Permit Information
Permit NumberESC14-01083
StatusFinaled
Name ZACHARY MEYERS
Site Address 3301 E BARBER VALLEY DR
Project NameBARBER VALLEY TOWNHOMES #1
Customer Number 
ePlanReviewNo
Description
For Barber Valley Townhomes Phase 1: Marian Williams Park. Dewatering will Occur for approximately 6 weeks in duration.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/10/20189/10/20189/10/2018PPASS
DetailsAndy J. Long
All streets and gutters have been swept clean. Debris captured by flaps of storm drian bags & grates has been removed. All temporary storm drain protection has been removed. All areas disturbed are now stabilized and landscaped.
Phase 1 & 2 of Park Place Townhomes are complete, this ESC permit finaled. Stockpile to the west of site is covered by ESC16-01650.

Site Final9/5/20189/5/20189/10/2018PCANC
DetailsAndy J. Long
Site Final8/27/20188/27/20188/27/2018PNR
DetailsAndy J. Long
All townhome construction is complete. Allcommon areas are landscaped and stabilized.
Some minor landscaping stockpiles and materials are on Sire need to be removed and area cleaned.

Corrections needed to get Site Final approval:
- manaully sweep gutters on either sides of storm drains in phase 3 to capure dirt and debris around drain.
- remove DI bags left in inlets in phase 3
- sweep streets as needed

RP to notify for inspection upon completion of corrections.
General Inspection8/24/20188/24/20188/24/2018 PASS
DetailsAndy J. Long
General Inspection8/9/20188/9/20188/9/2018 CANC
DetailsAndy J. Long
General Inspection7/25/20187/25/20187/25/2018 PASS
DetailsMichael Zawacki
Landscapers in courtyard installing sprinklers and prepping top soil. Some rocks stored on street.
General Inspection7/6/20187/10/20187/11/2018ACANC
DetailsAndy J. Long
General Inspection7/5/20187/5/20187/6/2018 CANC
DetailsAndy J. Long
rescheduled
General Inspection6/20/20186/20/20186/20/2018 PASS
DetailsAndy J. Long
General Inspection6/5/20186/5/20186/8/2018 PASS
DetailsAndy J. Long
Phase II near completion. BMPs installed. No trash issues observed.
General Inspection5/21/20185/21/20185/23/2018PPASS
DetailsAndy J. Long
Trash behind stockpile west of site and in vegetated swale has been picked up. No new corrections requested
BMP Violation5/14/20185/16/20185/21/2018APEND
DetailsAndy J. Long
trash behind stockpile?
General Inspection5/10/20185/15/20185/14/2018AFAIL
DetailsAndy J. Long
Trash still not picked up in the vegetated swale SW of phase 3 and behind the large stockpile on adjacent lot.

3rd request issued to have trash crew patrol this area. Will reinspect Wednesday 5/16 and issue investigation fees if no compliance.
BMP Violation5/10/20185/10/20185/10/2018PPART
DetailsAndy J. Long
Trash along Barber Valley Dr. on south side of road has been picked up as requested.

No pickup conducted in vegetated swale area SW of phase 3 as requested. Showed RP where the trash was and stated he will have trash crew pickup today.

Trash crew (2 workers, 1 full time, 1 part time ) covers Park Place each day and also picks up in River Heights.
General Inspection5/4/20185/4/20185/4/2018 PASS
DetailsAndy J. Long
General Inspection4/19/20184/19/20184/19/2018 PART
DetailsMichael Zawacki
Phase 1 nearly complete. Area inside of courtyard is really dirty.
General Inspection4/4/20184/4/20184/5/2018 PASS
DetailsAndy J. Long
WIP on final block. Framing complete, center open area not yet landscaped. DI bags still install on stormdrains. Trash has been picked up around site and in the adjacent stockpile area.

No violations observed.
General Inspection3/20/20183/20/20183/20/2018PFAIL
DetailsAndy J. Long
Significant amount trash along Barber Valley drive and open stockpile staging area to the west of the active phase.

