Site Final | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Andy J. Long
|
|
|
All subdivision construction and infrastructure has been complete for nearly 2 years. Disturbed areas and slopes have revegetated beyond 80% coverage. No ESC corrections.
Boulder Heights phases #8-11 permitted seperately and will monitor temporary BMPs around Trent Point and Stone Ridge. See ESC19-00371
|
General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/27/2019 | 11/27/2019 | 11/27/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/12/2019 | 11/12/2019 | 11/13/2019 | | PASS |
Michael Zawacki
|
|
|
Both homes that were under construction are completed. No activity on any of the other lots.
|
General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/26/2019 | 9/26/2019 | 9/30/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity on upper section.
|
General Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 | | PASS |
Michael Zawacki
|
|
|
Both homes finished, no new construction activity.
|
General Inspection | 8/27/2019 | 8/27/2019 | 8/29/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/26/2019 | 7/26/2019 | 7/26/2019 | | PASS |
Michael Zawacki
|
|
|
No new building activity has begun in phase.
|
General Inspection | 7/11/2019 | 7/11/2019 | 7/12/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity at site.
|
General Inspection | 6/26/2019 | 6/26/2019 | 6/27/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/10/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Michael Zawacki
|
|
|
No new homes, all lots have good coverage.
|
General Inspection | 6/3/2019 | 6/3/2019 | 6/10/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | | PASS |
Michael Zawacki
|
|
|
Area clean, still only two homes under construction. New phase begun under seperate permit.
|
General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 | | PASS |
Michael Zawacki
|
|
|
No new lot or home activity. No new equipment staged at next phase.
|
General Inspection | 4/17/2019 | 4/17/2019 | 4/17/2019 | | PASS |
Michael Zawacki
|
|
|
No ESC issues. Still just two homes
|
General Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PART |
Michael Zawacki
|
|
|
Some trackout coming from end of Trent Point. JH in area. No new lot development.
|
General Inspection | 3/22/2019 | 3/22/2019 | 3/22/2019 | | PASS |
Michael Zawacki
|
|
|
Entrance trackout has been cleaned.
|
General Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 | | FAIL |
Michael Zawacki
|
|
|
Trackout leaving from Trent Pony & Stone Ridge. ACHD dump truck and sweepers have showed up at site.
|
General Inspection | 2/19/2019 | 2/19/2019 | 2/26/2019 | | PASS |
Michael Zawacki
|
|
|
Area is snow covered, no ESC issues.
|
General Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PART |
Michael Zawacki
|
|
|
Tracking at Trent Point & Stone Ridge, not sure if from off roaders or construction activity. No runoff from home sites, workers parked on road.
|
General Inspection | 1/22/2019 | 1/22/2019 | 1/23/2019 | P | FAIL |
Michael Zawacki
|
|
|
post rainfall inspection Trackout at Trent Point Way & Stone Ridge Way.
|
General Inspection | 1/17/2019 | 1/17/2019 | 1/17/2019 | | PASS |
Michael Zawacki
|
|
|
Upper area is clean. Haz-Tec drilling unloading horizontal borer at time of inspection.
|
General Inspection | 12/31/2018 | 12/31/2018 | 12/31/2018 | | PASS |
Michael Zawacki
|
|
|
Still two homes under construction. Site is stable, no aesc issues.
|
General Inspection | 12/14/2018 | 12/14/2018 | 12/14/2018 | | PASS |
Michael Zawacki
|
|
|
Area is still frozen. Lots of sand on roads, probably from plows. No new work on any of the lots.
|
General Inspection | 11/29/2018 | 11/29/2018 | 12/3/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/14/2018 | 11/14/2018 | 11/15/2018 | | PASS |
Michael Zawacki
|
|
|
Excavator parked at Trent Point & Stone ridge. 2 homes under construction. No ESC issues.
|
BMP Violation | 10/24/2018 | 10/30/2018 | 10/29/2018 | A | FAIL |
Michael Zawacki
|
|
|
Washout not cleaned.
