots rather than flowing down cut slopes.
- fix erosion off Broadstone on common area leading to golf course.
- pick up loose trash in common areas.
General Inspection1/22/20191/22/20191/23/2019 FAIL
DetailsAndy J. Long
Correction needed for phase 1 Highlands Cove:

-fix erosion and sediment runoff from lot 9, block 2. Divert water from running over slope through existing rills. Install slope wattles and/or perimeter wattle to contain sediment from running onto sidewalk and gutter.
General Inspection1/4/20191/7/20191/7/2019PPASS
DetailsMichael Zawacki
All streets and sidewalks clean. Lots are all stable and free from issues. Workers parking on streets.
General Inspection1/3/20191/3/20191/4/2019 CANC
DetailsAndy J. Long
rescheduled
General Inspection12/19/201812/19/201812/19/2018 PART
DetailsMichael Zawacki
Lots of dirt on road and sidewalk off of Broadstone. Rest of site looks good.
General Inspection11/27/201812/4/201812/11/2018APASS
DetailsAndy J. Long
check on storm drain DI bag maintenance and lot 9, block 2 erosion

DI bags have been cleaned out and/or replaced with new sediment bags.

Area of erosion from runoff from lot 9 has had landscaping and rockery installed to stabilize area.

Approved. Wintery conditions, no SFH violations or discharges occurring.
Conference11/23/201811/26/201811/27/2018ADONE
DetailsAndy J. Long
call Clay to discuss erosion and sediment runoff on Lot 9 , block 2

Corrections requested:
- maintain all DI bags in Highlands Cove phase 1
- fix erosion and sediment runoff from lot 9, block 2. Divert water from running over slope through existing rills. Install slope wattles and/or perimeter wattle to contain sediment from running onto sidewalk and gutter.
Random Inspection11/23/201811/23/201811/23/2018PFAIL
DetailsAndy J. Long
Corrections needed:

- clean out and maintain DI bags on Sandpoint and Broadstone. Drain in front of lot 22, block 2 has had bag drop to bottom of sump. Other DI protection is full.
- install controls to control erosion and sediment runoff from lot 9, block 2 to Sandpoint.
General Inspection11/16/201811/16/201811/16/2018 PASS
DetailsMichael Zawacki
All building lots are clean. Streets and sidewalks dirt free. Homes have their own washouts. No issues on any lots. Conner construction keeps everyone in line.
General Inspection11/1/201811/1/201811/1/2018 CANC
DetailsAndy J. Long
General Inspection10/17/201810/17/201810/17/2018 PART
DetailsMichael Zawacki
Some rilling on lots on golf course. Talked to builders on site and they should be fixed next week. Some dirt in gutters, workers parking on street so no way to really get all dirt clean.
General Inspection10/2/201810/2/201810/2/2018 PASS
DetailsMichael Zawacki
Roads and sidewalks clean. Lot have their own BMPs. No issues on site.
General Inspection9/14/20189/17/20189/21/2018PPART
DetailsAndy J. Long
All grading and infrastructure work for Highlands Cove #1 is complete. Cut hills around perimeter have revegetated and still have ESC blankets and wattles installed. Storm drains have sediment protection. Individual homes permited seperately and are in good condition (trash contained, no trackout/discharges).

Correction request:
- repair rill from Lot 8 block 2 running down to Lot13 block 2. Prevent water from running down slope or install wattles and re-hydroseed when machine is out on site for phase 2. This request should be completed before Fall rains return, but is not immediate.