Correction request to Braxton to have trash crew do a thourough pick up around the stockpiles, road/sidewalk, and drainage swale bordering the site.
General Inspection3/14/20183/14/20183/14/2018 PART
DetailsMichael Zawacki
Area inspected 3-12
General Inspection2/27/20182/27/20182/27/2018 PART
DetailsMichael Zawacki
Site is clean. Someone is driving over sidewalk and starting a garbage pile in staging area. Currently is frozen and no issue with trackout but will become a problem when ground thaws.
General Inspection2/12/20182/12/20182/15/2018 PASS
DetailsMichael Zawacki
Site clean. No trash along perimeter. Work area is muddy, should be ok as long as no one parks on it. Workers currently parking on street.
General Inspection1/22/20181/26/20181/30/2018ACANC
DetailsAndy J. Long
General Inspection1/22/20181/22/20181/22/2018 PEND
DetailsAndy J. Long
No trackout or discharges.

Correction request to conduct general perimeter trash pick up around Barber Valley townhomes phases and plastic sheeting within south side staging area. Will conduct walk through at end of week.
General Inspection1/5/20181/5/20181/5/2018 PASS
DetailsAndy J. Long
WIP on final units on west end of phase. No trackout, discharge, or uncontained trash. Concrete washout located to west of project, also used for new phase across the street. No corrections requested.
General Inspection12/21/201712/21/201712/21/2017 PASS
DetailsMichael Zawacki
WIP Vertical construction. Final area of phase.
General Inspection12/6/201712/6/201712/6/2017 PASS
DetailsMichael Zawacki
WIP. Site clean. No issues.
General Inspection11/21/201711/21/201711/22/2017 PASS
DetailsMichael Zawacki
Vertical construction in progress. Framers are using boxes for trash. DIs clean and in good condition.
General Inspection11/6/201711/6/201711/6/2017PPASS
DetailsMichael Zawacki
WIP on townhome. Site contained. No recent foundations or ground disturbance.
General Inspection10/30/201710/30/201710/30/2017 PASS
DetailsMichael Zawacki
No new ground disturbance. WIP on townhome, building materials stores on site. No trackoput or dust, Dis in place. Currently no concrete or stucco work.
General Inspection10/13/201710/13/201710/16/2017 PASS
DetailsMichael Zawacki
No new ground disturbing activities.
General Inspection9/28/20179/28/20179/28/2017 PASS
DetailsAndy J. Long
WIP on east end central block. Perimeter landscaping & stabilization for project is complete.

Trash is contained, no trackout from site to Barber Valley, storm drains have sediment protection. No fugitive dust observed. Approved.
General Inspection9/13/20179/13/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection8/29/20178/29/20178/30/2017 PASS
DetailsAndy J. Long
General Inspection8/14/20178/14/20178/18/2017 CANC
DetailsAndy J. Long
General Inspection7/28/20177/28/20177/28/2017 CANC
DetailsAndy J. Long
General Inspection7/13/20177/13/20177/13/2017 PASS
DetailsAndy J. Long
WIP on west end of subdivision. STormdrains have sediment bags installed. Okay to remove DI bags east of Mare Street. Concrete washout facility provided. Trash and materials are contained. Approved.
General Inspection6/28/20176/28/20176/28/2017 PASS
DetailsMelissa Jannusch
Next section of townhomes has begun. No trackout, trash is contained. No ESC issues observed.
General Inspection6/13/20176/13/20176/13/2017 CANC
DetailsAndy J. Long
General Inspection5/29/20175/29/20175/30/2017 PASS
DetailsAndy J. Long
WIP on landscaping. No trackout, dischages to BV Drive, no fugitive dust issues. Approved.
General Inspection5/12/20175/12/20175/12/2017 PART
DetailsMelissa Jannusch
Trash bins need to be emptied.
General Inspection4/27/20174/27/20174/28/2017 PASS
DetailsMelissa Jannusch
WIP on interior and exterior of town homes. Many of the town homes are complete. Some trash around active areas of the site.
General Inspection4/12/20174/12/20174/12/2017 CANC
DetailsMelissa Jannusch
General Inspection3/28/20173/28/20173/28/2017 PASS
DetailsMelissa Jannusch
DI bags ok. No trackout. Project is clean. No corrections requested.
General Inspection3/13/20173/13/20173/13/2017 PASS
DetailsMelissa Jannusch
WIP. No ESC issues observed.
General Inspection2/24/20172/24/20172/24/2017 PASS
DetailsMelissa Jannusch
No corrections requested
General Inspection2/9/20172/9/20172/9/2017 CANC
DetailsAndy J. Long
General Inspection1/25/20171/25/20171/31/2017 PASS
DetailsMelissa Jannusch
SWPPP available. Sign posted. Trash contained. Good housekeeping practices. No discharges. No track out. Concrete washout area being used and is not too full. Staging area is clean. No corrections.
General Inspection1/10/20171/10/20171/11/2017 PASS
DetailsAndy J. Long
General Inspection12/26/201612/26/201612/29/2016 PASS
DetailsAndy J. Long
Trash and materials constained. Framing and foundation work in progress. Concrete washout facility in use. No trackout or discharges. Access lanes are still snow covered and frozen
General Inspection12/9/201612/9/201612/9/2016 CANC
DetailsAndy J. Long
General Inspection11/24/201611/24/201611/25/2016 PART
DetailsAndy J. Long
WIP at Park Place. Inlets protected, trash contained. No trackout or discharges observed.