|
General Inspection | 10/24/2018 | 10/24/2018 | 10/24/2018 | | FAIL |
Michael Zawacki
|
|
|
Lot on corner of Stone Ridge and Trent Point has lots of dumped washout. Development owner is aware, supposed to be cleaned by end of week.
|
General Inspection | 10/9/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Andy J. Long
|
|
|
rainfall inspection
No muddy runoff observed to streets and sidewalks. Gravel checks bags and inlet mats
Note: upper pond was not muddy, water running down the east Warm Springs Mesa drainage is muddy as it joins the slough and stormwater facilites at bottom of Hill and outleting to Walling Creek. This indicates significant erosion is occuring in the drainage. Will notify ACHD and Boise Public Works.
|
General Inspection | 10/3/2018 | 10/3/2018 | 10/3/2018 | | PASS |
Andy J. Long
|
|
|
Inspected 10/2 PM.
No new subdivision acivity. Dry weather conditions during inspection. No trackout, spills, or other issues observed. 2 SFHs in progress
|
General Inspection | 9/18/2018 | 9/18/2018 | 9/18/2018 | | PASS |
Michael Zawacki
|
|
|
Upper section stable and clean. No ESC issues, two homes under construction.
|
General Inspection | 9/3/2018 | 9/3/2018 | 9/5/2018 | | PASS |
Michael Zawacki
|
|
|
No ESC issues at phase
|
General Inspection | 8/17/2018 | 8/17/2018 | 8/17/2018 | | PART |
Andy J. Long
|
|
|
Need to begin clean up and stabilization or secure perimeter for sediment control on the staging area at east end of Trent Point.
No trackout, discharges, or dust occuring. Need to begin to prepare for wet weather in September.
|
General Inspection | 8/2/2018 | 8/2/2018 | 8/2/2018 | | PASS |
Michael Zawacki
|
|
|
2 homes under construction, both are clean and well contained. Phase is clean,BMPs still in place. No ESC issues.
|
General Inspection | 7/18/2018 | 7/18/2018 | 7/18/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on two homes. Neighborhood BMPs in place, no ESC issues. Unrelated work at pumphouse causing some trackout into neighborhood.
|
General Inspection | 7/3/2018 | 7/3/2018 | 7/3/2018 | | PASS |
Michael Zawacki
|
|
|
Neighborhood BMPs in place. Two homes under construction, both sites are contained. No issues at site.
|
General Inspection | 6/14/2018 | 6/14/2018 | 6/18/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Andy J. Long
|
|
|
No new activity. WIP on SFHs that have seperate ESC permits. No corrections requested at this time.
|
General Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PASS |
Michael Zawacki
|
|
|
No ESC issues on upper boulder heights. WIP on two homes.
|
Random Inspection | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | PART |
Andy J. Long
|
|
|
No hillside erosion or sediment runoff issues from open lots in subdivsion.
Correction request: - remove accumulated sand/gravel/sediment behind green check dam bags in gutter - replace coco-mats on all inlets in sub that need repair.
|
General Inspection | 5/7/2018 | 5/7/2018 | 5/9/2018 | | PASS |
Michael Zawacki
|
|
|
Two homes under construction in phase of development. Sites are clean. Storm cell moving through area during inspection, high winds were causing lots of dust to blow. Dust control will soon be needed as area becomes more dry.
|
General Inspection | 4/20/2018 | 4/20/2018 | 4/20/2018 | | PASS |
Michael Zawacki
|
|
|
Two active lots and an active storage/staging area. Site is free of issues.
|
General Inspection | 4/3/2018 | 4/5/2018 | 4/6/2018 | A | PASS |
Andy J. Long
|
|
|
Earthen berms and stockpiles have been placed where water was creating channel to stormwater pond/basin.