- inspect and clean out/change DI bags in phase 1, in particular on Broadstone.
Notified RP Clayton.
General Inspection9/14/20189/14/20189/14/2018 CANC
DetailsAndy J. Long
General Inspection8/30/20188/30/20188/30/2018 CANC
DetailsAndy J. Long
General Inspection8/15/20188/15/20188/15/2018 PASS
DetailsMichael Zawacki
Neighborhood BMPs all in place. Some dirt on roads and sidewalks from builders. Conners make sure builders take care of their own mess.
General Inspection7/31/20187/31/20187/31/2018 CANC
DetailsAndy J. Long
General Inspection7/6/20187/16/20187/16/2018APASS
DetailsMichael Zawacki
Neighborhood is in good shape. Each home is displaying permit and is responsible for their own BMPs. Phase 2 grading is underway.
General Inspection7/5/20187/5/20187/6/2018 CANC
DetailsAndy J. Long
General Inspection6/18/20186/20/20186/20/2018APASS
DetailsMichael Zawacki
Work on a few SFH. Each lot has own BMPs plus neighborhood BMPs. Conner Construction keeps site clean.
General Inspection6/18/20186/18/20186/18/2018 CANC
DetailsAndy J. Long
General Inspection6/1/20186/1/20186/1/2018 PASS
DetailsMichael Zawacki
Site held up well after rain. Cleaning crew already tasked with sweeping and cleaining in and around DIs. Slight rill starting to form leading to retention along golf course. Contractor was mad aware and will be corrected.
General Inspection5/17/20185/17/20185/17/2018PPASS
DetailsMichael Zawacki
post rainfall inspection.
No issues on site, builders taking care of their own lots. DIs are getting full, they started to pull and clean them while I was on site.
Random Inspection5/15/20185/15/20185/15/2018PPART
DetailsAndy J. Long
Correction request:

- corrective action is needed for runoff from lot 7 block 2 which is causing erosion channel next to sidewalk. Need to divert flows or install berm to prevent runoff to this slope, repair channel by filling in and raking
- hydroseed or stabilize disturbed area that was created for installation of new storm drain for the daylight basements.
- provide new concrete washout. RP on duty at site, pallet of washouts are ready for use.
General Inspection5/8/20185/8/20185/8/2018 CANC
DetailsAndy J. Long
General Inspection4/23/20184/23/20184/23/2018 PASS
DetailsMichael Zawacki
Met with clayton onsite and discussed future building. Currently no issues on site, lots and hillsides all stable.
General Inspection4/6/20184/6/20184/11/2018 PASS
DetailsMichael Zawacki
Area above Highland view is getting good vegative growth. ECB Blanket is nearly gone, wattles still on hillside, good growth. Area on NE hill going towards golf course has minimal growth and some rilling starting to form. Neighborhood is free from trackout and eroded sediment.
General Inspection3/22/20183/22/20183/22/2018 PASS
DetailsMichael Zawacki
No issues on site. Waiting for dry weather to start building on next lot.
General Inspection3/7/20183/7/20183/7/2018 PASS
DetailsMichael Zawacki
Lots are in good shape and hillside BMPs held up over the winter. DI bag on Broadstone needs to be cleaned.
General Inspection2/20/20182/20/20182/20/2018 PASS
DetailsMichael Zawacki
WIP on one home. Hillsides and empty lots are stable. Some small rills starting to form on back of a few upper lots. DIs are in good shape.
General Inspection2/5/20182/5/20182/5/2018 PASS
DetailsAndy J. Long
No recent activity. 1 SFH in Highlands Cove is in progress. Hillside erosion controls and revegetation appear in good condition no sigificant erosion rills or channels observed.

Seeded areas on the Broadstone culdesac may require additional application.

Storm drains have sediment filter bags installed.
General Inspection1/19/20181/19/20181/19/2018PPART
DetailsMichael Zawacki
Sandpoint: Some runoff onto sidewalks and into road. Some dirt has accumulated in gutter.
Broadstone: Some runoff onto sidewalk. Trackout from lots, looks like it is from joy riders and not construction activities.
General Inspection1/8/20181/8/20181/8/2018 PASS
DetailsMichael Zawacki
North and north west slopes still frozen. Lots on flats are starting to thaw, should be fine as long as people stay off them. Lower lots are all in good condition. DIs are clean, some sand in gutters and roads, probably from ACHD sand trucks, no sign of cause at site. One home currently under construction.
General Inspection12/22/201712/22/201712/22/2017 PASS
DetailsMichael Zawacki
No rills or runoff from homesites. DIs are protected, bags are arounf 1/4 to 1/2 full. No track out.
Tracking Control12/7/201712/7/201712/7/2017PPASS
DetailsMichael Zawacki
Trackout cleaned up. Gutters have been cleaned.
General Inspection12/1/201712/1/201712/1/2017 PART
DetailsMichael Zawacki
Highland View. Homesites are stable, no runoff or issues.
Sandpoint Way sout of Broadstone. 1 home under construction site is clean and free of track out. Some sand in gutters but DIs still clean.
Broadstone. North side gutter is full of dirt and DI needs to be pulled and cleaned.
Sandpoint north of Broadstone. Excessive mud and trackout coming down hill. Dumping at knocked over type 3 barricade is source. Saw other contractor dumping, Talked to RP and said he wuill order sweeper.
General Inspection11/16/201711/16/201711/16/2017PPASS
DetailsAndy J. Long
Erosion and sediment controls installed are working well. No new erosion rills or evidence of sediment runoff from slopes and graded parcels. 1 SFH in progress. No violations observed. RP Clayton on-site.