Correction needed:

- stilll need to clean up and improve signage at concrete washout area to prevent uncontained dumping.
Conference11/9/201611/9/201611/9/2016PDONE
DetailsAndy J. Long
ESC walk-through inspection and compliance conference for construction activities related to Park Place and future construction and site improvement along both sides of Barber Valley Drive.

New permit application to cover construction activities in area that are currently not part of active permits. This new permit will inlcude the employee parking area for the Arboretum project, staging area for Brighton Homes excavated dirt and rock stockpiles, and the concrete washout and landscaping material stockpile area for Park Place

Corrections to be completed:
- install sediment control wattle along the Walling Creek walking path and sloped area disturbed by irrigation line project
- clean up uncontained washout next to the washout pan facility . Increase frequency of service calls to prevent overflowing and dumping. Post signs for no dumping etc.

New permit application to be submitted next week for review.
Random Inspection11/4/201611/4/201611/4/2016PPART
DetailsAndy J. Long
construction activity (staging, irrigation line trenching, employee parking) occuring on area not covered under existing ESC permits.

Correction request to provide new ESC plan and get permit for construction activities along Barber Valley Drive.
General Inspection10/28/201610/28/201610/28/2016 PASS
DetailsAndy J. Long
WIP on finishing lanscaping within the completed central phase as well as foundation and frames on the west end of project.

No trackout to Barber Valley, employee parking on pavement provided. Adequate trash containment. BMPs include designated washout facility and sediment filter bags on Park Place storm drains.

Trash picked up along swale as requested.
General Inspection10/13/201610/13/201610/13/2016PPART
DetailsAndy J. Long
All storm drains fitted with undamaged sediment filter bags. Trash containers provided for materials. Landsaping in progress and not stockpiling on impervious surfaces

Correction request to Erbie and Brighton Corp.
- need to have crew pick up all litter and debris along the back path of units by the swale in MAW Park. Lots of litter and chunks of material in grass and swale.

- Clean up loose dust and debris on Homestretch and Front Runner
General Inspection9/30/20169/30/20169/30/2016 PASS
DetailsAndy J. Long
General Inspection9/15/20169/15/20169/15/2016 CANC
DetailsAndy J. Long
General Inspection8/31/20168/31/20168/31/2016 PART
DetailsAndy J. Long
Park Place sub in progress. No development or infrastructure work remaining. Onsite inlets have filter bags installed. Individual units are permitted/inspected seperately. No trackout or fugitive dust. Large portable washout for cement trucks is located across the BV Drive.

RP for Brighton Homes to build a new onsite liquid washout for wall-board and paint. I also requested these sub-contractors be warned about washing out on driveways and gutters.