No new erosion issues on slopes, disturbed areas have revegetated, trackout, or other violations observed.
|
Conference | 3/29/2018 | 3/30/2018 | 4/3/2018 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 | | FAIL |
Michael Zawacki
|
|
|
Trackout coming from storage area at Stone ridge and Trent Point. Area needs to be blocked to keep vehicles from joy riding in mud. Rilling and a gulley forming taking sediment into settling pond. Inlets at Trent Point covered with sediment. Some sediment at inlet at Galaxy and Windsong, some sediment behind gravel check bags on Galaxy.
|
General Inspection | 3/13/2018 | 3/13/2018 | 3/14/2018 | | PART |
Michael Zawacki
|
|
|
Roads and gutters are in good shape and clean. Home on galaxy way made entrance across sidewalk. Sediment pond at bottom is clean.
|
General Inspection | 2/23/2018 | 2/26/2018 | 2/27/2018 | P | PASS |
Michael Zawacki
|
|
|
Staging and storage area is frozen, no dirt coming out. Excavation on home site is on hold for weather. Neighborhood BMPs still in place. No issues at this time.
|
General Inspection | 2/21/2018 | 2/22/2018 | 2/23/2018 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/20/2018 | 2/20/2018 | 2/21/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/5/2018 | 2/5/2018 | 2/6/2018 | | PART |
Michael Zawacki
|
|
|
Lots of trackout coming from storage area on corner of Trent Point & Stone Ridge
|
General Inspection | 1/19/2018 | 1/19/2018 | 1/22/2018 | P | PEND |
Andy J. Long
|
|
|
post rainfall inspection
No new erosion or sediment runoff areas observed after recent rain.
No work or BMPs have been implemented at end of Trent Point above new pond yet as discussed.
Request for slope runoff intercepting berm and/or silt fence
|
Conference | 1/12/2018 | 1/12/2018 | 1/12/2018 | P | PASS |
Andy J. Long
|
|
|
No new erosion issues, slopes are well vegetated. RP on site daily. Gutters on slopes have snake-bag check dams to slow flow of water and trap sediment. Basin DIs have filter mats throughout, drains on slope do not.
Correctiive action discussed with RP Eric: - install slope interupting berm or BMPs above the new stormwater pond at east end of Trent. He said equipment will be onsite next week and he will have it done weather permitting.
|
General Inspection | 1/5/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Michael Zawacki
|
|
|
Neighborhood BMPs in place. Central on site to begin grading for first house in sub.
|
General Inspection | 1/4/2018 | 1/4/2018 | 1/5/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 12/20/2017 | 12/20/2017 | 12/20/2017 | | PASS |
Michael Zawacki
|
|
|
BMPs still in place. No homesite work has begun. Ground is snow covered.
|
General Inspection | 12/5/2017 | 12/5/2017 | 12/5/2017 | | PART |
Michael Zawacki
|
|
|
No building yet. Site is stable and BMPs are in place. Some trackout from random offroad activity. Site at bottom of trent point way is being used as a dumping ground for rocks and wood debris.
|
General Inspection | 11/17/2017 | 11/20/2017 | 11/20/2017 | A | PEND |
Michael Zawacki
|
|
|
No new construction or disturbance. People have been driving into stock pile area and tracking out. No slope protection installed above pond.
|
General Inspection | 11/16/2017 | 11/16/2017 | 11/17/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/31/2017 | 11/1/2017 | 11/2/2017 | A | PEND |
Andy J. Long
|
|
|
No new subdivision activity. Slopes are vegetatated, permanent stormwater facilities are installed and operational.
Need to address stockpiles east of Trent and to install erosion controls on slope above the new stormwater basin below Trent Point.
|
General Inspection | 10/25/2017 | 10/25/2017 | 10/31/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/10/2017 | 10/10/2017 | 10/11/2017 | | PASS |
Michael Zawacki
|
|
|
Inspected 10-9-17. No new disturbances. Vegetation has grown in on vacant lots. Some blocksom has been removed from DIs, will need to be replaced before new ground disturbance. Will need site inspection and BMPs before any ground disturbing activities begin.
|
General Inspection | 9/25/2017 | 9/25/2017 | 9/28/2017 | | PASS |
Andy J. Long
|
|
|
No new activity. No corrections at this time.