Two corrections needed before next inspection:
- new concrete washout facility (existing is full)
- repair wattle next to CC Golf Course golf cart path. Watch out for any increase in rills on this slope.
General Inspection11/2/201711/2/201711/2/2017 PASS
DetailsMichael Zawacki
Path has been cut around perimeter, will need to watch for erosion on streep slopes. Wattle and blanket on hillsides, also has been tackified. Some rills forming on building pads. One foundation has been poured. Washout has been removed.
General Inspection10/18/201710/18/201710/19/2017 PART
DetailsAndy J. Long
2 corrections requested:

- fix lining in the Outpak washout and move closer to road for easy use by concrete trucks.

- remove temporary DI bags on the two existing MS4 inlets that were at the end of Highland View. These inlets no longer receive runoff from the site.
General Inspection10/3/201710/3/201710/3/2017PPASS
DetailsAndy J. Long
Follow up to 9/13 to corrective actions:

- landscaping crews have finished work at site with landscaping along road shoulders complete and large common areas sodded and trees planted. All stockpiles and work that occured in road has been swept and clean.

- slopes and perimeter areas not landscaped have been hydroseeded

- wattles have been installed on disturbed slope between parcels and golf course

- channel above riprap has had hydroseeding and landscaping down uphill to slow and decrease runoff volumen and velocity.

- illicit washout on slope behind Bramere monument sign has been cleaned. Area has now been hydroseeded and wattles installed.

Site is in good condition and in compliance.

Conference9/7/20179/19/20179/18/2017ADONE
DetailsAndy J. Long
9:30 site meeting and walk through with RP and developer.
Conference9/13/20179/13/20179/13/2017ADONE
DetailsAndy J. Long
Walkthrough conference with RP and developer to discuss ESC installations and stabilization/vegetation schedule @ Highland Cove

WIP on Highland View entrance on landscaping. Once landscaping is complete, the DI bags installed on the old part of HV Drive may be removed since the new system is now installed and will have sediment protection.

Perimeter wattles have been installed around SFH parcels on the downhill sides to slow sheet flow and trap sediment. Plan is to make further adjustments after first 0.25" rain event..

Once landscaping (sod, tree/bush/shrub installations, ground cover) in common areas is complete, remaining slope areas not on building pads will be hydroseeded or have tacifier/BFM applied. Slopes are already tracked.

One area needing slope interupting wattles is above the east side of the golf course. 2 rows of wattles following contour shall be installed as well as hydroseeding in the area. A final wattle should be installed where the disturbed area meets the golf path.

Install velocity dissipating and sediment trapping sod strips in front of the rip rap lined run on collection channels at bottom of the cove. Uphill from this area more landscaping is to be installed and the cut slope north of this drainage will get wattles and hydroseed application.

Schedule for all landscaping and hydroseeding is for early to mid- October.

Correction request: clean up uncontained washout sprayed down hill at monument sign on Braemere. Washout provided across the street but was not used. This area needs further erosion controls on the slope in addition to wattle that is in place.
General Inspection9/6/20179/6/20179/6/2017APART
DetailsAndy J. Long
Common area landscaping in progress. No grading activity. Slopes with ECBs are in good condition, no significant hillside erosion observed.

Corrective actions needed:

- wattles installed on parcels are not fully trenched in per construction details.
- certain parcel side slopes are showing channel erosion where water is flowing off onto the slope. Need to regrade/repair these channels and install erosion and sediment controls in these areas.

- clean trapped sediment in gutters

Need to schedule onsite meeting with RP

VM left with Clayton
General Inspection8/24/20178/24/20178/25/2017 PASS
DetailsAndy J. Long
No significant hillside erosion issues or sediment blow outs after storm. BMPs installed are in good condition. Road is now paved and new DIs have sediment protection. Wattles have been installed around several parcels.