Correction issued to Brighton Homes regarding wall board material being washed out in gutter near stormdrain. Inlet bag to be replaced, material swept up, and training with culprit performed.
General Inspection8/16/20168/16/20168/16/2016 PASS
DetailsAndy J. Long
BMPs installed and maintained. No violations observed. WIP on townhomes.
General Inspection8/1/20168/1/20168/1/2016 PASS
DetailsAndy J. Long
General Inspection7/15/20167/15/20167/15/2016 PASS
DetailsEvan Jenkins
work in progress.
No ESC issues observed
General Inspection6/30/20166/30/20166/30/2016 PASS
DetailsAndy J. Long
WIP. BMPs installed. Will schedule site final and Brighton Homes to assume control of BMP maintenance. Already have individual permits for townhomes. No corrections at this time.
General Inspection6/15/20166/15/20166/15/2016 PASS
DetailsAndy J. Long
WIP on townhomes. New phase roads now paved. No fugitive dust, trash or material wrappings, or non-stormwater discharges leaving site. No corrections issued at this time.
General Inspection5/31/20165/31/20165/31/2016 PASS
DetailsAndy J. Long
General Inspection5/16/20165/16/20165/16/2016 PASS
DetailsAndy J. Long
WIP on townhomes at Park Place. All inlets inside and on Barber Valley Dr. have sediment filter bags that are being monitored and maintained. Trash and materials is contained properly on site. No spills, runoff, or loose sediment in streets and gutters.

New phase under constructiion is not occuring at this time and the roads are not yet installed.
General Inspection4/29/20164/29/20164/29/2016 PASS
DetailsAndy J. Long
BMPs installed. No discharges or trackout. RP on site keeping crews clean. No corrections issued.
Conference4/14/20164/14/20164/14/2016PPASS
DetailsAndy J. Long
Review of dewatering plan implementation and continuation of the Barber Valley townhomes subdivision.

Dewatering by one pump to connect to exsiting sewer is occuring. Water flows into conveyance trench approx. 120 meters into a serious of 3 lined settling ponds. The system can overflow to a bermed flat area to the west of site. If it does not infiltrate the water will pass through some vegetation and straw wattle to reach the swale in the park.

Set up looks good, Brown Construction is monitoring flows. Plan approved by ESC divsion office and associated fees were paid.
General Inspection4/11/20164/11/20164/11/2016 PASS
DetailsAndy J. Long
WIP. New block of BV Townhomes is in process of starting, heavy equipment now on site.

Dewatering plan submitted and approved, not yet installed. Will let RP Zach know to notify ESC division when the plan is set up and ready for discharge at site.

Framing work occuring on fist phase townhomes. Brighton Homes RP Kyle is in control of supervising daily cleanup. No corrections or issues at this time.
General Inspection3/25/20163/25/20163/25/2016 PASS
DetailsAndy J. Long
BMPs installed. No trackout or discharges from subdvision. Streets within townhome area will need street sweeping next week.
General Inspection3/10/20163/10/20163/10/2016PPART
DetailsAndy J. Long
Subcontractor crane leaked significant amount of fluid (hydraulic oil?) on Blue Ribbon.

Requested that soil spread around spill area be swept immediately and disposed of properly to not mix with the storm water from today's afternoon precipitaion.

Both Brighton Corp. & Brighton Homes are working on case. Kyle stated he will give crane operator a warning to bring spill prtection and cleanup materials. Company is AM Crane, which I was unable to contact.
General Inspection3/1/20163/1/20163/1/2016 PASS
DetailsAndy J. Long
BMPs installed and in good condition. No trackout or discharges from site. No corrections at this time.
General Inspection2/15/20162/15/20162/16/2016 CANC
DetailsAndy J. Long
General Inspection1/29/20161/29/20161/29/2016PFAIL
DetailsAndy J. Long
Corrections needed at site:

- need to empty overflowing trash bins
- need to check DI's on Thoroughbred because stormwater is overflowing the filter bags rather than flowing through.
- concrete washout was repaired poorly. Need to secure visqueen leak proof barrier and dispose of the trash and chemical barrels.
- material loader leaking oil and mixing with stormwater causing sheen. Need to check vehicles for leaks frequently and have spill absorbent on site.