|
General Inspection | 9/8/2017 | 9/8/2017 | 9/8/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/18/2017 | 8/24/2017 | 8/25/2017 | A | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/14/2017 | 8/16/2017 | 8/18/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/11/2017 | 8/11/2017 | 8/14/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/27/2017 | 7/27/2017 | 7/27/2017 | | CANC |
Andy J. Long
|
|
|
|
Conference | 6/27/2017 | 7/12/2017 | 7/13/2017 | P | PEND |
Andy J. Long
|
|
|
No activity. No new corrections. RP stated they are lookig to have the high grass that revegetated mowed to reduce fire risk.
|
General Inspection | 6/27/2017 | 6/27/2017 | 6/27/2017 | | PEND |
Andy J. Long
|
|
|
No recent construction activity. Vegetation on slopes has established well, will still need to address some area that have rills visible. Can look to divert water, resurface and install slope intercepting wattles. NO trackout, discharges, or dust.
Still need to address stockpiles at the east end of Trent Point and install some sediment controls on the slope above the retention pond that has rills and a large gully that developed on the surface above the piped slope drain.
No immediate corrections, will set up conference with RP.
|
General Inspection | 6/12/2017 | 6/12/2017 | 6/12/2017 | A | PASS |
Melissa Jannusch
|
|
|
Stormwater basin. Wattles have been removed. Some of the banks have been re-graded and re-tracked. The bottom has been re-graded and re-tracked. There is still a rill on the North bank. Revegetation occurring on the rest of the site. Some rills remaining on East slopes of the site.
|
General Inspection | 6/1/2017 | 6/1/2017 | 6/2/2017 | | PEND |
Andy J. Long
|
|
|
No new subdivision activity. All upper roads, sidewalks and gutters are free of loose dirt and sediment. Disturbed areas have revegetated well.
Corrections still in progress: - increase sediment control on long gentle slope above Trent Point. Will also request Suez Water to complete access road to water tank and adjacent area - need to address erosion rills above the east stormwater pond and below the stockpile. Stockpile has started to vegetate with volunteer plants but needs perimeter sediment control on downslope side.
|
General Inspection | 5/17/2017 | 5/17/2017 | 5/17/2017 | A | PASS |
Melissa Jannusch
|
|
|
No issues after the rain storm. No corrections.
|
General Inspection | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PEND |
Melissa Jannusch
|
|
|
Vegetation has stabilized a majority of the slopes. The stock pile needs containment. Some sediment moving off site. Some rills still present on site. The DI protection needs to be replaced.
|
General Inspection | 4/19/2017 | 4/19/2017 | 4/21/2017 | P | PEND |
Andy J. Long
|
|
|
New wattle installed along Trent Point across from Boulder Heights Drive. No new runoff areas or sediment blow outs observed. WIP on correcting rills on hillsides.
Correction needed: erosion BMPs required on slope above the new stormwater pond and sediment & dust controil for the large stockpile.
Corrections ongoing.
|
General Inspection | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PEND |
Melissa Jannusch
|
|
|
Large rill adjacent to drainage channel has been filled. Trench has been dug along top of slope to channel water into the drainage channel. Sediment runoff onto sidewalk still occurring.
|
General Inspection | 3/27/2017 | 3/27/2017 | 3/27/2017 | | PEND |
Melissa Jannusch
|
|
|
No new large issues. No new progress on repairing slopes. Sediment build up near DIs. Dandy bags are being used as DI protection. Some vegetation is beginning to grow.
|
General Inspection | 3/10/2017 | 3/10/2017 | 3/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/21/2017 | 2/23/2017 | 2/24/2017 | A | PEND |
Melissa Jannusch
|
|
|
Trackout has been reduced. Dandy bags placed in problem areas. Rill erosion still present. No new areas of erosion.
|
Site Preparation | 2/15/2017 | 2/21/2017 | 2/21/2017 | P | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 2/8/2017 | 2/15/2017 | 2/15/2017 | P | PEND |
Melissa Jannusch
|
|
|
WIP on cleaning the muddy discharge.