Next inspection check slopes on the first set of parcels on left side of HV Drive for additional wattle placement. Check on Sunset Peak rip rap channels.
General Inspection8/9/20178/9/20178/16/2017 CANC
DetailsAndy J. Long
General Inspection7/11/20177/25/20177/24/2017APASS
DetailsAndy J. Long
Landscaping in progress on common areas. No trackout, fugitive dust, or discharges/spills observed. Road is now paved, storm drains have sediment protection. ESC controls have been installed on individual lots. No correction requested.
General Inspection7/11/20177/11/20177/11/2017APASS
DetailsAndy J. Long
No fugitive dust, trackout, or discharges. Some crew on site working on utiliities and grading activities.

Wattles have been installed on perimeter of graded parcels. Will check in next inspection for stabilization plans of areas that do not have temporary or permanent stabilization implemented yet. No immediate corrections.
General Inspection6/23/20176/27/20176/27/2017APASS
DetailsMelissa Jannusch
Curb and gutters installed. The road is not paved yet. No DI protection currently. Revegetation phase ongoing. Vegetation is growing well. WIP on 8th street extension. No fugitive dust. Trash is contained. No corrections.
General Inspection6/20/20176/20/20176/23/2017 CANC
DetailsAndy J. Long
General Inspection6/5/20176/5/20176/5/2017 PASS
DetailsAndy J. Long
WIP on road grading and preparation for paving. Water truck on site for compaction and dust control. No fugtive dust observed at time of inspection.

Corrections from previous inspection have been resolved:
- asphalt pile has been removed.
- entrance to Braemera has been cleaned up. Gutter will connect to new gutter and all loose material should be removed.

Hillsides still vegetating. No rips or tears in erosion control matting or bare spots observed. Will continue to monitor
Complaint Inspection5/18/20175/19/20175/19/2017AFAIL
DetailsAndy J. Long
check out complaint regarding construction access off of Braemere

Corrections needed at entrance on Braemere:
- provide drainage route for water from Braemere to continue to flow to vegetated area. Remove stockpiles in gutter at end of paved street.
- provide timeline to remove asphalt stockpile

Corrections discussed with RP. Will complete corrections by end of next week.
General Inspection5/15/20175/15/20175/15/2017 PASS
DetailsAndy J. Long
Slope vegetation growing well through erosion control blankets. No erosion or slope failures observed. Preserved vegetation between graded area is in good condition. Will recommend potential to plant sage brush on slopes, currently appears to be mostly grasses.

No construction entrance rock at Highland View Drive but road has been swept regularly and both MS4 inlets have mantained filter bags installed. Minimal WIP on site by Knife River and Rock Placing Co.

No new corrections. Will inquire about revegetation project.
General Inspection4/21/20174/28/20175/4/2017APEND
DetailsAndy J. Long
General Inspection4/21/20174/21/20174/21/2017PPART
DetailsAndy J. Long
Heavy duty construction entrance has been removed and has not been replaced. Good amount of trackout to Highland View. No discharges or runoff occuring at time of inspection.

RP stated that entrance was removed because of a trenching project that is scheduled to occur soon. Current sweeper truck schedule is once per week. If no construction entrance can be installed, then prohibiting access or installing rumble bars or wheel brushing/washing station will be required.

Hillsides are vegetating well under ECB, no slope failure of significant rills observed.

Still working on vegetation plan proposal.



RP stated that entra
Tracking Control4/7/20174/11/20174/11/2017APASS
DetailsMelissa Jannusch
Sweeping underway at the time of the inspection.
General Inspection4/4/20174/6/20174/7/2017PFAIL
DetailsMelissa Jannusch
No sweeping has occurred. Maintenance has not been performed on construction entrance. Tracking control inspection scheduled for next week.
General Inspection4/4/20174/4/20174/4/2017 PEND
DetailsAndy J. Long
Slopes are in good condition with ECB and seeded grasses starting to grow. RP to provide seed mix details and ECB specs to analyze potential for some alternative revegetation tactics.

Correction request:
- conduct maintenance on rock construcction entrance on HV road
- change out DI bags on HV road.