Corrections issued to new Brighton Homes supervisor Kyle ###-####
General Inspection1/22/20161/22/20161/22/2016PPART
DetailsAndy J. Long
Stormwater inlets have filter bags installed, trash and material containers are provided, no trackout or discharges observed.

Correction needed - new washout bin at west end of Thoroughbred does not have a liner so that is out of compliance with SWPPP to have "leak-proof" container. Washout just runs under the boards.

Need to clean up and install proper washout facility.

Request put into Brighton Homes as well
General Inspection1/20/20161/20/20161/20/2016 PASS
DetailsAndy J. Long
General Inspection1/5/20161/5/20161/5/2016 PASS
DetailsAndy J. Long
WIP on townhomes. DI bags installed, site perimeter of wattles and fencing is keeping sediment and debris from entering swale. Trash is contained, streets are relatively clean considering the activity.

New round of townhomes with seperate ESC about to begin, RP for Brighton Homes issued correction to provide new concrete washout and have site meeting with workers (stucco guys with bobcat tractors) to prevent trackout as site thaws.
General Inspection12/21/201512/21/201512/21/2015 PASS
DetailsAndy J. Long
WIP on townhomes. Runoff to DIs is clear. Trash contained. No trackout or prohibited discharges offsite observed.
General Inspection12/3/201512/4/201512/4/2015APASS
DetailsEvan Jenkins
WIP of multiple SFH's. No trackout of debris observed.
General Inspection12/3/201512/3/201512/3/2015 CANC
DetailsAndy J. Long
rescheduled for 12/4
General Inspection11/18/201511/18/201511/18/2015PPASS
DetailsAndy J. Long
Street sweeping and housekeeping was conducted and has improved since issuing correction to sweep up cement/stucco fines in gutters as well pick up/contain litter & material wrappings on 11/12.

Brighton Homes and Brighton Co. responded to correction. No new violations, no corrections. WIP on townhomes and housekeeping sweeping should occur at end of each day.
General Inspection11/12/201511/12/201511/12/2015 PART
DetailsAndy J. Long
No trackout or discharges offsite. Site perimeter fence is containing windblown litter and controlling access. All stormdrains and sediment bag inlets installed.

Correction:
- house keeping around site should improve. Trash containers are provided but there is lots of litter around townhomes and in the gutter. Significant amounts of stucco material and washout in gutter and street as well as sawdust, both are potential polluntants when mixed with stormwater and drain the stormwater system. Site needs regular broom sweeping to control accumulations.

Will also discuss with Brighton Homes RP
Complaint Inspection10/28/201510/28/201510/28/2015APASS
DetailsEvan Jenkins
Fuel Spill Complaint

*** Visited the site where complaintee stated he could smell fuels. I seen no evidence of a spill or illicit discharge of any kind. I contacted Daniel with Brighton and Erby and both are un-awhere of a spill. I believe it to have been irrigation water from watering the lawns. I did not detect any fuel smells. The pics where taken from the greenbelt (outside the chainlink fenced project area). Location is at the intersection of E. Front Runner and S. Homestretch. No issues observed
General Inspection10/20/201510/20/201510/20/2015 PASS
DetailsAndy J. Long
WIP on exterior siding and framing at Park Place. No trackout or discharges from site, no construction site litter accumulations in surrounding areas of MA Williams Park. All DIs have sediment protection. Trash containment bins are on site as well as lined concrete washout box. Approved.
General Inspection10/5/201510/5/201510/5/2015 PASS
DetailsAndy J. Long
WIP on Park Place (MA Williams Park townhomes) at east end of development area. Site has perimeter chain link fence installed to contorl access and wind blown trash/material wrappings. SWPPP and permit information posted. Wattles installed at south side of project to protect drainage swale/wetland area

No trackout, storm drains have inlet bags installed, no spills or discharges observed. No concrete work currently but lined washout box is on site.