|
General Inspection | 2/6/2017 | 2/6/2017 | 2/8/2017 | | PEND |
Melissa Jannusch
|
|
|
RP addressing rill and sediment runoff from the site. They are using dandy bags to protect inlets. Planning to clean DIs. Eric (RP) is aware of erosion problems and will making a plan of action moving forward to stabilize the slopes. He is currently working to remove sediment from the sidewalks and streets. Will follow up next week with additional corrections.
|
General Inspection | 1/5/2017 | 1/5/2017 | 1/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/21/2016 | 12/21/2016 | 12/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/5/2016 | 12/6/2016 | 12/9/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/5/2016 | 12/5/2016 | 12/5/2016 | | PEND |
Andy J. Long
|
|
|
discharge reported by neighbors, investigation in progress. Appears may have been a fire flow activity.
Corrections: - clean up inlet on Boulder Heights drive at bottom of hill - schedule conference to discuss stockpile permitting and ESC controls. - sweep up trackout on Trent Point
|
Complaint Inspection | 11/18/2016 | 11/18/2016 | 11/18/2016 | A | PEND |
Andy J. Long
|
|
|
Report of muddy water discharge from water line and utility work flowing to storm drains
Water from trench was discharged to street without treatmnet. RP was alerted and instructed water to be directed to the new pond.
Corrections: - clean up aroun inlet on Boulder Heights where mud has accumulated. - sweep all streets and gutters around Trent Point entrance and work area. - log corrective action report in SWPPP
|
General Inspection | 11/18/2016 | 11/18/2016 | 11/18/2016 | | CANC |
Andy J. Long
|
|
|
duplicate inspection
|
General Inspection | 11/3/2016 | 11/3/2016 | 11/8/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Road work and utility project occuring. Sweeper unit on site for daily cleaning.
Roads have not yet been paved and storm drains connected but road base and curbing installed. Hillsides tracked and scheduled for hydroseeding this month per RP.
Will continue to monitor area weekly during BH inspections.
|
General Inspection | 10/18/2016 | 10/18/2016 | 10/18/2016 | A | PART |
Andy J. Long
|
|
|
hillside development rainfall inspection.
Entrance at Windsong and Galactic in good condition. Runoff for upper site is retained on site and BMPs installed at outlet.
Only muddy runoff source is at the east Trent Point entrance. Disturbed area from concrete washout installation, muddy equipment, and some trackout causing turbid discharge. Downstream inlet at bottom of hill does not have filter bag or mat due to location at low point and private driveway access & flooding issues.
Verbal correction to RP to clean up entrance better, install wattles on upper side of street and clean out accumulated materials in check dams.
RP on site and will work on clean up and installing perimeter controls around washout to prepare/ make corrective actions for next rainfall.
|
General Inspection | 10/11/2016 | 10/14/2016 | 10/14/2016 | P | PEND |
Andy J. Long
|
|
|
RP working on site today to check inlet filters immediately around the disturbed areas. Some linear road work is in progress with unpaved areas exposted. Sediment control check dams have been placed at entrances.
RP concerned about run-on from fire damaged areas and has dug diversion around graded area .
Will inspect early next week after rainfall to check conditions.
|
General Inspection | 10/6/2016 | 10/11/2016 | 10/11/2016 | A | PEND |
Andy J. Long
|
|
|
Significant activity and linear construction on surrounding roadways. Regular sweeping has occured to deal with trackout and loose dirt. Receiving storm drains have sediment protection. Will need to focus on perimeter controls if rainfall forecasted at end of week materializes.
|
General Inspection | 10/4/2016 | 10/5/2016 | 10/6/2016 | P | PEND |
Andy J. Long
|
|
|
Active work on preparation to pave road. No hills controls installed at this time but crews rushing to finish paving and connection to storm water infrastructure.