Will check back this Thursday



Corr
General Inspection3/20/20173/20/20173/20/2017 PASS
DetailsMelissa Jannusch
The ECBs are providing adequate soil stabilization. Vegetation has begun to establish over much of the hillsides throughout the subdivision. The scour area on 8th street extension has been stabilized with ECBs there is some sediment deposited on the top of the ECBs.
Corrections: The Highlands Cover Rd. entrance needs to be sweep, the construction entrance needs maintenance, the DI bags need maintenance.
Tracking Control3/1/20173/3/20173/6/2017PCANC
DetailsAndy J. Long
General Inspection2/28/20172/28/20173/1/2017 PASS
DetailsAndy J. Long
No significant trackout from site. WIP within subdivsion area. No perimeter disturbance. Slopes with ECB appear to be in good condition. No repairs conducted along the inside curve of Sunset Peak road. No new corrections, will continue to monitor. Will conduct end of week follow up for trackout observed.
General Inspection2/10/20172/10/20172/10/2017PPASS
DetailsMelissa Jannusch
8th street extension ECB have been replaced and the rip rap channel has been raised to prevent water from cutting down the slope. It appears some water and sediment have overtopped the channel but the ECB are providing ample stabilization.
No correction requested.
General Inspection1/27/20171/27/20171/30/2017PPEND
DetailsAndy J. Long
RP notified ESC division on 1/27/2017 that corrections are in progress to address issues observed on 1/19 inspection.

Water running off Braemere to HV Drive is being to diverted away from slope leading down to incomplete disturbed area. The diversion will route water to sheet flow down the road and towards the sites sediment basin at bottom of hill.


Engineer is assessing design of water conveyance on the inside corner with further corrections to be implemented when conditions allow. Frozen & unstabile slopes currently.
General Inspection1/19/20171/23/20171/30/2017PCANC
DetailsAndy J. Long


General Inspection1/19/20171/19/20171/19/2017PPART
DetailsMelissa Jannusch
On 8th street extention the water drainage has cut in under the berm and is flowing over the ECBs depositing dirt on the ECBs. This water is then flowing Hulls Gulch ravine. Requst to have engineer review design and request corrective action.
On the West side of the site the water flowing from Baremere and highland view Dr. is being channeled by the wattles and creating rill erosion of the slope. Request review, maintenance, and possibly rerouting water.

Notified RP of the observations. RP to provide update of corrective actions to be implemented. Site currently under snow covered/frozen conditions with some active runoff.
General Inspection12/28/201612/28/20161/5/2017 CANC
DetailsAndy J. Long
snowy frozen conditions. to be inspected during snowmelt runoff
General Inspection12/13/201612/13/201612/20/2016 CANC
DetailsAndy J. Long
Random Inspection11/28/201611/28/201611/28/2016APASS
DetailsAndy J. Long
WIP installing hillside erosion controls (erosion control blanket, wattles) No muddy discharges, erosion rills, BMP failures observed after mix of rain & snow the night before.
General Inspection11/17/201611/17/201611/17/2016PPEND
DetailsAndy J. Long
WIP on installing hillside erosion controls, including slope intercepting wattles, horizontal tracking, hydromulch application, and erosion control blankets.

Wattles are staked down, but in some areas were not trenched in, potentially due to frozen ground or rough/steep terrain. Some tenting of the ECB is observable but it is staked down and should prevent raindrop erosion.

Construction entrance has been lengthened and sand bag sediment check dams installed to trap dirt on the side of the development.

Extensive amount of labor and materials utilized, will monitor performance during next precipitation to identify any issues.

Request to prohibit fence crew and ESC installation crew from driving on grass off Sunset Peak Rd.
Verbal request
General Inspection10/26/201610/28/201611/2/2016ACANC
DetailsAndy J. Long
General Inspection10/25/201610/25/201610/25/2016PPART
DetailsAndy J. Long
Rainfall inspection at Highlands Cove subdivsion. Inspected construction entrance and Sunset Peak drainage.

Corrections needed to prevent muddy discharge going to existing MS4 drains near entrance, the inlet filter bags are insufficient at the entrance on Highland View. Muddy runoff is mainly due to trackout and sides of culdesac. Need additional controls.

Corrections:
- sweep culdesac as conditions dry
- check length of construction entrance to make sure it is 50 ft or longer
- install check dams or alternative control to reduce amount of sediment in water that makes it to the drain

- retrack lower graded area below Sunset Peak. More wattles and/or silt fence could be necessary. Area is not yet hydroseeded or mulched. Addition rip rap should be considered.

Onsite inspection requested to address corrections & potential issues.