No corrections issued.
Random Inspection9/18/20159/18/20159/18/2015PPASS
DetailsAndy J. Long
WIP on Barber Station/Park Place townhomes. Site chain link fence is in place, no wind blown trash debris observed. Workers parking on paved surfaces, no trackout. No corrections at this time.
General Inspection9/4/20159/4/20159/4/2015 PASS
DetailsEvan Jenkins
General Inspection8/13/20158/20/20158/20/2015PPASS
DetailsAndy J. Long
No trackout or discharges from construction activity at Park Place. WIP. Trash is contained. No perimeter fencing has been installed, but not seeing a litter issue currently. Fence is still scheduled to be installed.

No corrections.
General Inspection8/13/20158/13/20158/13/2015 PART
DetailsAndy J. Long
Vertical construction on townhomes in progress. No earthwork occuring. Townhomes covered individually by Brighton Homes. No fugitive dust, trackout, litter, or discharge issues observed.

Still need to install fencing along south side of project area to keep workers and trash out of swale.
General Inspection7/29/20157/29/20157/29/2015 FAIL
DetailsEvan Jenkins
Building debris strung throughout project, laying in road. Laying outside of empty trash bin as well. Sediment curb that needs swept
BMP Violation7/10/20157/13/20157/13/2015APEND
DetailsAndy J. Long
Check that trash has been picked up.

Site perimeter fence is not up yet. Some litter was collected but swale still needs further clean up and a trash enclosure.. Notice given Brighton to continue clean up and install fence and trash container. Need to be in place by Wednesday.
BMP Violation7/9/20157/9/20157/9/2015PFAIL
DetailsAndy J. Long
No erosion or sediment violations occuring but due to lack of trash and material enclosure some construction related waste and litter has blown into the swale in the park.

Correction request:
1. Pick up trash today and tomorrow in the swale along the length of the project.
2. Provide trash enclosure and make sure it is large enough and serviced frequently.
3. Install perimeter fencing to catch any wind blown material from blowing into swale or towards river.

Correction issued to Brighton Corp RP Danial and Brighton Homes RP Erbie. Danial will provide fencing next week, trash bins will be built for use next week.

Both will work on trash clean up today and tomorrow. Will check back
General Inspection7/6/20157/6/20157/6/2015 PASS
DetailsAndy J. Long
BMPs installed and include lined washout bin, DI protection, and perimeter sediment control. Crews onsite working on foundations and plumbing for new townhomes. Trash is contained. WIP, no corrections needed currently.
General Inspection6/19/20156/19/20156/19/2015 PART
DetailsAndy J. Long
Site in good condition. No runoff or sediment leaving site. No fugitive dust.

Just need to install lined concrete washout for the new townhomes that have just started.
General Inspection6/3/20156/3/20156/3/2015 PASS
DetailsEvan Jenkins
General Inspection5/19/20155/19/20155/19/2015APASS
DetailsAndy J. Long
No activity currently site. All roads and infrastructure for the townhomes at Barber Station (Marianne Williams Park). DIs on Barber Valley and within complex have filter bag protection.

Straw wattles on south side of site initially installed to protect swale inside park have been removed. Border of site has new sidewalk containing the project area and banks of swale have been sodded. No corrections at this time.
General Inspection5/1/20155/1/20155/1/2015PPASS
DetailsAndy J. Long
Barber Valley townhomes (aka Park Place aka Marian Williams Park TH) Roads and curbs complete on first phase and all utilities for all 3 phase are complete. Security fence has been removed. No further dewatering to occur.

New phase/ESC site map update has been included in the SWPPP binder per RP Danial with Brighton Corp.

BMPs installed, no discharges, fugitive dust or other issues. Permit posted.

No active cement work currently, but washouts available for this project and sidewalk project.
General Inspection4/6/20154/6/20154/6/2015APART
DetailsAndy J. Long
WIP on landscaping site perimeter for new townhomes. No vertical construction has started. Permit is posted, no trackout. Perimeter wattle protecting drainage swale on south side of site and work has remained within limits of disturbance.