Verbal correction request to sweep entrances at Trent Point and Windsong. RP out of town, follow up inspeciton scheduled for early next week.
|
General Inspection | 10/4/2016 | 10/4/2016 | 10/4/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 9/19/2016 | 9/19/2016 | 9/21/2016 | | PART |
Andy J. Long
|
|
|
WIP on connecting to exisiting water lines, some road entrances are currently torn up. Need to conduct street sweeping once work is complete. Site is in process of trying to finish roads and stormwater infrastructure before Fall weather/precipitation.
|
Tracking Control | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | CANC |
Evan Jenkins
|
|
|
same inspection already been taken care of. Duplicate inspection
|
Tracking Control | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | CANC |
Andy J. Long
|
|
|
duplicate inspection
|
Tracking Control | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PART |
Andy J. Long
|
|
|
Need to perform clean up of trackout. Inspection/conference scheduled for monday. No discharrges, no fugitive dust observed. Working on install sewer and infrastructure.
|
General Inspection | 8/25/2016 | 8/25/2016 | 8/25/2016 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 8/8/2016 | 8/8/2016 | 8/8/2016 | A | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. Crews in process of install permanent stormwater infrastructure. Streets will be swept this week per RP, some trackout at both entrances.
Subdivision still on schdule to have roads and grading complete before fall/winter precipitation.
|
General Inspection | 7/8/2016 | 7/8/2016 | 7/11/2016 | P | PASS |
Andy J. Long
|
|
|
Need to clean up some areas of trackout at both entrances to subdivision. Need to provide plan for temp stabilization/sediment controls once grading is complete.
No fugitive dust, no discharges. Permit and SWPPP info on site.
|
General Inspection | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on subdivision grading and earthwork. No trackout from staging area and entrance. RP onsite. No fugitve dust issues. Reminder to add extra 1 acre for stormwater retention pond added to project area.
|
Complaint Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 | P | PEND |
Andy J. Long
|
|
|
Complaint regarding grading limits:
- Developer working in future area of stormwater retention pond for BH #7 - approximately 1 acre of disturbance, permitted for 8.5 acres with Boise. - water truck onsite for dust control as needed. No significant dust existing project area - No BMP failures observed. Construction entrance and sediment controls working well. Site inspection form are located in SWPPP box and up to date - Sediment control BMPs installed at bottom of new excavated area in question
Investigating if this 1 acre is part of the 8.5 for project.
Correction request:
- update site map in SWPPP folder and show BMPs installed.
|
General Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 | P | PART |
Evan Jenkins
|
|
|
Sweep up curb and gutter and sidewalk
|
General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Andy J. Long
|
|
|
Rough grading and grubbing are in progress. Staging area and construction entrance are in good condition with no trackout. No fugitive dust issues observed. Vegetation around perimeter has been preserved as a buff.
No corrections at this time, permit posted and SWPPP onsite.
|
General Inspection | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | PASS |
Andy J. Long
|
|
|
Initial rough grading and road cutting has started on new phase of Boulder Heights. Permit sign posted at the staging area located at east end of Trent Point. Trackout and sediment controls installed at entrance area. No access to site off Windsong. Approved for construcction. Will check for perimeter control needs once the distrubed area footprint is established.
|
Conference | 3/22/2016 | 3/22/2016 | 3/22/2016 | A | PASS |
Andy J. Long
|
|
|
10 AM pre-construction conference
Conference with developer JH, operator Central Paving, engineer, COB PW Hillside Engineers, & MTI inspector.
Staging area will be installed off Trent Point in flat area at east end of development. Rock construction entrance and perimeter silt fence to be installed this week as equipment is brought on site. Area will be used for parking, equipment fueling, and stockpiling. DIs down from entrance will need sediment filter bags. RP Eric to call when these initial BMPs are installed.
Rough grading to begin next week or early April. A temporary drainage basin/diversion trench will direct run-on to the existing drainage swale and BH#6 ponds.
Large rock stockpiles will be stored temporarily onsite. Oversize rocks to be broken down.
Plan is to have pipe and streets installed. Work allowed Mon-Sat 7 am- 7pm
Temporary stabilization and perimter sediment controls will be required for period after grading and road installation is completed and they hydroseeding to occur in November.
SWPPP onsite, designated inspector is Eric who will do inspections weekly. Approved.
|
General Inspection | 3/7/2019 | 3/7/2019 | | P | |
Andy J. Long
|
|
|
|
General Inspection | 1/20/2017 | 1/20/2017 | | | |
Melissa Jannusch
|
|
|
|