Other BMPs including hillside tracking, sediment control wattles , and drainage design to collect and retain storm water is working well.
Random Inspection10/14/201610/14/201610/14/2016PPASS
DetailsDaryl DeGrange
No trackout or sediment runoff
General Inspection10/6/201610/7/201610/7/2016APASS
DetailsAndy J. Long
WIP on rough grading at Highlands Cove. Future road route now graded from Highland View to Braemere. Site entrance and SWPPP information located on Highland View. Inpsections performed weekly by site RP and developer.

Dust control system and equipment is still on site and being utilized. No dust issues observed, no complaints received.

After rough grading, the plan is to hydroseed slopes areas in the last week of October.

No corrections at this time. Site ESC controls per plan are in effect. Approved.
General Inspection10/5/201610/5/201610/6/2016 CANC
DetailsAndy J. Long
General Inspection9/13/20169/13/20169/13/2016PPASS
DetailsAndy J. Long
Grading work is still occuring at Highlands Cove subdivision project. Dust control system is still installed and working well, no plumes observed. No complaints received since early August.

Sunset Peak/8th Street extension re-alignment has been complete. A new section of rip-rapped barrow ditches have been installed on both sides of road and should receive sheet flow from road and prevent water running down the pre-exisiting gully. Disturbed slopes around the new road area have been horizontally tracked and sediment control slope interupting wattles have been installed.

No corrections requested at this time, recommended to RP that an onsite inspection be conducted during first significant rain to check for any weaknesses in BMPs or discharge issues. May want to install silt fence section in the gully below the wattles on the inside of the road curve.
General Inspection8/24/20168/24/20168/24/2016PPASS
DetailsAndy J. Long
Mass grading and earth moving occuring. Large volume water wagon covering site with dust suppressant water. Water refill is via a large tank connected by hose to fire hydrant at end of Highland View Drive to keep the supply. All BMPs installed, RP informed me one section will be removed for re-surveying and installed before the end of the week.

No violations observed, no recent complaints. No corrections requested at this time.
General Inspection8/1/20168/11/20168/11/2016APASS
DetailsAndy J. Long
Initial grading and redistribution of fill is still in progress. No equipment activity at time of inspection; water truck staged on site as well as water tank now onsite to provide more frequent dust control and shorten distance of water truck travel.

No corrections requested at this time.
Complaint Inspection8/4/20168/4/20168/4/2016PPART
DetailsAndy J. Long
Dust complaint received.

1 water truck on site and two excavators were grubbing/rough grading and moving dirt from two locations within the Highlands Cove subdivision. Initial plans to have onsite water tank were not possible due to location of nearest hydrant.

While onsite the truck is effective at minimalizing the dust, however when filling up water it takes approximately 15-20 minutes - during which excavators continue to operate, making more significant amount of dust during that time and the appearance that there is no dust control at site.

Correction request issued to developer:

- Need to have two water trucks onsite that stagger their loads so that we can have a truck onsite and active while excavation is taking place. The alternative would be to cease excavation when the dust control water truck is filling up.

Site will be inactive tomorrow. Work will resume Saturday and the developer stated there should be two water trucks.

Site Preparation7/29/20168/1/20168/1/2016APASS
DetailsAndy J. Long
Clayton-please call 30 minutes prior to meet Phone #: ###-####

Walk through inspection of BMPs with Highlands Cove ESC/SWPPP team Clay, Charlie with Specialty Const, and Dave J..

Excavation/grading will conducted by Knife River (Mike Cole supervisor) and geotech testing by Strata.

Initial site actvity will be start at the end of existing Highland View Dr. Once the road is cut, trackout controls and entrance shall be installed. First receiving DIs on Highland View have sediment protection.

Silt fence has been installed properly in two sections as noted on the ESC site map. In between the two sections below the future subdivision is an existin earthen berm that will capture sheet flow through this area. Vegetation below road cut is to be preserved.

Two water tanks for the dust suppression and compaction needs will be placed in the staging area and auto fill through a metered hose from approved hydrants in the Highlands.

Will need to in need to inspect sediment and stormwater conveyance channel BMPs once Sunset Peak Road is relocated/rerouted to check how water will flow through the work are towards Hulls Gulch. Currently two dandy bag check dams have been installed in the gully that has formed from water running off Sunset Peak road.

Requested that trash dumpster be installed for workers during excavation phase to cut down on litter.

Approved for construction, excavation to begin tomorrow AM
General Inspection1/5/20171/9/2017 P 
DetailsAndy J. Long
check for snowmelt issues