Correction:

Check inlets on Barber Valley on the south side of street. Inlet to the west of permit sign has damaged sediment bag and newly installed inlet to the east does not yet have protection.

Verbal request to Brighton RP Danial
General Inspection3/4/20153/4/20153/4/2015PPASS
DetailsAndy J. Long
Barber Station/MAWP townhome project is in progress. Site is still enclosed with security fencing and has perimeter wattles on the south side to protect the swale/wetland area in the park. Permit is posted, no trackout or discharges observed, no significant fugitve dust, and leakproof concrete washout bins are on site.

Roads, parking lot, and curbing are in progress. Utilites and sewer already installed. No further dewatering anticipated.
Random Inspection1/28/20151/28/20151/28/2015PPASS
DetailsAndy J. Long
Barber Station/Marianne Williams Park townhomes has limited activity occuring. No trackout, permit posted, no discharges or dewatering occuring currently. Project in compliance.
Random Inspection1/15/20151/15/20151/15/2015APASS
DetailsAndy J. Long
Barber Valley /Marian Willams Park townhome project is in progress. All sewer work is complete and no dewatering is in progress. Currently there is very little activity at site.

No trackout, permit posted, SWPPP and NOI at site.
Random Inspection12/18/201412/18/201412/18/2014PPASS
DetailsAndy J. Long
Dewatering operations are complete and settling ponds have been filled in and compacted. No major activity currently at site, no trackout or discharges observed.

The offsite utility project also appears to be near completion.

Approved.
Random Inspection12/8/201412/8/201412/8/2014APASS
DetailsAndy J. Long
Inspection conducted to check that dewatering operations are not discharging offsite.

Dewatering pumps have been moved to the east side of site where active trench is occuring. The 4 settling/infiltration ponds on the west end of site are currently full and water is being diverted into an alternate receiving pond that drains into a well head. No new water enter full ponds, and no water being discharged offsite and no system set up to discharge observed.

Some minor trackout, but no other violations observed. Will update Brighton RP on progress.

Approved.
General Inspection12/4/201412/4/201412/4/2014PPASS
DetailsAndy J. Long
Inspection conducted to check on dewatering system. Dewatering still in progress with two pumps. All 4 ponds have water in them and are at about 75% capacity. Brown Construction worker stated they do not anticipate the ponds tfilling beyond capacity.

I stated that pond levels should be monitored closely and that if levels get close a diversion to the open land area with berm should be used. No discharge to the swale within park allowed. He stated dewatering should only be for 4-5 more days.

No violations observed. Approved.
Random Inspection12/1/201412/1/201412/1/2014PPASS
DetailsAndy J. Long
Barber Valley townhome site is in progress including onsite utility/stormwater/sewer work and the off-site power line trench to the northwest of site.

No trackout from either locations, equipment is kept on site. No dewatering to offsite swale in park occuring until approval gained from Parks n Rec. Brighton RP notified to consider different options than discharging into swale. Currently the onsite dewatering mote and series of 4 settling/infiltration ponds have been constructed and are in use. The water in the 4 chamber is visibly clearer indicating treatment. No pipes or conveyance to swale has been installed and current capacity appears adequate.

No corrections at this time.
General Inspection11/24/201411/24/201411/24/2014PPASS
DetailsAndy J. Long
Wattles along power line trench are installed properly in between project area and the vegetative buffer of Walling Creek . WIP. No dewatering occuring. Approved.
General Inspection11/21/201411/21/201411/24/2014PCANC
DetailsAndy J. Long
rescheduled
Site Preparation11/19/201411/19/201411/19/2014APASS
DetailsAndy J. Long
Met RP Danial of Brighton Corp. onsite to review plans and BMP installations for Barber Valley townhome sub. Site is surrounded security fencing to delineate area of disturbance, control access. Permit and NOI info posted at entrance. Wattles have been placed on the south perimeter of the site (between swales and river) and are trenched in. The offsite power trench BMPs will be installed prior to disturbance and inspected seperately.

Discussed future dewatering and instructed that Boise Parks and Rec will be involved because they own the swales and pond that treated water will be discharged to.

Approved for construction.